Loading...
HomeMy WebLinkAbout20200705 Ver 1_USACE More Info Request_20200624Strickland, Bev From: Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil> Sent: Wednesday, June 24, 2020 5:11 PM To: Tyson Kurtz Cc: Homewood, Sue; Clement Riddle Subject: [External] ASU Child Care PCN AID 2020-00959 Request for additional information Follow Up Flag: Follow up Flag Status: Flagged External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Tyson, Thanks for meeting out the other day. As discussed, I had several questions relating to avoidance and minimization efforts on the design that was included in the PCN which I've outlined below. Also we discussed mitigation requirements in relation to past impacts which just on this parcel alone appear to be at least 200-300 linear feet of perennial stream channel that has been culverted at some point in the past. So with that said, any additional stream impacts at this point would trigger mitigation and a mitigation plan should be submitted with the PCN that adequately offsets impacts. Mitigation ratios typically start at 2:1 unless you conduct NCSAM and depending on the results, potentially a reduced ratio can be applied. With regards to avoid/minimization, please provide additional information/ clarification on the following to continue the review of this application: 1. Please provide information as to why a second access/road crossing is needed for the facilities expansion and will this crossing/area provide parking as well. It is also unclear from the plans the need to fill the entire length of the stream channel versus just have a more narrow road crossing with retaining walls. Please discuss if retaining walls could be used which would minimize impacts to the stream channel. 2. Also please address why other portions of the parcel that are currently open/not developed could not be used for the facility which have existing pipes/culverts and would not require much if any additional stream piping. Once I receive this information, I will review and provide follow up questions/comments as needed. Feel free to give me a call with any questions, thanks. Amanda Jones Regulatory Specialist U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 828-271-7980 ext. 4225