Loading...
HomeMy WebLinkAboutNCC202658_ESC Approval Submitted_20200624�, pE,x O'pjy �O� CA June 22, 2020 Mark Stiglitz Epcon Communities 119 Weston Parkway Cary, NC 27519 Re: Letter of Plan Approval Project Name: The Courtyards on Holt Project Location: Project Number: Submitted By:. Date Submitted: Disturbed Area: 1337 Holt Road 19-004 Peak Engineering August 1, 2019 26.66 WATER RESOURCES The Soil Erosion and Sedimentation Control Plan (S&E) you submitted has been reviewed and accepted. The Town of Apex (Town) hereby issues this Letter of Plan Approval. The Town's S&E program is performance oriented, requiring protection of the natural resources and adjoining properties. If at any time during this project it is determined by Town staff that the approved S&E Plan is inadequate to meet the Town's S&E ordinance, this office may require revisions to the S&E Plan and its implementation to ensure compliance with the S&E ordinance (Section 5- 154). In accordance with Section 5-158 of the Town's S&E ordinance, you are hereby notified that this office has the right to periodically inspect any land -disturbing activities to ensure compliance with the approved S&E Plan and ordinance. You are to notify this office twenty- four (24) hours before starting work. You are also required to keep the working drawings on site. Stormwater runoff generated from sites disturbing one (1) acre or more is permitted pursuant to the National Pollution Discharge Elimination System (NPDES) administered in North Carolina by the Division of Energy, Mineral and Land Resources; Stormwater Section. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NCI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org Letter of Plan Approval Page 2 of 2 commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deg.nc.eov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. The Contractor will be permitted to clear only as necessary to install the required S&E measures. Once the required S&E measures are installed, contact Public Works staff to schedule an on -site inspection. A Certificate of Compliance will be issued after a site inspection is completed to ensure that the S&E measures are installed per the approved S&E Plan and a copy of the State issued Certificate of Coverage (COC) is received by the Town. Please note that a Certificate of Compliance is required prior to receiving a grading permit from the Building Inspections Division. The approval of an S&E Plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations, and rules. In addition, the Town's NPDES Phase II permit requires site contractors to control construction site wastes that may cause adverse water quality impacts. Please have your site contractor review the attached Town Construction Site Waste Management Plan to become familiar with the requirements. Town staff will inspect your site to ensure these waste management practices are being implemented. You will need to provide evidence of compliance if applicable. I look forward to working with you on this project and if you have any questions, please call (919) 249-1166. Regards, James Misciagno, CPESC Environmental Engineering Enclosures: Town Construction Site Waste Management Plan TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org