Loading...
HomeMy WebLinkAboutNCG110107_Inspection Report_20200623ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Town of Spindale Attention: Sibyl Brotherton Post Office Box 186 Spindale, North Carolina 28160 NORTH CAROLINA Environmental Quality June 23, 2020 Subject: Compliance Evaluation Inspection Permit: NCG110000 Certificate of Coverage: NCG110107 Spindale, North Carolina Dear Ms. Brotherton: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on June 11, 2020. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer Isaiah Reed, CPS Q, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources _ - Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 o".°: "mm�lm-imeumumiy 828.296.4500 Compliance Inspection Report Permit: NCG110107 Effective: 06/01/18 Expiration: 05/31/23 Owner: Town of Spindale SOC: Effective: Expiration: Facility: Spindale WWTP County: Rutherford Ecology St Region: Asheville Spindale NC 28160 Contact Person: Lance Mundy Title: Phone: 828-286-3407 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/11/2020 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 01:36PM Exit Time: 02:30PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Municipal WWTP> 1MGD, Stormwater Discharge, COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG110107 Owner -Facility: Town of Spindale Inspection Date: 06/11/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary On June 11, 2020 this facility was inspected for compliance. I met with Sibyl Brotherton and Earl Wyss on site. During the inspection, the following items were noted: 1) A Stormwater Pollution Prevention Plan (SWPPP) was not available on site. The permittee is directed to locate/update/create a SWPPP as outlined in the NCG110000 General Permit. 2) Qualitative Monitoring has not been documented at the facility. The permittee is directed to immediately being monitoring efforts in accordance with the NCG110000 General Permit. Please give the above items your immediate attention. This facility will be re -inspected on or after July 29, 2020. If the above items are not corrected, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG110107 Owner -Facility: Town of Spindale Inspection Date: 06/11/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ E ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: See summary for more information. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ E ❑ ❑ Comment: See summary for more information. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment Page 3 of 3