HomeMy WebLinkAboutNCG030573_Inspection Report_20200623ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
Meritor Heavy Vehicle Systems, LLC
Attention: Bill Adams
160 Ash Street
Forest City, North Carolina 28043
NORTH CAROLINA
Environmental Quality
June 23, 2020
Subject: Compliance Evaluation Inspection
Permit: NCG030000
Certificate of Coverage: NCG030573
Rutherford County, North Carolina
Dear Mr. Adams:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on June 11, 2020.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Since
Isaiah Reed, _I�SWQ,. CEPSCI, S4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
NOFM LPflOIIfN
ozpvonemaimvimnm.neiauanry 828.296.4500
Permit: NCG030573
SOC:
County: Rutherford
Region: Asheville
Contact Person: Bill Adams
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Compliance Inspection Report
Effective: 11/01/18 Expiration: 05/31/21 Owner: Mentor Heavy Vehicle Systems LLC
Effective: Expiration: Facility: Mentor Heavy Vehicle Systems, LLC
160 Ash St
Inspection Date: 06/11/2020
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Title:
Entry Time 10:40AM
Certification:
Forest City NC 28043
Phone:828-247-0440 Ext.104
Phone:
Exit Time: 12:OOPM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG030573 Owner • Facility: Mentor Heavy Vehicle Systems LLC
Inspection Date: (16/1112020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On June 11, 2020 this facility was inspected for compliance. I met with Mitchell Swanger, Luke Barrett and Bill Adams on
site. During the inspection, it was noted that the facility inspections required by the permit are not sufficiently documented in
the Stormwater Pollution Prevention Plan. The permittee is directed to immediately begin documenting all facility inspection
required by the permit.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG030573 Owner - Facility: Mentor Heavy Vehicle Systems LLC
Inspection Date: 06/11/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map? N ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices'? N ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0
❑ ❑ ❑
# Does the Plan include a BMP summary?
0
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
E
❑ ❑ ❑
# Does the facility provide and document Employee Training?
0
❑ ❑ ❑
# Does the Plan include a list of Responsible Par y(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑
0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑
0 ❑ ❑
Comment: See summary for more information.
Qualitative Monitorina
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually?
0
❑ ❑ ❑
Comment
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment:
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
0
❑ ❑ ❑
# Were all outfalls observed during the inspection?
0
❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑ N ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
E
❑ ❑ ❑
Comment
Page 3 of 3