HomeMy WebLinkAboutNC0000396_Compliance Evaluation Inspection_20200625DocuSign Envelope ID: 923D92A1-05C2-4619-BC96-5ACE9142E8D8
ROY COOPER
Governor
MICHAEL 5. REGAN
secreary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
June 24, 2020
Teresa Williams, Lead Environmental Field Specialist
Duke Energy Progress LLC
46 Duke Energy Lane
Arden, NC 28704
SUBJECT: Compliance Inspection Report
Asheville Steam Electric Power Plant
NPDES WW Permit No. NC0000396
Buncombe County
Dear Permittee:
The North Carolina Division of Water Resources conducted a Bioassay Compliance inspection of the Asheville
Steam Electric Power Plant on 6/9/2020 and 6/11/2020. This inspection was conducted to verify that the
facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No.
NC0000396 for this permit condition. The test resulted in a pass and facility appeared to be in compliance
with permit NC0000396. Findings and comments noted during this inspection are provided in the enclosed
copy of the inspection report.
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Timothy Heim with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
tim.heim@ncdenr.gov.
Sincerely,
DocuSigned by:
( bf j lkuwA
082B1105A3CA418...
Tim Heim, P.E. (For)
G. Landon Davidson, P.G., Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ