Loading...
HomeMy WebLinkAbout520063_Plan of Action_20200619Jun 19 2020 02:34PM Selby Land Concepts 2529646775 page 15 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIF,�i Facility Number: Jr.Z 63 .�oA/ES u 94. �2 Facility xe,s County: Certified Operator Name: Ke-I r ! M-jLtcf Operator # 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): 'A / Spillway (Yes or No) Level (inches) 2. Check all applicable items W 3o Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: .% AO/ 11 ?-0ZO I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Firs/ N/.tiJ Owner/Manager (print) Facility OwnerfManager (signature) PoA Cover Page 2/21/00 Phone: ZSZ - 621 -16 90 Date: 6" /B 102 0 e(�0 Jun 19 2020 02:34PM Selby Land Concepts 2529646775 page 16 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD �� I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE SUN 1. Structure Name/identifier (ID): 52-63 Edgar Mills 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 30.0 inches q 9 b. designed 25 yr.124 hr. storm & structural freeboard 31.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 279503 f12 a line c/12 x lined x 7.48 gallons/ft' 174224 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 232094 ft3 In. current herd # 5280 certified herd # 7040 actual waste produced = current herd # x line g = 174071 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 daysiline f= 4. Total PAN to be land applied during draw down period I. Current waste analysis dated 1 1127/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) POA (30 Day) 2/21100 �Ifta 1-220�587 ft3 492006 gallons 0.96 Ibs/1000 gal. 639.6 lbs PAN 4- Jun 19 2020 0234PM Selby Land Concepts 2529646775 page 17 ✓Gy 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 26 YR./24 Ay�,o 2 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY � 0 a 1. Structure ID: 52-63 Edgar Mills line m = 639.6 lb PAN fl 2. Structure ID'. line m = lb PAN �i 3. Structure ID. line m = lb PAN 4. Structure ID. line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 639.6lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PVRInn nn NOT I IST FIELDS Tn WHICH PAN CANNOT RE APPLIED DURING THIS 30 DAY PERIOD. 0. tract # p. field # q. crap I. acres s. remaining RR 2 PAN balance (lblacre) t TOTAL PAN eALANCE FOR FIELD (lbs.) column r x s u. applicancr window PIVOT Corn 25.92 12000 3110.4 2/15-6130 HYD-19 Soybean 3.02 127.84 386.1 411 -oil 5 HYD-18 Soybean 4.05 121.15 490.7 4/1-9/15 HYD-17 Soybean 518 12583 651.8 411-9115 'State current crop ending application date or next crop application beginning Dace Tor avauaoie receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4639.0 Ib. PAN �f FDA (30 Day) 2/21/00 Jun 19 2020 02:35PM Selby Land Concepts 2529646775 page 18 M FACILITY'S POA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) _ x. Crop's remaining PAN balance (line v from section HI) _ y. Overall PAN balance (w - x) �4tb vo%2 A 639.6 lb. PAN 4639.0 lb. PAN -3999 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Date: 4/25/17 Eve H. Honeycutt Extension Agent Agriculture, Livestock Certified Technical Specialist PoA (30 Day) 2121100 �"l