HomeMy WebLinkAboutNCC202121_NOI Application_20200623Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 5/18/2020 5:40:47 PM (NCG01 NOI Submission)
Approve by Morman, Alaina 5/20/2020 11:35:37 AM (Review- Construction NOI 25782)
• Clark, Paul reassigned the task to Morman, Alaina 5/19/2020 12:30 PM
* Alaina, hi sorry not reassigning until now, was doing other stuff
• The task was assigned to Clark, Paul by round robin distribution 5/18/2020 5:41 PM
• The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: May 20, 2020 5:00 PM.
The priority is: High 5/18/2020 5:41 PM
Submit by Selkane, Aziza 6/23/2020 8:47:59 AM (Payment Verification for NCC202121)
* Terrell Scott Martin
• Selkane, Aziza assigned the task to Selkane, Aziza 6/23/2020 8:47 AM
• The task was assigned to DEMLR NCG01 Payment Team. The due date is: July 1, 2020 5:00 PM. The
priority is: High 5/20/2020 11:36 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting r No
an NOI that was r Yes
rejected before?
Previous Rejected 25636
NOI No.
Prior Reviewer Alaina Morman
Name
1a. Project Name * Duke Energy - Allen Starter Landfill # 1 Tree Clearing
1 b. Specific Lot This field may be used to list specffc lot numbers.
Numbers
2. County* Gaston
3. Highway or Street 253 Plant Allen Rd
Address * Street narre only is acceptable if no address number assigned yet
4. City or Township* Belmont
5. State * NC
6. Zip Code * 28012
7. Latitude * Enter the latitude in decimal degrees
35.1860
8. Longitude* Enter the longitude in decinal degrees (M. ST be negative)
-81.0180
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 05/18/2020
Estimated Construction Project Start Date
10. Date to End* 06/30/2020
Estimated Construction Project End Cute
11. SIC (Primary)* Industrial (1541)
Standard Industrial Classification for Developrrent
12. Acres to be 29.21
disturbed* (including off -site borrow and waste areas)
13. Total site area 29.21
(acres) *
14. Post- 4.00
construction (Estirrated)
impervious area
(acres) *
NCC Project NCC-GASTO-2020-Duke Energy - Allen Starter Landfill # 1 Tree
Tracking ID Clearing
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Catawba River
Wate rbody* N larre of waterbody into which stornwater runoff will discharge
15b. Waterbody 11-(123.5)
Index No.* NCWaterbody Index Number
Stormwater rJ No
discharges will flow r- Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fternittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Legally Pesponsible Entity
Name * Duke Energy Carolinas, LLC.
IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
2. First Name * Scott
If Corporation, enter Faegistered Agent First %rre
3. Last Name* Martin
IF Corporation, enter F;bgistered Agent Last %ne
3b. Title Project Director
4. Permitee E-mail scott.martin@duke-energy.com
Address*
5. Permittee 704-913-1623
Telephone No.*
6. Permittee Mailing Street Address
Address* 400 South Tryon Street
Address Line 2
Suite 30C
City
State / Frovince / Fbgion
Charlotte
NC
Fbstal / Zip Code
Country
28202
us
Check box if the F Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
400 South Tryon Street
Address Line 2
Suite 30C
City
State / Frovince / Region
Charlotte
NC
Fbstal / Zip Code
Country
28202
us
8. Type of
Non -Government
Ownership
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Elizabeth
Contact - First
Name *
2. Primary Site
Glenn
Contact - Last
Name *
3. Title
Sr Environmental Specialist
4. Site Contact E-
elizabeth.glenn@duke-energy.com
mail Address*
5. Site Contact
980-373-0530
Telephone No.
6. Organization
Name
7. Site Contact
Street Address
Mailing Address*
526 South Church Street
Address Line 2
EC13K
City
Charlotte
Fbstal / Zip Code
28202
8. Consultant Name
(Optional)
First and Last narre
9. Consultant E-mail
This person will be copied on all correspondence.
10. Consultant
Telephone No.
State / Rovince / Region
NC
Country
us
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 05/08/2020
Approved *
2. E&SC Plan Project GASTO-2020-018
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Mooresville (MRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan
Duke Energy -Allen Stater Landfill 1 Tree Clearing
Approval letter or
324.48KB
(Express Plan) Approval w mods.pdf
Grading Permit
Mast be FDFforrrat
6. Site Location Map
Helpful for linear project review
(Optional)
Mast be FCFfornat. Rease do not upload entire set of E&SCplans.
7. Notes (Optional)
Frovide any additional information that night help the reviewer better understand how uploaded docurrents support
the application. Include additional waterbodies for linear projects if necessary.
8. NOI Certification
Allen Starter Landfill #1 NOI.pdf 40.64KB
Form
Wst be RDFfornat
This is an Express
f No
Review Project*
r Yes
E. Certification
North Carolina General Statute 143-215.6E (i) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
[-'r 6/ Wa, fz-
Type Name * Scott Martin
Title Project Director
Organization Legally Plesponsible Entity
Duke Energy Carolinas, LLC
Date * 05/18/2020
F. Tracking and COC Info
NOI Tracking No. 25782
NC Reference No. NCG01-2020-2121
Uses 'count number' variable (incremrented by SP)
Certificate of NCC202121
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 2121
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)