Loading...
HomeMy WebLinkAboutNC0000396_Compliance Evaluation Inspection_20200625DocuSign Envelope ID: 923D92A1-05C2-4619-BC96-5ACE9142E8D8 ROY COOPER Governor MICHAEL 5. REGAN secreary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality June 24, 2020 Teresa Williams, Lead Environmental Field Specialist Duke Energy Progress LLC 46 Duke Energy Lane Arden, NC 28704 SUBJECT: Compliance Inspection Report Asheville Steam Electric Power Plant NPDES WW Permit No. NC0000396 Buncombe County Dear Permittee: The North Carolina Division of Water Resources conducted a Bioassay Compliance inspection of the Asheville Steam Electric Power Plant on 6/9/2020 and 6/11/2020. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0000396 for this permit condition. The test resulted in a pass and facility appeared to be in compliance with permit NC0000396. Findings and comments noted during this inspection are provided in the enclosed copy of the inspection report. There were no significant issues or findings noted during the inspection and therefore, a response to this inspection report is not required. If you should have any questions, please do not hesitate to contact Timothy Heim with the Water Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at tim.heim@ncdenr.gov. Sincerely, DocuSigned by: ( bf j lkuwA 082B1105A3CA418... Tim Heim, P.E. (For) G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ ATTACHMENTS Ec: LF Nortr:;,. raDepartmentofEnvironmental Quslrty I BivistrtofWater Resources <-,-D—FQ�, .4srav a kagnna.Off:ce 1 2090 V.S. 70Hthxr3y I Sw nsnoa, North Caro:ina 23773 �S2 �S,e?fi-0504