Loading...
HomeMy WebLinkAboutNCC202570_ESC Approval Submitted_20200623HENOERSON COUNTY GOVERNMENT SITE DEVELOPMENT DEPARTMENT Natalie Merry. PE. Telepone(88)69-6553er Soil Erosion and Sedimentation Control Division Tebahone(828164-6521 Telephone {g28j 694-6553 June 17, 2020 LETTER OF APPROVAL WITH STRICT CONDITIONS MVF Half Way Tree LLC ATTN: Tim Manson P.O. Box 6010 Spartanburg, SC 29304 RE: Project Name: Half Way Tree MHP Sewer Extension Acres Approved: 2.80 Project ID: 2020-053 County: Henderson City: None Address: 248 Ironwood Dr River Basin: French Broad River Basin Stream Class: Meninger Creek, C, 6-55-8-1-2-3 (nearby) Submitted By: Tim Thomason PE Date Rcvd by HC: June 3rd, 2020 Plan Type: New Dear MVF Half Way Tree, LLC, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucasL ncdenr.gov or Paul Clark at Paul.clarkLa ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, NC DEQ DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved Soil Erosion & Sedimentation Control plan as well as any approved deviation. 2. The NCG01 permit and the COC, once received. 3. Records of inspections made during the previous 30 days. Site Development Department Soil Erosion and Sedimentation Control Program 240 Second Avenue East Hendersonville, NC 28792 (828) 694-6521 or (828) 694-6553 MVF Half Way Tree LLC ATTN: Tim Manson Project Name: Half Way Tree MHP Sewer Extension Page 2 of 2 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Project Engineer Soil Erosion & Sedimentation Control Office Enclosures: Certificate of Approval NCG01 Fact Sheet ec: Stan Aiken, Regional Engineer, DEQ ARO Rick Brooks, Erosion Control Technician STRICT CONDITIONS • NO WORK IN THE EASEMENT AREA OF ADJOINING PROPERTY OWNER THOMAS L EISENHAUER UNTIL EITHER AN EASEMENT WITH HIS SIGNATURE IS SUBMITTED TO THIS OFFICE, OR A CONDEMNATION OF PROPERTY APPROVAL IS SUBMITTED TO THIS OFFICE. • FOLLOW THE INSPECTION REQUIREMENTS OF NPDES AND SELF INSPECTION AS DESCRIBED ON SHEET C2-01 OF THE APPROVED DRAWING. Site Development Oepartment Soil Erosion and Sedimentation Control Program 240 Second Avenue East Hendersonville, NC 28792 6 (828) 694-6521 or (828) 694-6553