PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
Facility
County: � JDAMT
O�y
0
.✓` 2— o�y�-
Certified Operator Name: D ojAL- A-y oz Operator # Ilk
Certified
7 &N, a y o;P
Sz 2
Current liquid level(s) in inches as measured from the current liquid level in the ,. o ttie
lowest point on the top of the dam for lagoons without spillways; and from the Curren level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): .4k l AJ
Spillway (Yes or No):
Level (inches): —6 16
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
attach a complete schedule with corresponding animal units and dates for depopulation
if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: jJiJE 22 , to Zo
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
`7�p Al-O 744P4. Phone:
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
PoA Cover Page 2121100
. 5Z - -5-60 -155E&
Date: ';. ,r J /97 ZO ZD
Jun 19 2020 02:31PM Selby Land Concepts 2529646775
page 3
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID).
Lagoon #1 52-2
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr.124 hr storm & structural freeboard
c line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft'
3. Projected volume of waste liquid produced during draw down period
19.5 inches
3.5 inches
49010 It
106923 gallons
I. temporary storage period according to structural design
180 days
g. volume of waste produced according to structural design
55221 ft'
h. current herd # 1400 certified herd # 1600
actual waste produced = current herd # x line g =
48318 ft'
certified herd #
i, volume of wash water according to structural design
0W
j, excess rainfall over evaporation according to design
29942.5 ft3
k. (lines h + i +j) x 7.48 x 30 days/line f=
97565 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 2/21/2020 1.26 Ibs11000 gal.
m. ((lines e + k)11000) x line I = 257.7 Ibs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click an the next Structure tab shown below)
evf
PoA (30 Day) 2/21100
Jun 19 2020 02:31PM Selby Land Concepts 2529646775
page 4
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIE
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelldentifier (ID): 1 Lagoon #3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 16.0
b. designed 25 yr.124 hr. storm & structural freeboard 19.5
c. line b - line a (inches in red zone) = 3.5
d, top of dike surface area according to design
(area at below structural freeboard elevation) 102545.2
a. line c/12 x line d x 7.48 gallons/ft' 223719
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180
g. volume of waste produced according to structural design 221390.4
h. current herd # 2000 certified herd # 4000
actual waste produced = current herd # x line g = 110695
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design 89762.7
k. (lines h + i + j) x 7.48 x 30 days/line f= 249904
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 2121/'2020 0.81
m. ((lines e + k)11000) x line I = 383.6
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
VV
PoA (30 Day) 2121100
Jun 19 2020 0231PM Selby Land Concepts 2529646775
page 5
. v
It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE
STRUCTURES FOR FACILITY
1.
Structure ID: Lagoon #1
line m = 2577 lb PAN
2
Structure ID: Lagoon #3
line m = 383.6 lb PAN
3.
Structure ID:
line m = lb PAN
4.
Structure ID:
line m = lb PAN
5.
Structure ID:
line m = lb PAN
6.
Structure ID:
line m = lb PAN
n. lines 1+2+3+4+5+6= 641.3 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
O. tract #
p. field #
g. crop
r. acres
s. remaining IRR
2 PAN balance
(Vacre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
u. application window
240
HYD #7
Soybeans
4.32
152.00
656.6
4/1-9/15
HYD #8
Soybeans
4.32
152.00
656.E
4/1-9/15
HYD #9
Soybeans
4.32
152.00
656 6
4/1-9/15
HYD #10
Soybeans
4.321
15200
656.6
411-9/15
HYD #11
Soybeans
4.99j
15200
758.5
4/1-9/15
HYD #12
Soybeans
4.99
15200
758,5
411-9/15
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) =
PoA (30 Day) 2/21/00
4143.0 lb. PAN
,Pf
Jun 19 2020 0231PM Selby Land Concepts 2529646775 page 6
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11)
x. Crop's remaining PAN balance (line v from section III) _
Y. Overall PAN balance (w • x) _
6413I
41430 II
3502 II
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
Wds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Date: 4/25/17
Eve H. Honeycutt
Extension Agent
Agriculture, Livestock
Certified Technical Specialist
PoA (30 Day) 2121100