Loading...
HomeMy WebLinkAboutNCC202688_ESC Approval Submitted_20200625ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality June 5, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Elan Indian Trail Owner, LLC Attention: Joshua Glover, VP 521 Morehead Street, Suite 400 Charlotte, North Carolina 28202 RE: Project Name: Elan at Indian trail Acres Approved: 14.0 Project ID: UNION-2020-074 County: Union, City: Indian Trail Address: Chestnut Parkway River Basin: Yadkin -Pee Dee Stream Classification: Other Submitted By: Jeremy Icard, PE, LandDesign Date Received by LQS: May 22, 2020 Plan Type: Revised Dear Mr. Glover: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NC GO 1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: �/j//QJ NORTH CAROt.INn R �4" DVMt .t W Enrko- Uualtty North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 704,663.1699 Letter of Approval with Modifications Elan Indian Trail Owner, LLC June 5, 2020 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I13A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Inspection Department ec: Jeremy Icard, PE Letter of Approval with Modifications Elan Indian Trail Owner, LLC June 5, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Elan at Indian Trail Project ID: UNION-2020-074 County: Union 1. The plans shall incorporate temporary impacts to the wetlands for new access road on the North side of stream for areas where a 15' buffer cannot be obtained and/or is not included with the permanent impacts. In addition, none of the wetlands shall be disturbed until all required permits from DWR and/or USACE have been obtained. Submit approvals to DEMLR once received. 2. Silt fence shall be provided below the disturbed area to install the storm drainage outlet from the permanent BMP (Stage 3, Sheet C-4.06). 3. A construction detail shall be provided for the temporary stream by-pass channel showing width and depth of required by-pass channel. In addition, a sandbag coffer dam detail must be provided and have a minimum 3' height and top crest width.