Loading...
HomeMy WebLinkAboutWQ0040370_Application (FTSE)_20200616MCDAVID ASSOCIATES, INC. Engineers • Planners • Land Surveyors CORPORATE OFFICE (252) 753-2139 • F= (252) 753-7220 E-math mai@mcdavid-inc.com 3714 N. Main Street • P.O. Drawer 49 Farmvitq NC 27828 June 12, 2020 Sarah Toppen 943 Washington Square Mall Washington, NC 27889 Subject: Flow Tra Contract No. 1 GOLDSBORO OFFICE (919)736-7630• Fax(919) 735-7351 E-mail: maigold@mcdavid-inc.wm 109 E. Walnut Street • P.O. Bar 1776 Ga ,kbom, NC 27533 F 2 cep Form Hedgefield Sanitary Sewer 2016 CDBG Infrastructure Sanitary Sewer Project Greene County Dear Ms. Toppen: Please fmd enclosed two (2) separate Flow Tracking for Sewer Extension Applications (FTSE 10- 18), with two (2) copies for the subject project. These forms correspond to the permit modification request sent to you on May 27, 2020 and as discussed with you over the phone. The first form addresses the flow going into the pump station which was built within the original permit and is owned by Greene County. The second form addresses the flow from the pump station discharging into the Town of Farmville's sewer system. Please let us know is you have any other questions or concerns. Sincerely, McDavid Associates, Inc. goe . M ey,P.E. e Office Enclosures JWM/ssw D805JWM20 I 3:48 PM GREENE-CO-16-CDBG-1-CNl-HEDGEFIELD-FLOW-TRACKING-PERMIT-002.wpd 200612 AV f L` DV, �`.'.. Division of W. te, Resource% Entity Requesting Allocation: Greene State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Project Name for which flow is being requested: 2016 CDBG Infrastructure Sanitary Sewer Project More than one FTSE may be required far a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request 0.00144 g. Total actual and obligated flows to the facility h. Percent of permitted flow used II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station Firm (Name or Permit Capacity, Number) No. MGD Hedgefield Pumy Station WQ0040370 0.3888 (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Obligated, Daily Approx. Not Yet Total Current Flow** Current Tributary Flow Plus (Firm / pf), Avg. Daily Daily Flow, Obligated Available MGD Flow, MGD MGD Flow Capacity*** 0.0911 0.00792 0 0.00792 0.0832 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page 1 of 6 FTSE 10-18 .. r III. Certification Statement: I David Jones certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacoy to transport and treat the proposed new wastewater. Signing Title of Signing Official "?-" 4e) Date Page 2 of 6 FTSE 10-18 State of North Carolina Department of Environmental Quality Division of Water Resources ocvision of .+:A.«-_ 2esourc,-� Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Greene County Project Name for which flow is being requested: 2016 CDBG Infrastructure Sanitary Sewer Projec `- More than one FTSE maybe required for a single project if the owner of the WWTP is not respo lble forte! pump stations along the route of the proposed wastewater flow. �9 �%ii �fi 11A s i I. Complete this section only if you are the owner of the wastewater treatment plant. ° o a. WWTP Facility Name: Farmville WWTP 9°rod b. WWTP Facility Permit #: NC0029572 A11 flows are in MGD c. WWTP facility's permitted flow 3.5 d. Estimated obligated flow not yet tributary to the WWTP 0.029 e. WWTP facility's actual avg. flow 0.9679 (2019) f. Total flow for this specific request 0.00144 g. Total actual and obligated flows to the facility 0.99834 h. Percent of permitted flow used 28.5 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page 1 of 6 FTSE 10-18 4 III. Certification Statement: I Brian Shackelford certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Title of Signing 1r,e e'/ar 12_)o Date Page 2 of 6 FTSE 10-18 r on MCDAVID ASSOCIATES, INC. Engineers • Planners • Land Surveyors CORPORATE OFFICE (252)753-2139• Fax(252) 753-7220 E-mail: maiPmcdavld-inccom 3714 N. Main Street • P.O. Drawer 49 Farmvine, NC 27828 NC Department of Environmental Quality Water Quality Permitting-PERCS Unit 512 N. Salisbury Street, Suite 925 Raleigh, NC 27604 Dear Sir or Madam: GOLDSBORO OFFICE (919) 736-7630 • I =(919) 735-7351 E-mail: numpId@mcdavld-inc.com 109 E. Walnut Stint • P.O. But 1776 Goldsboro, NC 27533 May 27, 2020 RECEIVED MAY 2 8 2020 NCDEQ/DWR/NPDES Subject: Permit Modification Request Contract No. I - Hedgefield Sanitary Sewer 2016 CDBG Infrastructure Sanitary Sewer Project Greene County Modification Number: W00040370 We are submitting the following sewer service extension permit modification application for the Greene County 2016 CDBG Infrastructure Sanitary Sewer Project. The purpose of this modification is to extend the gravity sewer along US Highway 258 by 379 feet, with two (2) manholes, to serve four (4) houses, as shown on page 1 OA of the enclosed plans. We are submitting the following in this application: 1. Copy of the existing permit No. W00040370. /2. McDavid Associates, Inc. check # 37862, dated May 27, 2020 in the amount of $480.00, payable to NC Department of Environmental Quality for the application fee. 3. Two (2) copies of the completed Fast Track Sewer System Extension (Form: FTA 04-16) Application. 4. Two (2) sets of plans "Greene County, 2016 CDBG Infrastructure Sanitary Sewer Project, Contract No. I - Hedgefield Sanitary Sewer", dated February 8, 2018, consisting of 15 pages, (MAI Plan File # G-1062 Blue). 5. One compact disc containing plans. 6. Two (2) color copies of a USGS Topographic Map and street level map showing the project area. D805JWM20 1 8:17 AM GREENE-CO-16-CDBG-I-HEDGEFIELD-SEWER-EXTENSION-PERMIT-MODIFICATION-REQ-LTR-003.wpd 200527 Please review the documents and issue permit at your earliest convenience. If you have any questions please contact me. Sincerely, McDavid Associates, Inc. Jo ph Farmvllle Office JWM/ssw Enclosures cc: Kyle DeHaven (w/application) D8051WM20 2 ^",-=PM GREENE-CO-16-CDBG-I-HEDGEFIELD-SEWER-EXTENSION-PERMIT-MODIFICATION-REQ-LTR-003.wpd 200526 State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and Good engineerine Practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NC CD Projects not eligible for review via the fast track process (must be submitted for full technical review): C ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1 C .0100; ➢ Projects that do not meet any part of the minimum design criteria (MDC) document; MAY 2 82020 ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex gnft&EQ/U ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); WR�NPpEs ➢ Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter (Required for All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): ® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): g Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 1 of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ❑ Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67 a . ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ® Submit the most recently issued existing permit. ® Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Barba, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pander (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Suite 300 Alamance, Allegheny, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Water Quality Section Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336)776-9800 INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: moog 03 (toCb All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Greene County (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ® State/County ❑ Municipal ❑ Other 3. Signature authority's name: Bennie Heath per 15A NCAC 02T .0106(b) Title: Chairman, Board of Commissioners RECEIVE® 4. Applicant's mailing address: 229 Kingold Boulevard, Suite D City: Snow Hill State: NC Zip: 28580- MAY 2 8 2o2o 5. Applicant's contact information: A I Phone number: 252 V 747-3446 Email Address: byle.dehaven@ereenecountync.eov IYCCEQ�DWR/A'p® II. PROJECT INFORMATION: rl ' ES 1. Project name: 2016 CDBG Infrastructure Sanitary Sewer Project 2. Application/Project status: ❑ Proposed (New Permit) ® Existing PermivProject If a modification, provide the existing permit number: W00040370 and issued date: October 17, 2018 If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Greene 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.5576' Longitude:-77.6033' 5. Parcel ID (if applicable): (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Joseph W. McKemev License Number: 028431 Firm: McDavid Associates, Inc. Mailing address: PO Drawer 49 City: Farmville State: NC Zip: 27828-0049 Phone number: 252 753-2139 Email Address: iwm2(a)mcdavid-inc.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Farmville WTTP Permit Number: NCO029572 Owner Name: Town of Farmville V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W00040370 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): Greene County FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) L►,Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(fl) Daily Design Flow •,b No. of Units Flow Residential 360 gal/day 4 1440 GPD gaV GPD gal/ GPD gal/ GPD gaV GPD gal/ GPD Total 1440 GPD a See 15A NCAC 02T .0114(b). (d). (e)(I) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 1440 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VIL GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 379 PVC, SDR 26 ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): _ gallons per minute at _ feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - I SA NCAC 02T .0305(hx1)(B); ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(hx l)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(t) & (a) ➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: ® Yes [—]No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains(horizontal) 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class 1 or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming Is 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weboace ➢ If noncompliance with 02T.0305(f) or (e). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional perinits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Altemative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supportini? documents. 2. Professional Engineer's Certification: I, Joseph W. McKemey. P.E. attest that this application for (Professional Engineer's name from Application Item 111.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. , I , ,f North Carolina Professional Engineer's seal, signature, and date: �N 20 oFEss(o-, 1 : Al SEAL �i✓_4V 3. Applicant's Certification per 15A NCAC 02T .0106(b): 1, Bennie Heath, Chairman. Board of Commissioners attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature Date: 5 1 O " aLoao FORM: FTA 04-16 Page 5 of 5 t State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Greene County Project Name for which flow is being requested: 2016 CDBG Infrastructure Sanitary Sewer Project More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Farmville WWTP b. WWTP Facility Permit #: NC0029572 All flows are in MGD c. WWTP facility's permitted flow 3.5 d. Estimated obligated flow not yet tributary to the WWTP 0.029 e. WWTP facility's actual avg. flow 0.9679 (2019) f. Total flow for this specific request 0.00144 g. Total actual and obligated flows to the facility 0.99834 h. Percent of permitted flow used 28.5 H. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pt), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page 1 of 6 FTSE 10-18 M. Certification Statement: I Brian Shackelford certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing of Signing b-12 -,ZO FihL r Page 2 of 6 FTSE 10-18 Average Yearly Flow for: Jan.2019 Feb.2019 M a r.2019 Apr.2019 May2019 Jun2019 J u 12019 Aug2019 Sept2019 Oct2019 Nov2019 Dec2019 Farmville WWTP, NCO029572 Permitted Flow: 1.6712903 1.7871071 1.3784194 1.2413 0.6035807 0.8539333 0.571129 0.4869355 0.8942667 0.5714194 0.7308333 0.8261936 0.968034025 Avg. Flow 2019 % of Permitted Flow: 3.5 0.27658115 (<80%/90% 0K) 0 ° e�rra1ecrArea / +�Y 4° - OLL tl!- 5 [N®/03GO e . N ,y E 95� e,o��°--�— 038 r ro£ o - CTgy�OR RD - \ R\\ I D va u BROOK `1= VG I! 20181017 Sewer Extension Permit 1-16-0322 ROY COOPER MICHAEL S. REGAN Serrelary LINDA CULPEPPER MAtHm Ormr Bennie Heath, Chairman Greene County Board of Commissioners 229 Kingold Boulevard, Suite D Snow Hill, NC 28580 Subject: Permit No. WQ0040370 Dear Mr. Heath: NORTH CAROLINA Environmental Quality October 17, 2018 Greene County 2016 CDBG Infrastructure Sanitary Sewer Project Wastewater Collection System Extension Greene County RECEIVED MAY 2 8 2020 IVCDEQ/DWR/NPDES In accordance with your application received on October 12 2018, with additional information received October 15, 2018, we are forwarding herewith Permit No. WQ0040370, dated October 17, 2018, to Greene County for the construction of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of Greene County to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 1505 of North Carolina General State of North Carolina I Emironmenlal Quality I Water Resources —Water Quality Regional Operations - Washington Regional Of6a 943 Washington square Mail, Washington, NC 27889 252-946-6481 Greene County 2016 CDBG Infrastructure Sanitary Sewer Project WQ0040370 October 17, 2018 Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. if you need additional information concerning this matter, please contact Allen Clark at (252)948-3918 or via e-mail at allen.clarkAncdenuov. Sincerely el z V for Linda Culpepper Interim Director, Division of Water Resources By Robert Tankard Assistant Regional Supervisor Water Quality Regional Operations Section Washington Regional Office cc: Joseph W. McKemey, PE (electronic copy) Jeff Stancil, Town of Farmville WWTP (electronic copy) Washington Regional Office Files Water Resources Central Files PERCS (electronic copy) Page 2 of 8 STATE OF NORTH CAROUNA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Greene County for the construction and operation of approximately 3,319 linear feet of 8-inch diameter PVC gravity sewer, approximately 282 linear feet of 8-inch diameter Class 51 DIP gravity sewer; approximately 57 linear feet of 8-inch diameter Class 53 DIP gravity sewer; approximately 25 linear feet of 10-1ch diameter Class 51 DIP gravity sewer; a 120-gallon per minute pump station (Hedgefield PS) with duplex pumps, on - site audible and visual high water alarms, telemetry, and a permanent generator with automatic transfer switch; as well as approximately 144 linear feet of 4-inch PVC force main and approximately 160 linear feet of 4-inch Class 51 DIP force main to serve as part of the Greene County 2016 CDBG Infrastructure Sanitary Sewer Project, and the discharge of 9,720 gallons per day (27 residential 3-bedroom homes @ 360 GPD/home) of domestic wastewater Into the Town of Farmville Wastewater Treatment Facility, pursuant to the permit request received October 12, 2018, with additional information received October 15, 2018, and in conformity with SSA NCAC 271"; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. 21_t;:f4_ for Linda Culpepper Interim Director, Division of Water Resources By Authority of the Environmental Management Commission Permit Number: WQ0040370 Permit Issued: October 17, 2018 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Greene County Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Town of Farmville Wastewater Treatment Facility in accordance with Permit Number NC0029572. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. 1. SPECIAL CONDITIONS 1. This permit shall become voidable unless the agreement between the Greene County and the Town of Farmville W WTP for the collection and final treatment of wastewater is in full forte and effect. [15A NCAC 02T.0304(h)] 2. No flow in excess of the quantity permitted herein, 9,720 GIRD, shall be made tributary to the subject sewer system until an application for permit modification for an Increase in flow has been submitted to and approved by the Division. 115A NCAC 02T.0304(b)) 3. The abandonment of any existing wastewater facilities including septic systems being replaced by new sewer infrastructure shall be done in accordance with the applicable agency having compliance oversight on such facilities. [15A NCAC 02T.0105(c)(6)] [IlS£37_lif7JTrZZSTLf_1 f i1TL1T1 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.5143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein: [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [35A NCAC 02T .0110] Page 4 of 9 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be Inspected at least once per every six months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevert grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. J. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. Page S of 8 S. The Permittee shall report by telephone to a water resources staff member at the Washington Regional Office, telephone number (252) 946-6481, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733.3300, Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part ii of Form CS-S5O (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.SC(al)) 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)) Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush law points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or Page 6 of 8 pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation.115A NCAC 02T .0116) 8. Gravity sewers installed greaterthan ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. if there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evidentprior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116) 10, Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12,1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, In accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T 0108(b-c)j 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, Including those as may be required by this Division, such as the construction of additional or replacement facilities. 115A NCAC 02T ,0110; 15A NCAC 02T .0108(1b)) 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, orordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)) Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Greene County PERMIT #: WQ0040370 PROJECT: 2016 CDBG Infrastructure Sanitary Sewer ISSUE DATE: October 17. 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documentsthe Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION , as a duly registered Professional En Ineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly,! full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR— Water Quality Regional Operations Section 943 Washington Square Mall, Washington; NC 27889 Washington Regional Office Phone: (252) 946-6481 FAX: (252)-975-3716 20181017 Sewer Extension Permit 1-16-0322 ROY COOPER Gn.nn" MICHAEL S. REGAN srereraerr LINDA CULPEPPER INIH,n Gvn 11 Bennie Heath, Chairman Greene County Board of Commissioners 229 Kingold Boulevard, Suite D Snow Hill, NC 28580 Subject: Permit No. WQ0040370 Dear Mr. Heath: NORTH CAROLINA Environmental Quality October 17. 2018 Greene County 2016 CDBG Infrastructure Sanitary Sewer Project Wastewater Collection System Extension Greene County RECEIVED MAY 2 8 2020 NCDEC/DWR/NPDES In accordance with your application received on October 12 2018, with additional information received October 15, 2018, we are forwarding herewith Permit No. WQ0040370, dated October 17, 2018, to Greene County for the construction of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 111: This permit shall not be automatically transferable; a request must be made and approved. Condition IIA: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of Greene County to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Stalc or North Carolina I Environmental Qualify I Water Resources —Water Quality Regional Opentions -Washington Regional Office 943 Washington Squwc Mail, Washington, NC 2'889 252-946-6481 Greene County 2016 CDBG Infrastructure Sanitary Sewer Project WQOD40370 October 17, 2018 Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Allen Clark at (252)948-3918 or via e-mail at allen.clarkOncdenr.aov. Sincerely for Linda Culpepper Interim Director, Division of Water Resources By Robert Tankard Assistant Regional Supervisor Water Quality Regional Operations Section Washington Regional Office cc; Joseph W, McKemey, PE (electronic copy) Jeff Stancil, Town of Farmville W WTP (electronic copy) Washington Regional Office Files Water Resources Central Files PERCS (electronic copy) Page 2 of 8 STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT in accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Greene County for the construction and operation of approximately 3,319 linear feet of 8-inch diameter PVC gravity sewer; approximately 282 linear feet of 8-inch diameter Class 51 DIP gravity sewer; approximately 57 linear feet of 8-inch diameter Class 53 DIP gravity sewer; approximately 25 linear feet of 10-ich diameter Class 51 DIP gravity sewer; a 120—gallon per minute pump station (Hedgefieid PS) with duplex pumps, on - site audible and visual high water alarms, telemetry, and a permanent generator with automatic transfer switch; as well as approximately 144 linear feet of 4-inch PVC force main and approximately 160 linear feet of 4-inch Class 51 DIP force main to serve as part of the Greene County 2016 CDBG Infrastructure Sanitary Sewer Project, and the discharge of 9,720 gallons per day (27 residential 3-bedroom homes @ 360 GPD/home) of domestic wastewater into the Town of Farmville Wastewater Treatment Facility, pursuant to the permit request received October 12, 2018, with additional information received October 15, 2018, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. -2t,t;�5q for Linda Culpepper Interim Director, Division of Water Resources By Authority of the Environmental Management Commission Permit Number: WQ0040370 Permit Issued: October 17, 2018 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Greene County Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Town of Farmville Wastewater Treatment Facility in accordance with Permit Number NC0029572. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I. SPECIAL CONDITIONS 1. This permit shall became voidable unless the agreement between the Greene County and the Town of Farmville W WTP for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 02T.0304(h)) 2. No flow in excess of the quantity permitted herein, 9,720 GIRD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [1SA NCAC 02T.0304(b)) 3. The abandonment of any existing wastewater facilities including septic systems being replaced by new sewer infrastructure shall be done in accordance with the applicable agency having compliance oversight on such facilities. [15A NCAC 02T.0105(c)(6)] IIw7kVPll:L•Ir1401N171111rG `N 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. (ISA NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T, the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 20DO as applicable; and other supporting materials unless specifically mentioned herein: [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] Page 4 of 8 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403, If an individual permit is not required, the following performance criteria shall be met: (15A NCAC 02T .0108(b)): a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land orsurface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 28 .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.SC. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. I. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. Page 5 of 8 S. The Permittee shall report by telephone to a water resources staff member at the Washington Regional Office, telephone number (252) 946-6481, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spillover 1,000 gallons; or c- Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part It of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.SC(al)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)) Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification Is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. if the permit is Issued to a private entity with an Operational Agreement, then a copy of the Articles of incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension, Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or Page 6 of 8 pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on Its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. 115A NCAC 02T .0116) B. Gravity sewers installed greaterthan ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ iSA NCAC 02T.0105(n)) 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116) 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12,1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. (15A NCAC 02T .0104;15A NCAC 02T .0108(b-c)) 11. In the event that the wastewater collection facilities fail to perform satisfactorily, Including the creation of nuisance conditions, the Permittee shall take immediate corrective action, Including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)) 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.5.143-215.1(b)] Page 7 of 8 r PERMITTEE: Greene County PERMIT#: WQ0040370 PROJECT: 2016 CDBG Infrastructure Sanitary Sewer ISSUE DATE: October 17, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERM ITTEE'S 10ERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION 1, . as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (u periodically, Q weekly, LJ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources (Division) Gravity Sewer Minimum Design Criteria adopted February 12,1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC OWR— Water Quality Regional Operations Section 943 Washington Square Mail, Washington, NC 27889 Washington Regional Office Phone: (252) 946.6481 FAX: (252y975-3716 State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02�T..030,3` Projects not eligible for review via the fast track process (must be submitted for full technical review): RECEIVED ED ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C .0100; ➢ Projects that do not meet any part of the minimum design criteria (MDC) document; MAY 2 8 2020 ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mainsNCDEQ/D WR/NPD ➢ Vacuum sewer systems. ES General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents S Required unless otherwise noted B. Cover Letter (Required for All Application Packages): S List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): S Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): S Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. S The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. S The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. S The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 1 of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ❑ Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67(a). ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x I 1-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ® Submit the most recently issued existing permit. ® Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per I SA NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Propertv Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910)486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704)663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bards, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910)350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Suite 300 Alamance, Allegheny, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Water Quality Section Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336)776-9800 INSTRUCTIONS FOR FORM: ETA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 1 5A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Greene County (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ® State/County ❑ Municipal ❑ Other 3. Signature authority's name: Bennie Heath per 15A NCAC 02T .0106(b) RECEIVED Title: Chairman. Board of Commissioners 4. Applicant's mailing address: 229 Kingold Boulevard, Suite D MAY 2 8 City: Snow Hill State: NC Zip: 28580- 2�20 5. Applicant's contact information: NCDEQ/D Phone number: 252 747-3446 Email Address: kyle.dehaven(a��/�/ereenecounWc.gov R/NPDES II. PROJECT INFORMATION: 1. Project name: 2016 CDBG Infrastructure Sanitary Sewer Project 2. Application/Project status: ❑ Proposed (New Permit) ® Existing PermivProject If a modification, provide the existing permit number: W00040370 and issued date: October 17, 2018 If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Greene 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.5576' Longitude:-77.6033' 5. Parcel ID (if applicable): (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Joseph W. McKemey License Number: 028431 Firm: McDavid Associates, Inc. Mailing address: PO Drawer 49 City: Farmville State: NC Zip: 27828-0049 Phone number: (252) 753-2139 Email Address: 1wm2C&mcdavid-inc.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Farmville WTTP Permit Number: NCO029572 Owner Name: Town of Farmville V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W00040370 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS_ Owner Name(s): Greene County FORM: FTA 04-16 Pagel of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes [-]No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ®No ➢ If yes, provide a coov of flow reduction nooroval letter 7. Summarize wastewater generated by project: Establishment Type (see 021.0114(D) Daily Design Flow a" No. of Units Flow Residential 360 gal/day 4 1440 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 1440 GPD a See 15A NCAC 02T 0114(b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 1440 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 379 PVC, SDR26 ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): _ gallons per minute at _ feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(fl & (g) D 15A mr A MT M05(4) rnntains minimum senarations that shall be provided for sewer systems: N Yes ❑ No ' ----------------- Setback Parameter' Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains(horizontal) 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines(horizontal - reclaimed over sewer 2 feet "Any private or public water supply source, including any wells, WS-1 waters of Class I or Class 11 impounded reservoirs used as a source of drinking water 100 feet "Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet *"Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Anv buildinR foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drain e systems and interceptor drains 5 feet Any wimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(fl cannot he achieved. ➢ "'Stream classifications can he identified using the Division's NC Surface Water Classifications weboage ➢ If noncompliance with 02T.0305(fl or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) N Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? N Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes N No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? N Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes N No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Altemative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, Joseph W. McKemev P E __attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. n . /, _ _ North Carolina Professional Engineer's seal, signature, and date: O�`'SS•�� :a SEAL 9�: 2�43r1 "IIGfN/Er : CAM �H 3. Applicant's Certification per 15A NCAC 02T .0106(b): 1, Bennie Heath, Chairman. Board of Commissioners attest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature:9su�E P Date: 5--ta 2)QA:� FORM: FTA 04-16 Page 5 of 5 0 Oy d'O),�b1 - o 0 �oyaa RECEI « p"� f MAY 2 8 2 sA � Id 020 NCDEQ/DW aR- � i! — p3 �ybnB T 4 d a t�l V o cl� d Division of L4ater Resuurccs State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Greene County Project Name for which flow is being requested: 2016 CDBG Infrastructure Sanitary Sewer Project More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewaterJlow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request 0.00144 g. Total actual and obligated flows to the facility h. Percent of permitted flow used H. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the W WTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Obligated, Pump Pump Daily Approx. Not Yet Total Current Station Station Firm Flow" Current Tributary Flow Plus (Name or Permit Capacity, ' (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Hedgefield rump station WQ0040370 0.3888 0.0911 0.00792 0 0.00792 0.0832 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page 1 of 6 FTSE 10-18 III. Certification Statement: I David Jones certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Title of Signing Official _12, 20 Date Page 2 of 6 FTSE 10-18 lA x, fF' �r Division of l4 r.tcI grstm rzf-:, State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Greene County Project Name for which flow is being requested: 2016 CDBG Infrastructure Sanitary Sewer Project More than one FTSE maybe requited for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Fannville WWTP b. WWTP Facility Permit #: NC0029572 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 3.5 0.029 0.9679 (2019) 0.00144 0.99834 28.5 H. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) Design Pump Pump Average Approx. Station Station Firm Daily Flow** Current (Name or Permit Capacity, * (Firm / pt), Avg. Daily Number) No. MGD MGD Flow, MGD (C) (D)=(BBC) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a pealing factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page I of 6 FTSE 10-18 ,00 / III. Certification Statement: I Brian Shackelford certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and H plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. of Signing Page 2 of 6 FTSE 10-18