Loading...
HomeMy WebLinkAbout20200817 Ver 1_2020-01-31 Farrington SW Narrative_certified_20200619 Engineers & Planners Firm License No. P-1199 PHONE WEB 2755-B Charles Blvd. | Greenville, NC 27858 252-558-0888 www.arkconsultinggroup.com MEMORANDUM TO: Daryl Norris, PE, City of Greenville FROM: Dan Withers, PE DATE: January 31, 2020 SUBJECT: Farrington Trace - Stormwater Management Narrative The purpose of this memorandum is to describe the methods proposed to meet City of Greenville’s Stormwater Management and Control Ordinance (“Ordinance”) for the proposed Farrington Trace project, a development of multi- family housing on the north side of Firetower Road in Greenville, North Carolina. The project includes a subdivision of an existing 13 +/- acre parcel. This management plan includes the proposed multi-family parcel and the roadway to serve the subdivision, but excludes the two outparcels, which total 5.15 acres. The site of the development is currently used for agriculture but has a significant amount of uncleared woods. The site drains to Meeting House Branch, a tributary of the Tar River. The nitrogen and phosphorous export from the proposed development are calculated in the attached worksheets. In accordance with City development regulations, mitigation of nutrient export from the site will be accomplished by purchase of nutrient offsets from a qualified mitigation bank. The nutrient offsets are calculated in the following Tables 1 and 2. Export Rate (lb/ac/yr) Target Rate (lb/ac/yr) Rate Increase (lb/ac/yr) Duration (years) Area (acres) Total Load (lb) Bypassing SCM (Catchment 1) 4.79 4.0 0.79 30 4.75 112.58 Treated by SCM (Catchment 2) 9.23 4.0 5.23 30 3.05 478.55 Table 1. Nitrogen offset calculation. Export Rate (lb/ac/yr) Target Rate (lb/ac/yr) Rate Increase (lb/ac/yr) Duration (years) Area (acres) Total Load (lb) Bypassing SCM (Catchment 1) 0.64 0.51 0.13 30 4.75 18.53 Treated by SCM (Catchment 2) 0.72 0.51 0.22 30 3.05 20.13 Table 2. Phosphorous offset calculation. The total nitrogen offset required is 591.13 lb and the total phosphorous offset required is 38.66 lb. In accordance with the City’s stormwater ordinance, the proposed development will attenuate peak flow from a portion of the site using a wet pond in order to ensure that there is no net increase in runoff and accomplish the nutrient removals computed in the offset calculations above. Wet pond design calculations are enclosed, and routing calculations prepared using Autodesk Hydraflow software are enclosed. Tar-Pamlico Stormwater Rule 15A NCAC 2B .0258 Last Modified 1/31/2020 Coastal Plain of the Tar-Pamlico River Basin: Includes Greenville and Washington as well as Pitt and Beaufort Counties Total Nitrogen and Total Phosphorus Loading Calculation Worksheet (Automated) Project Name:Farrington Trace Date:1/31/2020 By:JDW Checked By:STA Directions (same for pre-development and post-development tables): Pre-development: (2)(3)(4)(5)(6)(7) Area (acres) S.M. Formula (0.51 + 9.1 I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 0.00 0.51 2.60 0.00 0.19 0.00 0.00 0.51 1.95 0.00 0.11 0.00 0.00 0.51 1.42 0.00 0.28 0.00 6.13 0.51 4.23 13.23 1.23 3.85 0.00 0.51 2.04 0.00 0.62 0.00 1.66 0.51 0.95 0.81 0.14 0.12 0.00 TN Loading (lb/yr) =14.03 TP Loading (lb/yr) =3.96 7.79 TN Exp. Coeff. (lb/ac/yr) =1.80 TP Exp. Coeff. (lb/ac/yr) =0.51 Post-development: (2)(3)(4)(5)(6)(7) Area (acres) S.M. Formula (0.51 + 9.1 I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 2.28 4.39 2.60 26.00 0.19 1.90 1.04 4.39 1.95 8.90 0.11 0.50 3.19 4.39 1.42 19.89 0.28 3.92 1.28 4.39 0.94 5.28 0.14 0.79 0.43 TN Loading (lb/yr) =60.07 TP Loading (lb/yr) =7.11 7.79 TN Exp. Coeff. (lb/ac/yr) =7.71 TP Exp. Coeff. (lb/ac/yr) =0.91 Note: The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post-development nutrient loading is below these levels, then no BMP is necessary. Otherwise, the next worksheet calculates post-development TN and TP loadings after BMPs are installed. Wooded pervious Type of Land Cover (1) Roof impervious Managed pervious (pasture) > Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the values in light blue. > Compare total areas of development in pre- and post- tables for consistency (bottom of column (2)), and also for consistency with the site plans. If all of these values are not the same, there is an error that must be corrected. > Unless drainage onto the development from offsite is diverted around or through the site, offsite catchment area draining in must be included in the acreage values and treated. (1) Type of Land Cover Total Area of Development = Fraction Impervious (I) = Managed pervious (lawn/landscaped) Wooded pervious Total Area of Development = Transportation impervious Fraction Impervious (I) = Roof impervious Managed pervious Managed pervious (cropland) Transportation impervious Tar-Pamlico Stormwater Rule 15A NCAC 2B .0258 Last Modified 5/23/03 Coastal Plain of the Tar-Pamlico River Basin: Includes Greenville and Washington as well as Pitt and Beaufort Counties BMP Removal Calculation Worksheet (Automated) Project Name:Farrington Trace Date:1/31/2020 By:JDW Checked By:STA Directions: TN TP Design Standard BMP 25 40 NC BMP Manual Nutrient 40 35 NC BMP Manual Removal 35 45 NC BMP Manual Rates 35 45 NC BMP Manual 20 20 NC BMP Manual 20 35 NC BMP Manual 10 10 NC BMP Manual Catchment 1: Total acreage of catchment 1 =4.75 ac First BMP's TN removal rate = % First BMP's TP removal rate = % Second BMP's TN removal rate = % Second BMP's TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE =0 % TOTAL TP REMOVAL RATE =0 % (2)(3)(4)(5)(6)(7) Catchment Acreage S.M. Formula (0.51 + 9.1 I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 0.84 3.08 2.60 6.72 0.19 0.49 0.50 3.08 1.95 3.00 0.11 0.17 2.13 3.08 1.42 9.31 0.28 1.84 1.28 3.08 0.94 3.70 0.14 0.55 0.00 3.08 1.95 0.00 0.11 0.00 0.28 Pre-BMP TN Load (lb/yr) =22.73 Pre-BMP TP Load (lb/yr) =3.05 4.75 Pre-BMP TN Export (lb/ac/yr)4.79 Pre-BMP TP Export (lb/ac/yr)0.64 Post-BMP TN Load (lb/yr) =22.73 Post-BMP TP Load (lb/yr) =3.05 Post-BMP TN Export (lb/ac/yr)4.79 Post-BMP TP Export (lb/ac/yr)0.64 > It may be advantageous to split the development into separate catchments to be handled by separate BMPs. The tables below allow the development to be split into as many as three catchments, and can be copied for greater than three. NOTE: Unless runoff flowing onto the development from offsite is routed separately around or through the site, the offsite catchment area draining in must be included in the acreage values of the appropriate land use(s) and treated. > Above each table: Enter the catchment acreage in the top green blank. Based on a comparison of the post-development TN and TP export coefficients you calculated above to the rule requirements of 4.0 lb/ac/yr TN and 0.4 lb/ac/yr TP, select BMP(s) from the list for treating the catchment runoff. Enter the chosen BMP(s) nutrient removal rates in the green blanks. If more than one BMP is to be used in series, the combined removal rates will be calculated automatically in the blue blanks. > Catchment Tables: Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the light blue boxes. NOTE: Compare the Total Catchment Acreage for the Development (final table) to the value you established in the pre-BMP worksheet tables, and also to the site plans, for consistency. All of these values need to be the same (1) Sand Filter Wet Detention Pond Stormwater Wetland Grass Swales Vegetated Filter Strip w/ Level Spreader Bioretention Dry Detention Fraction Impervious (I) = Total Area of Development = Wooded pervious Area taken up by BMP Type of Land Cover Transportation impervious Roof impervious Managed pervious Tar-Pamlico Stormwater Rule 15A NCAC 2B .0258 Last Modified 5/23/03 Catchment 2: Total acreage of catchment 2 =3.05 ac First BMP's TN removal rate =25 % First BMP's TP removal rate =40 % Second BMP's TN removal rate = % Second BMP's TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE =25 % TOTAL TP REMOVAL RATE =40 % (2)(3)(4)(5)(6)(7) Catchment Acreage S.M. Formula (0.51 + 9.1 I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 1.44 5.97 2.60 22.35 0.19 1.63 0.54 5.97 1.95 6.29 0.11 0.35 1.07 5.97 1.42 9.07 0.28 1.79 0.00 5.97 0.94 0.00 0.14 0.00 0.25 5.97 1.95 2.91 0.11 0.16 0.60 Pre-BMP TN Load (lb/yr) =40.62 Pre-BMP TP Load (lb/yr) =3.94 3.30 Pre-BMP TN Export (lb/ac/yr)12.31 Pre-BMP TP Export (lb/ac/yr)1.19 Post-BMP TN Load (lb/yr) =30.46 Post-BMP TP Load (lb/yr) =2.36 Post-BMP TN Export (lb/ac/yr)9.23 Post-BMP TP Export (lb/ac/yr)0.72 Catchment 3: Total acreage of catchment 3 = ac First BMP's TN removal rate = % First BMP's TP removal rate = % Second BMP's TN removal rate = % Second BMP's TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE =0 % TOTAL TP REMOVAL RATE =0 % (2)(3)(4)(5)(6)(7) Catchment Acreage S.M. Formula (0.51 + 9.1 I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 2.60 0.19 1.95 0.11 1.42 0.28 0.94 0.14 1.95 0.11 Pre-BMP TN Load (lb/yr) = Pre-BMP TP Load (lb/yr) = Pre-BMP TN Export (lb/ac/yr) Pre-BMP TP Export (lb/ac/yr) Post-BMP TN Load (lb/yr) = Post-BMP TP Load (lb/yr) = Post-BMP TN Export (lb/ac/yr) Post-BMP TP Export (lb/ac/yr) Type of Land Cover Transportation impervious Area taken up by BMP Fraction Impervious (I) = Total Area of Development = Managed pervious Wooded pervious Managed pervious Wooded pervious Area taken up by BMP Fraction Impervious (I) = Total Area of Development = Roof impervious (1) Transportation impervious (1) Type of Land Cover Roof impervious Tar-Pamlico Stormwater Rule 15A NCAC 2B .0258 Last Modified 5/23/03 Weighted Average of Nutrient Loadings from the Catchments: Catchment Acreage Post-BMP TN Loading (lb/ac/yr) Post-BMP TP Loading (lb/ac/yr) 4.75 4.79 0.64 3.05 9.23 0.72 0.00 0.00 0.00 7.80 6.52 0.67 Note: The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post-development nutrient loading is below these levels, then the BMPs planned are adequate. Otherwise, additional BMPs and/or modifications in development plans are required. Catchment 1 TOTAL FOR DEVELOPMENT Catchment 2 Catchment 3 Ark Consulting Group, PLLC JOB 19045 - Farrington Trace 2755-B Charles Boulevard DATE Jan-20 Greenville, NC 27858 CALCULATED BY JDW 252-558-0888 CHECKED BY STA Units Symbols & Governing Equations Site Calculations Total Site Area (Catchment 1)3.05 ac Asite Roof Impervious 0.54 ac Aroof Transportation Impervious 1.44 ac Atrans Total Impervious Area 1.98 ac Aimpervious Percent Impervious 65 %(Aimpervious / Asite)*100 Average Depth Calculation Area of Bottom Shelf 2240 sq ft Abot_shelf Area of Permanent Pool 3529 sq ft Aperm_pool Area of Bottom of Pond 177 sq ft Abot_pond Depth 8.0 ft d Main pool volume at permanent pool elevation 10023 cu ft Vpp Main pool area at permanent pool elevation 3529 cu ft Vpp Average Depth 2.8 ft dav = Vpp / SA (Eq. 2) Average Depth (Rounded to nearest 0.5 ft)3.0 ft dav Coastal Region? (Y or N)N Surface Area/Drainage Area Ratio 2.30 %SA/DA Permanent Pool Surface Area Req'd 3056 sq ft SA/DA*Asite*43560/100 Permanent Pool Surface Area Provided 3529 sq ft Aperm_pool Size of BMP (number times minimum size)1.15 Wet Pond Design Surface Area Requirements Ark Consulting Group, PLLC JOB 19045 - Farrington Trace 2755-B Charles Boulevard DATE Jan-20 Greenville, NC 27858 CALCULATED BY JDW 252-558-0888 CHECKED BY STA Units Symbols & Governing Equations Total Site Area (Catchment 1)3.05 ac Asite Roof Impervious 0.54 ac Aroof Transportation Impervious 1.44 ac Atrans Total Impervious Area 1.98 ac Aimpervious Percent Impervious 65 %(Aimpervious / Asite)*100 Runoff Volume - Simple Method Design Storm Rainfall Depth 1.00 in RD Design Storm Runoff Volume 7022 cu ft V (Simple Method Equation) Storage Volume Provided 11722 cu ft Wet Pond Design Storage Volume Requirements Site Calculations Ark Consulting Group, PLLC JOB 19045 - Farrington Trace 2755-B Charles Boulevard DATE Jan-20 Greenville, NC 27858 CALCULATED BY JDW 252-558-0888 CHECKED BY STA Units Symbols & Governing Equations 7022 cu ft V Desired Drawdown Time (2-5 Days) 0.03 cfs Q (V/T/24/3600) 0.60 CD 1.43 ft HO 0.48 ft HO = (TPE - PPE)/3 1.22 in 1.25 in 0.03 cfs Q (Orifice Equation) 2.9 days Actual Discharge Actual Drawdown Time Driving Head Appoximate Orifice Diameter Orifice Diameter Wet Pond Design Drawdown Time Discharge Discharge Coefficient Design Storm Stage Orifice Sizing Design Storage Volume 3 days T Ark Consulting Group, PLLC JOB 19045 - Farrington Trace 2755-B Charles Boulevard DATE Jan-20 Greenville, NC 27858 CALCULATED BY JDW 252-558-0888 CHECKED BY STA Main Pool Stage Side Slope Contour Area Incremental Volume [ft][sq ft][cu ft] 0 711 2 2:1 1227 1938 5 2:1 2240 5201 6 6:1 3529 2885 Forebay 1 Stage Side Slope Contour Area Incremental Volume Percentage of Permanent Pool [ft][sq ft][cu ft] 0 195 2 2:1 606 801 3 2:1 854 730 15.3% * Acceptable range for Forebay Volume is 15%-20% of Main Pool Volume Cumulative Volume Forebay Sizing Calculations 10023 7139 60.00 Contour [cu ft] 54.00 56.00 1938 59.00 0 Contour Cumulative Volume [cu ft] 57.00 0 59.00 801 60.00 1531 Ark Consulting Group, PLLC JOB 19045 - Farrington Trace 2755-B Charles Boulevard DATE Jan-20 Greenville, NC 27858 CALCULATED BY JDW 252-558-0888 CHECKED BY STA Contour Contour Area Incremental Volume Cumulative Volume, S ln(S)Stage, Z ln(Z)ln(Z), est.Z, est. ft MSL ft^2 ft^3 ft^3 ft ft 60 4659 ----0 ----0 -------- 61 5836 5247.5 5247.5 8.565507052 1 0 0.01 1.005106885 62 7113 6474.5 11722 9.369222697 2 0.69315 0.68 1.97258572 63 8490 7801.5 19523.5 9.879374147 3 1.09861 1.11 3.02623826 Design Storm Runoff 7961 ft^3 (via simple method from SA/DA spreadsheet) Design Storm Stage 1.43 ft Design Storm El.61.43 ft MSL Surface Area at Design Storm 6371 Slope, m =1.192011934 8.559435075 Intercept, b = 8.559435075 Regression Analysis ("linest" Excel Function): Stage-Storage Function 3 3.5 4 4.5 5 5.5 6 6.5 7 7.5 8 10 0.51 0.47 0.43 0.40 0.37 0.34 0.30 0.29 0.27 0.26 0.25 11 0.54 0.50 0.46 0.43 0.39 0.36 0.32 0.30 0.29 0.28 0.27 12 0.58 0.53 0.48 0.45 0.42 0.38 0.34 0.32 0.30 0.29 0.28 13 0.61 0.56 0.51 0.48 0.44 0.40 0.36 0.34 0.32 0.31 0.30 14 0.64 0.59 0.53 0.50 0.47 0.43 0.38 0.36 0.34 0.32 0.31 15 0.68 0.62 0.56 0.53 0.49 0.45 0.41 0.38 0.36 0.34 0.33 16 0.71 0.65 0.59 0.55 0.51 0.47 0.43 0.40 0.37 0.36 0.34 17 0.74 0.68 0.61 0.58 0.54 0.49 0.45 0.42 0.39 0.37 0.36 18 0.77 0.71 0.64 0.60 0.56 0.52 0.47 0.44 0.41 0.39 0.37 19 0.81 0.74 0.66 0.63 0.59 0.54 0.49 0.46 0.42 0.40 0.39 20 0.84 0.77 0.69 0.65 0.61 0.56 0.51 0.48 0.44 0.42 0.40 21 0.87 0.79 0.72 0.67 0.63 0.58 0.53 0.49 0.46 0.44 0.42 22 0.91 0.82 0.74 0.70 0.66 0.60 0.55 0.51 0.47 0.45 0.43 23 0.94 0.85 0.77 0.72 0.68 0.63 0.57 0.53 0.49 0.47 0.45 24 0.97 0.88 0.79 0.75 0.70 0.65 0.59 0.55 0.51 0.49 0.46 25 1.01 0.91 0.82 0.77 0.73 0.67 0.62 0.57 0.53 0.50 0.48 26 1.04 0.94 0.84 0.79 0.75 0.69 0.64 0.59 0.54 0.52 0.50 27 1.07 0.97 0.87 0.82 0.77 0.71 0.66 0.61 0.56 0.54 0.51 28 1.10 1.00 0.89 0.84 0.79 0.74 0.68 0.63 0.58 0.55 0.53 29 1.14 1.03 0.92 0.87 0.82 0.76 0.70 0.65 0.59 0.57 0.54 30 1.17 1.06 0.94 0.89 0.84 0.78 0.72 0.67 0.61 0.59 0.56 31 1.20 1.09 0.97 0.92 0.87 0.80 0.74 0.68 0.63 0.60 0.58 32 1.24 1.12 1.00 0.95 0.89 0.82 0.76 0.70 0.64 0.62 0.59 33 1.27 1.15 1.03 0.97 0.92 0.85 0.78 0.72 0.66 0.63 0.61 34 1.31 1.18 1.06 1.00 0.94 0.87 0.80 0.74 0.68 0.65 0.62 35 1.34 1.22 1.09 1.03 0.97 0.89 0.82 0.76 0.70 0.67 0.64 36 1.37 1.25 1.12 1.06 0.99 0.91 0.83 0.77 0.71 0.68 0.65 37 1.41 1.28 1.15 1.08 1.02 0.93 0.85 0.79 0.73 0.70 0.67 38 1.44 1.31 1.18 1.11 1.04 0.96 0.87 0.81 0.75 0.71 0.68 39 1.48 1.34 1.21 1.14 1.07 0.98 0.89 0.83 0.76 0.73 0.70 40 1.51 1.38 1.24 1.17 1.09 1.00 0.91 0.85 0.78 0.75 0.71 41 1.54 1.40 1.27 1.19 1.11 1.02 0.93 0.86 0.80 0.76 0.73 42 1.57 1.43 1.29 1.21 1.13 1.04 0.95 0.88 0.81 0.78 0.74 43 1.59 1.46 1.32 1.24 1.16 1.07 0.98 0.90 0.83 0.79 0.76 44 1.62 1.49 1.35 1.26 1.18 1.09 1.00 0.92 0.85 0.81 0.77 45 1.65 1.51 1.38 1.29 1.20 1.11 1.02 0.94 0.87 0.83 0.79 46 1.68 1.54 1.40 1.31 1.22 1.13 1.04 0.96 0.88 0.84 0.81 47 1.71 1.57 1.43 1.34 1.24 1.15 1.06 0.98 0.90 0.86 0.82 48 1.73 1.60 1.46 1.36 1.27 1.18 1.09 1.00 0.92 0.88 0.84 49 1.76 1.62 1.48 1.39 1.29 1.20 1.11 1.02 0.93 0.89 0.85 50 1.79 1.65 1.51 1.41 1.31 1.22 1.13 1.04 0.95 0.91 0.87 51 1.82 1.68 1.54 1.43 1.33 1.24 1.15 1.06 0.97 0.93 0.89 52 1.85 1.71 1.56 1.45 1.35 1.26 1.17 1.08 0.98 0.94 0.90 53 1.88 1.73 1.59 1.48 1.36 1.27 1.18 1.09 1.00 0.96 0.92 54 1.91 1.76 1.61 1.50 1.38 1.29 1.20 1.11 1.02 0.98 0.93 55 1.94 1.79 1.64 1.52 1.40 1.31 1.22 1.13 1.04 0.99 0.95 56 1.97 1.82 1.67 1.54 1.42 1.33 1.24 1.15 1.05 1.01 0.97 57 2.00 1.85 1.69 1.56 1.44 1.35 1.26 1.16 1.07 1.03 0.98 58 2.03 1.87 1.72 1.59 1.45 1.36 1.27 1.18 1.09 1.04 1.00 59 2.06 1.90 1.74 1.61 1.47 1.38 1.29 1.20 1.10 1.06 1.01 60 2.09 1.93 1.77 1.63 1.49 1.40 1.31 1.22 1.12 1.08 1.03 Piedmont and Mountain SA/DA Table Permanent Pool Average Depth% Impervious Cover Items in bold from NCDEQ Stormwater Design Manual; others interpolated linearly. 61 2.13 1.97 1.80 1.66 1.52 1.43 1.34 1.24 1.14 1.09 1.04 62 2.17 2.00 1.83 1.69 1.55 1.46 1.36 1.26 1.16 1.11 1.06 63 2.22 2.04 1.87 1.72 1.58 1.48 1.39 1.29 1.19 1.13 1.07 64 2.26 2.08 1.90 1.76 1.61 1.51 1.41 1.31 1.21 1.15 1.09 65 2.30 2.12 1.93 1.79 1.65 1.54 1.44 1.33 1.23 1.17 1.10 66 2.34 2.15 1.96 1.82 1.68 1.57 1.46 1.36 1.25 1.18 1.11 67 2.38 2.19 1.99 1.85 1.71 1.60 1.49 1.38 1.27 1.20 1.13 68 2.43 2.23 2.03 1.88 1.74 1.62 1.51 1.40 1.30 1.22 1.14 69 2.47 2.26 2.06 1.91 1.77 1.65 1.54 1.43 1.32 1.24 1.16 70 2.51 2.30 2.09 1.95 1.80 1.68 1.56 1.45 1.34 1.26 1.17 71 2.55 2.34 2.12 1.97 1.83 1.71 1.59 1.48 1.37 1.28 1.19 72 2.59 2.37 2.15 2.00 1.85 1.73 1.61 1.50 1.40 1.31 1.22 73 2.63 2.41 2.19 2.03 1.88 1.76 1.64 1.53 1.42 1.33 1.24 74 2.67 2.45 2.22 2.06 1.91 1.79 1.66 1.56 1.45 1.36 1.26 75 2.72 2.48 2.25 2.09 1.94 1.81 1.69 1.59 1.48 1.38 1.29 76 2.76 2.52 2.28 2.12 1.96 1.84 1.72 1.61 1.51 1.41 1.31 77 2.80 2.56 2.31 2.15 1.99 1.87 1.74 1.64 1.54 1.43 1.33 78 2.84 2.59 2.35 2.18 2.02 1.89 1.77 1.67 1.56 1.46 1.35 79 2.88 2.63 2.38 2.21 2.04 1.92 1.79 1.69 1.59 1.48 1.38 80 2.92 2.67 2.41 2.24 2.07 1.95 1.82 1.72 1.62 1.51 1.40 81 2.95 2.69 2.43 2.26 2.09 1.97 1.84 1.74 1.64 1.53 1.42 82 2.99 2.72 2.46 2.29 2.12 1.99 1.86 1.76 1.66 1.55 1.44 83 3.02 2.75 2.48 2.31 2.14 2.01 1.89 1.79 1.69 1.57 1.46 84 3.05 2.78 2.50 2.33 2.17 2.04 1.91 1.81 1.71 1.59 1.48 85 3.09 2.81 2.53 2.36 2.19 2.06 1.93 1.83 1.73 1.61 1.50 86 3.12 2.83 2.55 2.38 2.21 2.08 1.95 1.85 1.75 1.63 1.51 87 3.15 2.86 2.57 2.40 2.24 2.11 1.97 1.87 1.77 1.65 1.53 88 3.18 2.89 2.59 2.43 2.26 2.13 2.00 1.90 1.80 1.67 1.55 89 3.22 2.92 2.62 2.45 2.29 2.15 2.02 1.92 1.82 1.69 1.57 90 3.25 2.95 2.64 2.48 2.31 2.18 2.04 1.94 1.84 1.72 1.59 91 3.28 2.97 2.66 2.49 2.33 2.20 2.07 1.97 1.86 1.73 1.61 92 3.31 2.99 2.67 2.51 2.35 2.23 2.10 1.99 1.88 1.75 1.62 93 3.34 3.01 2.69 2.53 2.37 2.25 2.13 2.02 1.90 1.77 1.64 94 3.37 3.04 2.70 2.55 2.39 2.28 2.16 2.04 1.92 1.79 1.65 95 3.40 3.06 2.72 2.57 2.42 2.30 2.19 2.07 1.94 1.81 1.67 96 3.43 3.08 2.73 2.58 2.44 2.33 2.22 2.09 1.96 1.82 1.69 97 3.46 3.10 2.75 2.60 2.46 2.35 2.25 2.12 1.98 1.84 1.70 98 3.49 3.13 2.76 2.62 2.48 2.38 2.28 2.14 2.00 1.86 1.72 99 3.52 3.15 2.78 2.64 2.50 2.40 2.31 2.17 2.02 1.88 1.73 100 3.55 3.17 2.79 2.66 2.52 2.43 2.34 2.19 2.04 1.90 1.75 Pre-Development Overland Flow Hydraulic length of watershed, L 180 ft Height of watershed, H 2 ft Flow Path Multiplier, K 2 Channelized Flow Hydraulic length of watershed, L 1190 ft Height of watershed, H 16 ft Flow Path Multiplier, K 0.2 Time of concentration, tc 6.7 min Time of concentration, tc 6.7 min Post-Development - Bypass Area Overland Flow Hydraulic length of watershed, L 157 ft Height of watershed, H 0.3 ft Flow Path Multiplier, K 2 Channelized Flow Hydraulic length of watershed, L 1664 ft Height of watershed, H 17.7 ft Flow Path Multiplier, K 0.2 Time of concentration, tc 11.3 min Time of concentration, tc 11.3 min Post-Development - Wet Pond DA Overland Flow Hydraulic length of watershed, L 135 ft Height of watershed, H 1 ft Flow Path Multiplier, K 2 Channelized Flow Hydraulic length of watershed, L 235 ft Height of watershed, H 2 ft Flow Path Multiplier, K 0.2 Time of concentration, tc 5.2 min Time of concentration, tc 5.2 min Time of Concentration per City of Greenville MSDD 1 2 3 4 5 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Project: 19045 Farrington Trace.gpw Friday, 01 / 31 / 2020 Hyd.Origin Description Legend 1 SCS Runoff Pre-Development 2 SCS Runoff Post-Dev Bypass 3 SCS Runoff Post-Dev Treated 4 Reservoir Pond Route 5 Combine Post-Dev Total Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph No. type hyd(s)Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 34.35 45.51 ------- 64.21 80.25 104.32 125.07 148.23 Pre-Development 2 SCS Runoff ------ 29.44 37.07 ------- 49.62 60.28 76.22 89.96 105.18 Post-Dev Bypass 3 SCS Runoff ------ 11.18 13.94 ------- 18.49 22.34 28.12 33.10 38.63 Post-Dev Treated 4 Reservoir 3 4.433 6.725 ------- 9.213 11.36 19.53 26.90 33.06 Pond Route 5 Combine 2, 4 33.44 43.47 ------- 58.48 70.93 95.59 116.86 138.24 Post-Dev Total Proj. file: 19045 Farrington Trace.gpw Friday, 01 / 31 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 34.35 2 720 85,264 ------ ------ ------ Pre-Development 2 SCS Runoff 29.44 2 720 85,316 ------ ------ ------ Post-Dev Bypass 3 SCS Runoff 11.18 2 716 25,287 ------ ------ ------ Post-Dev Treated 4 Reservoir 4.433 2 724 25,278 3 61.62 9,191 Pond Route 5 Combine 33.44 2 722 110,594 2, 4 ------ ------ Post-Dev Total 19045 Farrington Trace.gpw Return Period: 1 Year Friday, 01 / 31 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Summary Report 4 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 45.51 2 720 113,934 ------ ------ ------ Pre-Development 2 SCS Runoff 37.07 2 720 108,700 ------ ------ ------ Post-Dev Bypass 3 SCS Runoff 13.94 2 716 32,003 ------ ------ ------ Post-Dev Treated 4 Reservoir 6.725 2 722 31,994 3 61.87 10,757 Pond Route 5 Combine 43.47 2 722 140,694 2, 4 ------ ------ Post-Dev Total 19045 Farrington Trace.gpw Return Period: 2 Year Friday, 01 / 31 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Summary Report 5 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 64.21 2 720 163,261 ------ ------ ------ Pre-Development 2 SCS Runoff 49.62 2 720 147,893 ------ ------ ------ Post-Dev Bypass 3 SCS Runoff 18.49 2 716 43,228 ------ ------ ------ Post-Dev Treated 4 Reservoir 9.213 2 722 43,219 3 62.24 13,488 Pond Route 5 Combine 58.48 2 720 191,112 2, 4 ------ ------ Post-Dev Total 19045 Farrington Trace.gpw Return Period: 5 Year Friday, 01 / 31 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Summary Report 6 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 80.25 2 720 206,598 ------ ------ ------ Pre-Development 2 SCS Runoff 60.28 2 720 181,695 ------ ------ ------ Post-Dev Bypass 3 SCS Runoff 22.34 2 716 52,891 ------ ------ ------ Post-Dev Treated 4 Reservoir 11.36 2 722 52,882 3 62.55 15,910 Pond Route 5 Combine 70.93 2 722 234,577 2, 4 ------ ------ Post-Dev Total 19045 Farrington Trace.gpw Return Period: 10 Year Friday, 01 / 31 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Summary Report 7 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 104.32 2 720 272,985 ------ ------ ------ Pre-Development 2 SCS Runoff 76.22 2 720 232,827 ------ ------ ------ Post-Dev Bypass 3 SCS Runoff 28.12 2 716 67,490 ------ ------ ------ Post-Dev Treated 4 Reservoir 19.53 2 722 67,481 3 62.85 18,112 Pond Route 5 Combine 95.59 2 720 300,308 2, 4 ------ ------ Post-Dev Total 19045 Farrington Trace.gpw Return Period: 25 Year Friday, 01 / 31 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Summary Report 8 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 125.07 2 720 331,260 ------ ------ ------ Pre-Development 2 SCS Runoff 89.96 2 720 277,312 ------ ------ ------ Post-Dev Bypass 3 SCS Runoff 33.10 2 716 80,180 ------ ------ ------ Post-Dev Treated 4 Reservoir 26.90 2 720 80,171 3 63.00 19,474 Pond Route 5 Combine 116.86 2 720 357,483 2, 4 ------ ------ Post-Dev Total 19045 Farrington Trace.gpw Return Period: 50 Year Friday, 01 / 31 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Summary Report 9 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 148.23 2 718 396,609 ------ ------ ------ Pre-Development 2 SCS Runoff 105.18 2 720 326,917 ------ ------ ------ Post-Dev Bypass 3 SCS Runoff 38.63 2 716 94,324 ------ ------ ------ Post-Dev Treated 4 Reservoir 33.06 2 720 94,314 3 63.13 20,701 Pond Route 5 Combine 138.24 2 720 421,231 2, 4 ------ ------ Post-Dev Total 19045 Farrington Trace.gpw Return Period: 100 Year Friday, 01 / 31 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydraflow Rainfall Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 01 / 31 / 2020 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs) B D E (N/A) 1 112.0000 18.0000 1.0000 -------- 2 127.0000 18.0000 1.0000 -------- 3 0.0000 0.0000 0.0000 -------- 5 181.0000 21.0000 1.0000 -------- 10 199.0000 22.0000 1.0000 -------- 25 245.0000 23.0000 1.0000 -------- 50 0.0000 0.0000 0.0000 -------- 100 310.0000 25.0000 1.0000 -------- File name: Greenville.IDF Intensity = B / (Tc + D)^E Return Intensity Values (in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.87 4.00 3.39 2.95 2.60 2.33 2.11 1.93 1.78 1.65 1.53 1.44 2 5.52 4.54 3.85 3.34 2.95 2.65 2.40 2.19 2.02 1.87 1.74 1.63 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.96 5.84 5.03 4.41 3.93 3.55 3.23 2.97 2.74 2.55 2.38 2.23 10 7.37 6.22 5.38 4.74 4.23 3.83 3.49 3.21 2.97 2.76 2.58 2.43 25 8.75 7.42 6.45 5.70 5.10 4.62 4.22 3.89 3.60 3.36 3.14 2.95 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100 10.33 8.86 7.75 6.89 6.20 5.64 5.17 4.77 4.43 4.13 3.88 3.65 Tc = time in minutes. Values may exceed 60. Rainfall Precipitation Table (in) Precip. file name: D:\Dropbox (Ark)\03 - Support\Software\Hydraflow\Greenville.pcp Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.11 3.78 0.00 4.89 5.84 7.27 8.51 9.89 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00