HomeMy WebLinkAbout240015_Plan of Action_20200618PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 24-15
Facility Name: Owen Farm
Certified Operator Name: Sidney W. Taylor
County: Columbus
Operator Number: 18446
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 1
Spillway(Y or N): N
Level(inches): 17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 6/22/20 Weather Permitting.
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Prestage Farms Inc. Phone:
���Faacility Owner/Manager (print)
•ZGf / /1� Date:
Facility Owner/Manager (signature)
910-592-5771
6/18/2020
1911117-,\dQ:7e1§TA119 71110MOT11
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 10wen Farm
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
top of dike surface area according to design
d. (area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft'
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
17.0 inches
19.0 inches
2.0 inches
130680 ftZ
162914 gallons
180 days
g. volume of waste produced according to structural design 96926 ft3
h. current herd # 2940 certified herd # 2940
actual waste produced = current herd # x line g = 96926 ft'
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 76230 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 215868 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6/1/2020 0.99
m. ((lines e + k)/1000) x line I = 375 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
1
n.lines 1+2+3+4+5+6=
line m =
375.0 lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
375.0 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DIMING THISan nAY PFRInn_
o. tract #
p. field #
q. Crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
7669
R1
Bermuda Hay
3.50
254.00
889.0
MAR-SEP
7669
R2
Bermuda Hay
1.90
232.00
440.8
MAR-SEP
7669
R3
Bermuda Hay
4.10
249.00
1020.9
MAR-SEP
v. I Dial VAN avananle Tor an news (sum OT column t)
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line In from section II) _
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) =
2350.7 lb. PAN
375.0 lb. PAN
2350.7 lb. PAN
-1976 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Self reported to DWR on 6/17/20.
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 24-9 County: Columbus
Facility Name: P-43BC
Certified operator Name: Timothy R. Jones Operator Number: 17846
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways, and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
43B 43C
14 14
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
`Attach a complete schedule with corresponding animal units and dates fro depopulation
`if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 6122/20 Weather permitting.
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Prestage Farmslnc. Phone:
Facility Owner/Manager (print)
C 4 -F✓(/ tl Date:
Facility Owner/Manager (signature)
910-592-5771
6/18/2020
Bill UeVANIMAriTR6 iT:
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 143B
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
top of dike surface area according to design
d. (area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft'
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
14.0 inches
19.0 inches
5.0 inches
167676 ftZ
522590 gallons
186 days
g. volume of waste produced according to structural design 211997 ft3
h. current herd # F 2000 certified herd #F 2000
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6/1/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
211997 ft'
Oft3
100800 ft3
389954 gallons
0.84
767 lbs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (I D): I P-43C
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
14.0 inches
19.0 inches
5.0 inches
323832 ft2
1009276 gallons
180 days
g. volume of waste produced according to structural design 422966.1 ft3
h. current herd # 4000 certified herd # 4000
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6/1/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
422966 ft'
Oft3
195771 ft3
771359 gallons
0.83 Ibs/1000 gal.
1477.9 Ibs. PAN
It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: P-43B
line in =
766.5 lb PAN
2.
Structure ID: P-43C
line m =
1477.9 lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line in =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 2244.5lbPAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
662
H54
Soybeans
4.42
128.00
565.8
APR-SEP15
662
H55
Soybeans
3.01
112.00
337.1
APR-SEP15
662
H56
Soybeans
3.53
112.00
395.4
APR-SEP15
92419
10A
Soybeans
4.16
136.00
565.8
APR-SEP15
92419
11A
Soybeans
6.21
136.00
844.6
APR-SEP15
v. I Dial t AN avallaDle Tor all Tlelas (sum oT column t)
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) _
x. Crop's remaining PAN balance (line v from section 111) _
y. Overall PAN balance (w - x) =
Z/Ut$.b ID. PAN
2244.5 lb. PAN
2708.6 lb. PAN
464,1 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Self reported to DWR on 6/17/20.