Loading...
HomeMy WebLinkAboutNCG050120_Inspection Report_20200623ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality June 23, 2020 Sonoco Crellin Attention: Mark Hodge, Plant Engineer 323 Pine Street Forest City, North Carolina 28043 Subject: Compliance Evaluation Inspection Permit: NCG050000 Certificate of Coverage: NCGO50120 Rutherford County, North Carolina Dear Mr. Hodge: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on June 11, 2020. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sinc , Isaiah Reed, CPSW , CEPSCI, MS4CE I Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 rva O, perun.mo Nwmnmenryi oumry 828296.4500 Compliance Inspection Report Permit:NCG050120 Effective: 06/01/18 Expiration: 05/31/23 Owner: SonocoCrellin SOC: Effective: Expiration: Facility: Sonoco Crellin County: Rutherford Pine St Region: Asheville Forest City NC 28043 Contact Person: Paul Hunch Title: Phone: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/11/2020 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 09:20AM Exit Time: 10:20AM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG050120 Owner- Facility: Sunoco Crellin Inspection Date: 0611112020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary On June 11, 2020 this facility was inspected for compliance. I met with Mark Hodge, Plant Engineer on site. During the inspection the following items were noted: 1) An updated list of significant spills had not been maintained in the Stormwater Pollution Prevention Plan as outlined in the NCG050000 General Permit. 2) Stormwater training for facility personnel has not been documented in the Stormwater Pollution Prevention plan as outlined in the NCGO50000 General Permit. 3) The Stormwater Pollution Prevention Plan has not been reviewed/updated annually as outlined in the NCG050000 Genera Permit. 4) Facility inspections have not been documented in the Stormwater Pollution Prevention Plan as outlined in the NCGO50000 General Permit. 5) Qualitative monitoring has not been documented and conducted in accordance with the NCGO50000 General Permit. Please give the above items your immediate attention. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG050120 Owner- Facility: Sonoco Crellin Inspection Date: 06/11/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? Yes No NA NE # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? E ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ N ❑ ❑ Comment: See summary for more information. Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Through 2015 Yes No NA NE ❑■❑❑ Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ N ❑ ❑ Comment: Page 3 of 3