HomeMy WebLinkAbout240015_Plan of Action_20200618PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 24-15 Facility Name: Owen Farm Certified Operator Name: Sidney W. Taylor County: Columbus Operator Number: 18446 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): N Level(inches): 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 6/22/20 Weather Permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Prestage Farms Inc. Phone: ���Faacility Owner/Manager (print) •ZGf / /1� Date: Facility Owner/Manager (signature) 910-592-5771 6/18/2020 1911117-,\dQ:7e1§TA119 71110MOT11 I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 10wen Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ top of dike surface area according to design d. (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 17.0 inches 19.0 inches 2.0 inches 130680 ftZ 162914 gallons 180 days g. volume of waste produced according to structural design 96926 ft3 h. current herd # 2940 certified herd # 2940 actual waste produced = current herd # x line g = 96926 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 76230 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 215868 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/1/2020 0.99 m. ((lines e + k)/1000) x line I = 375 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: 1 n.lines 1+2+3+4+5+6= line m = 375.0 lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN 375.0 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DIMING THISan nAY PFRInn_ o. tract # p. field # q. Crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 7669 R1 Bermuda Hay 3.50 254.00 889.0 MAR-SEP 7669 R2 Bermuda Hay 1.90 232.00 440.8 MAR-SEP 7669 R3 Bermuda Hay 4.10 249.00 1020.9 MAR-SEP v. I Dial VAN avananle Tor an news (sum OT column t) IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line In from section II) _ x. Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) = 2350.7 lb. PAN 375.0 lb. PAN 2350.7 lb. PAN -1976 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Self reported to DWR on 6/17/20. PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 24-9 County: Columbus Facility Name: P-43BC Certified operator Name: Timothy R. Jones Operator Number: 17846 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 43B 43C 14 14 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding animal units and dates fro depopulation `if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 6122/20 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Prestage Farmslnc. Phone: Facility Owner/Manager (print) C 4 -F✓(/ tl Date: Facility Owner/Manager (signature) 910-592-5771 6/18/2020 Bill UeVANIMAriTR6 iT: I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 143B 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ top of dike surface area according to design d. (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 14.0 inches 19.0 inches 5.0 inches 167676 ftZ 522590 gallons 186 days g. volume of waste produced according to structural design 211997 ft3 h. current herd # F 2000 certified herd #F 2000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/1/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 211997 ft' Oft3 100800 ft3 389954 gallons 0.84 767 lbs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (I D): I P-43C 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 14.0 inches 19.0 inches 5.0 inches 323832 ft2 1009276 gallons 180 days g. volume of waste produced according to structural design 422966.1 ft3 h. current herd # 4000 certified herd # 4000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/1/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 422966 ft' Oft3 195771 ft3 771359 gallons 0.83 Ibs/1000 gal. 1477.9 Ibs. PAN It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: P-43B line in = 766.5 lb PAN 2. Structure ID: P-43C line m = 1477.9 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line in = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 2244.5lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 662 H54 Soybeans 4.42 128.00 565.8 APR-SEP15 662 H55 Soybeans 3.01 112.00 337.1 APR-SEP15 662 H56 Soybeans 3.53 112.00 395.4 APR-SEP15 92419 10A Soybeans 4.16 136.00 565.8 APR-SEP15 92419 11A Soybeans 6.21 136.00 844.6 APR-SEP15 v. I Dial t AN avallaDle Tor all Tlelas (sum oT column t) IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) _ x. Crop's remaining PAN balance (line v from section 111) _ y. Overall PAN balance (w - x) = Z/Ut$.b ID. PAN 2244.5 lb. PAN 2708.6 lb. PAN 464,1 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Self reported to DWR on 6/17/20.