Loading...
HomeMy WebLinkAbout520002_Plan of Action_20200619Jun 19 2020 02:31PM Selby Land Concepts 2529646775 page 2 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility County: � JDAMT O�y 0 .✓` 2— o�y�- Certified Operator Name: D ojAL- A-y oz Operator # Ilk Certified 7 &N, a y o;P Sz 2 Current liquid level(s) in inches as measured from the current liquid level in the ,. o ttie lowest point on the top of the dam for lagoons without spillways; and from the Curren level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): .4k l AJ Spillway (Yes or No): Level (inches): —6 16 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. attach a complete schedule with corresponding animal units and dates for depopulation if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: jJiJE 22 , to Zo I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. `7�p Al-O 744P4. Phone: Facility Owner/Manager (print) Facility Owner/Manager (signature) PoA Cover Page 2121100 . 5Z - -5-60 -155E& Date: ';. ,r J /97 ZO ZD Jun 19 2020 02:31PM Selby Land Concepts 2529646775 page 3 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID). Lagoon #1 52-2 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr storm & structural freeboard c line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period 19.5 inches 3.5 inches 49010 It 106923 gallons I. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 55221 ft' h. current herd # 1400 certified herd # 1600 actual waste produced = current herd # x line g = 48318 ft' certified herd # i, volume of wash water according to structural design 0W j, excess rainfall over evaporation according to design 29942.5 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 97565 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 2/21/2020 1.26 Ibs11000 gal. m. ((lines e + k)11000) x line I = 257.7 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click an the next Structure tab shown below) evf PoA (30 Day) 2/21100 Jun 19 2020 02:31PM Selby Land Concepts 2529646775 page 4 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIE 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): 1 Lagoon #3 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 16.0 b. designed 25 yr.124 hr. storm & structural freeboard 19.5 c. line b - line a (inches in red zone) = 3.5 d, top of dike surface area according to design (area at below structural freeboard elevation) 102545.2 a. line c/12 x line d x 7.48 gallons/ft' 223719 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 g. volume of waste produced according to structural design 221390.4 h. current herd # 2000 certified herd # 4000 actual waste produced = current herd # x line g = 110695 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design 89762.7 k. (lines h + i + j) x 7.48 x 30 days/line f= 249904 4. Total PAN to be land applied during draw down period I. current waste analysis dated 2121/'2020 0.81 m. ((lines e + k)11000) x line I = 383.6 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) VV PoA (30 Day) 2121100 Jun 19 2020 0231PM Selby Land Concepts 2529646775 page 5 . v It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon #1 line m = 2577 lb PAN 2 Structure ID: Lagoon #3 line m = 383.6 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1+2+3+4+5+6= 641.3 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. O. tract # p. field # g. crop r. acres s. remaining IRR 2 PAN balance (Vacre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) u. application window 240 HYD #7 Soybeans 4.32 152.00 656.6 4/1-9/15 HYD #8 Soybeans 4.32 152.00 656.E 4/1-9/15 HYD #9 Soybeans 4.32 152.00 656 6 4/1-9/15 HYD #10 Soybeans 4.321 15200 656.6 411-9/15 HYD #11 Soybeans 4.99j 15200 758.5 4/1-9/15 HYD #12 Soybeans 4.99 15200 758,5 411-9/15 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = PoA (30 Day) 2/21/00 4143.0 lb. PAN ,Pf Jun 19 2020 0231PM Selby Land Concepts 2529646775 page 6 IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) x. Crop's remaining PAN balance (line v from section III) _ Y. Overall PAN balance (w • x) _ 6413I 41430 II 3502 II Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these Wds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Date: 4/25/17 Eve H. Honeycutt Extension Agent Agriculture, Livestock Certified Technical Specialist PoA (30 Day) 2121100