HomeMy WebLinkAbout240001_Plan of Action_20200617PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 24-1
County: Columbus
Facility Name: Farm #17 (3417)
Certified Operator Name: Chris Smith Operator Number:
17907
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
34171 34173
N N
20 19
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates for depopulation
"if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Murphy -Brown, LLC Phone: 910-293-3434
Facility Owner/Manager (print)
142 ze2,�Z7&& Date: 6/17/2020
ne i F e)
IL TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 34171 line m =
lb PAN
2. Structure ID: 34173 line m = 1464.1
lb PAN
3. Structure ID: line m =
lb PAN
4. Structure ID: line m =
lb PAN
5. Structure ID: line m =
lb PAN
6. Structure ID: line m =
lb PAN
n.lines 1+2+3+4+5+6= 1464.1lbPAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract # p. field # q. crop r. acres s. remaining IRR- t. TOTAL PAN I U. application window'
2 PAN balance BALANCE FOR
(lb/acre) FIELD (Ibs.)
column r x s
T 767 1 Bermuda 5.46 225.07 1228.9 March - Sept
T 767 2 Bermuda 5.38 212.51 1143.3 March - Sept
tStatP n..I lrn-nt rrnn onrlinrr nnr 1; 4;r ., A F a _
--. -- -1 _. _r _.._...� -,-11,,,�,,, �,"- - i KWAL i,1UN aNNnUaLlvll utCyinning gate Tor available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2372.2 Ib. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1464.1 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (tine v from section III) = 2372.2 Ib. PAN
y. Overall PAN balance (w - x) _ -908 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based
on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the
PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is availab
for pumping if needed.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
!. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 134173
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c112 x line d x 7.48 gallonslft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
19.0 inches
1-9-.-81 inches
0.8 inches
220000 ft2
109707 gallons
18D days
g. volume of waste produced according to structural design 1 303305 ft3
h. current herd # 9200 certified herd # 9200
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
1. current waste analysis dated 1 6/8/2020
m. ((lines e + k)11000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
303305 fC
fe
128333 ft3
538109 gallons
2.26 1 Ibs11000 gal.
1464.1 lbs. PAN
PoA (30 Day) 2/21 /00