HomeMy WebLinkAboutNCG170126_Inspection Report_20200623ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
Valdese Weavers Inc.
Attention: Eddie Atkinson
705 Lovelady Road
Valdese, North Carolina 28690
NORTH CAROLINA
Environmental Quality
June 23, 2020
Subject: Compliance Evaluation Inspection
Permit: NCG170000
Certificate of Coverage: NCG170126
Burke County, North Carolina
Dear Mr. Atkinson:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on June 10, 2020.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Sincer
Isaiah Reed, CP Q, CEPSCI, S4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 [ Swannanoa, North Carolina 28778
o•pnmeot ofOnWronm=^aim.nb 828.296.4500
Compliance Inspection Report
Permit: NCG170126 Effective: 10/02/14 Expiration: 07/31/19 Owner: Valdese Weavers Inc
SOC: Effective: Expiration: Facility: Valdese Weavers, Inc.
County: Burke 705 Lovelady Rd
Region: Asheville
Valdese NC 28690
Contact Person: Eddie Atkinson Title: Phone: 828-874-2181
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 06/10/2020
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Certification:
Phone:
Entry Time 02:15PM Exit Time: 03:30PM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Textile Mill Products Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG170126 Owner- Facility:Valdese Weavers Inc
Inspection Date: 06/10/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On June 10, 2020 this facility was inspected for compliance. I met with Phill Eller and Bill Jacumin on site. No major issues
were noted during the inspection. However, a slope failure was observed at the tree line at the rear of the facility. To prevent
sediment impacts to local streams, this area should be filled, seeded and stabilized.
A records review of the Certificate of Coverage associated with this facility revealed that coverage under the NCG170000
expired on July 31, 2020. The permittee is directed to immediately contact the Department of Environmental Quality and
re-establish coverage under the NCG170000 General Permit. If coverage is not obtained by July 31, 2019, further action will
be taken.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG170126 Owner- Facility:Valdese Weavers Inc
Inspection Date: 06/10/2020 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
N ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
0 ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0 ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0 ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0 ❑ ❑ ❑
Comment
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ N ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3