HomeMy WebLinkAbout520063_Plan of Action_20200619Jun 19 2020 02:34PM Selby Land Concepts 2529646775
page 15
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIF,�i
Facility Number: Jr.Z 63 .�oA/ES u 94. �2
Facility
xe,s
County:
Certified Operator Name: Ke-I r ! M-jLtcf Operator #
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): 'A /
Spillway (Yes or No)
Level (inches)
2. Check all applicable items
W
3o
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: .% AO/ 11 ?-0ZO
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Firs/ N/.tiJ
Owner/Manager (print)
Facility OwnerfManager (signature)
PoA Cover Page 2/21/00
Phone:
ZSZ - 621 -16 90
Date: 6" /B 102 0
e(�0
Jun 19 2020 02:34PM Selby Land Concepts 2529646775
page 16
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
��
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE SUN
1. Structure Name/identifier (ID): 52-63 Edgar Mills
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 30.0 inches
q 9
b. designed 25 yr.124 hr. storm & structural freeboard 31.0 inches
c. line b - line a (inches in red zone) = 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 279503 f12
a line c/12 x lined x 7.48 gallons/ft' 174224 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 232094 ft3
In. current herd # 5280 certified herd # 7040
actual waste produced = current herd # x line g = 174071 ft'
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 daysiline f=
4. Total PAN to be land applied during draw down period
I. Current waste analysis dated 1 1127/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
POA (30 Day) 2/21100
�Ifta
1-220�587 ft3
492006 gallons
0.96 Ibs/1000 gal.
639.6 lbs PAN
4-
Jun 19 2020 0234PM Selby Land Concepts 2529646775 page 17
✓Gy 1
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 26 YR./24
Ay�,o 2
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
�
0 a
1.
Structure ID: 52-63 Edgar Mills
line m = 639.6
lb PAN
fl
2.
Structure ID'.
line m =
lb PAN
�i
3.
Structure ID.
line m =
lb PAN
4.
Structure ID.
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID
line m =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 639.6lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PVRInn nn NOT I IST FIELDS Tn WHICH PAN CANNOT RE APPLIED DURING THIS 30 DAY PERIOD.
0. tract #
p. field #
q. crap
I. acres
s. remaining RR
2 PAN balance
(lblacre)
t TOTAL PAN
eALANCE FOR
FIELD (lbs.)
column r x s
u. applicancr window
PIVOT
Corn
25.92
12000
3110.4
2/15-6130
HYD-19
Soybean
3.02
127.84
386.1
411 -oil 5
HYD-18
Soybean
4.05
121.15
490.7
4/1-9/15
HYD-17
Soybean
518
12583
651.8
411-9115
'State current crop ending application date or next crop application beginning Dace Tor avauaoie
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 4639.0 Ib. PAN
�f
FDA (30 Day) 2/21/00
Jun 19 2020 02:35PM Selby Land Concepts 2529646775 page 18
M FACILITY'S POA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) _
x. Crop's remaining PAN balance (line v from section HI) _
y. Overall PAN balance (w - x)
�4tb
vo%2 A
639.6 lb. PAN
4639.0 lb. PAN
-3999 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Date: 4/25/17
Eve H. Honeycutt
Extension Agent
Agriculture, Livestock
Certified Technical Specialist
PoA (30 Day) 2121100 �"l