Loading...
HomeMy WebLinkAbout100037_Plan of Action_20200622PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 6/22/2020 1. Structure Name/Identifier (ID): I Carolina Bay Nursery (10-37) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 20.0 inches 28.0 inches 8.0 inches 67,326 ft2 335,732 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 350,720 ft3 h. current herd # 6,400 certified herd # 6,400 actual waste produced = current herd # x line g = 350,720 ft' certified herd # i. volume of wash water according to structural design 30976 ft3 j. excess rainfall over evaporation according to design 62,040 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 553,191 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 1/9/2 1 2.03 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 1804.5 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 C Bay Nursery (10-37) PoA30day (6-22-20) Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Carolina Bay Nursery (10-37) line m = 1804.5 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 1804.5 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 3075 1 Bermuda Pasture 3.61 125.00 451.3 3/1 - 9/31 3075 2 Bermuda Pasture 2.91 150.00 436.5 3/1 - 9/31 3075 3 Bermuda Pasture 4.49 130.00 583.7 3/1 - 9/31 3075 4 Bermuda Pasture 5.79 150.00 868.5 3/1 - 9/31 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2340.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1804.5 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2340.0 lb. PAN y. Overall PAN balance (w - x) = -535 lb. PAN Summary C Bay Nursery (10-37) PoA30day (6-22-20) Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. This is a updated PoA. Still in red. Waste will be applied as soon as weather permits. Summary C Bay Nursery (10-37) PoA30day (6-22-20) Page 2 of 2