Loading...
HomeMy WebLinkAboutSW5200602_Supplement-EZ Form_20200622SUPPLEMENT-EZ COVER PAGE FORMS LOADED 1 Project Name Wake Electric 2 Project Area (ac)30 3 Coastal Wetland Area (ac) 4 Surface Water Area (ac)36.5 5 Is this project High or Low Density?High 6 Does this project use an off-site SCM?No 7 Width of vegetated setbacks provided (feet)25 8 Will the vegetated setback remain vegetated?Yes 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback?Yes 10 Is streambank stabilization proposed on this project?No 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 1 17 Rainwater Harvesting (RWH)0 18 Green Roof 0 19 Level Spreader-Filter Strip (LS-FS)0 20 Disconnected Impervious Surface (DIS)0 21 Treatment Swale 0 22 Dry Pond 2 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED 27 Name and Title:Jeff Rice, PE 28 Organization:Stantec 29 Street address:2127 Arysley Town Blvd. Suite 300 30 City, State, Zip:Charlotte, NC 28273 31 Phone number(s):704-329-0900 32 Email:jeff.rice@stantec.com Certification Statement: Designer ______________________________________________ Signature of Designer ______________________________________________ Date I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. PROJECT INFORMATION NUMBER AND TYPE OF SCMs: DESIGNER CERTIFICATION COMPLIANCE WITH 02H .1003(4) Seal 06/10/2020 DRAINAGE AREAS 1 Is this a high density project?Yes 2 If so, number of drainage areas/SCMs 2 3 Is all/part of this project subject to previous rule versions?Yes CLICK TO LOAD FORM Entire Site 1 4 Type of SCM dry ponds / sandfilter dry pond / sandfilter 5 Total BUA in project (sq ft)619253 sf 202015 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft) 7 New BUA outside of subdivided lots (subject to permitting) (sf)183124 sf 114577 sf 8 Offsite - total area (sq ft)285054 sf 9 Offsite BUA (sq ft)54754 sf 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft)14385 sf 7186 sf - Roadway (sq ft)22241 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) 146498 sf 107391 sf 11 New infiltrating permeable pavement on subdivided lots (sq ft) 12 New infiltrating permeable pavement outside of subdivided lots (sq ft) 13 Exisitng BUA that will remain (not subject to permitting) (sq ft)436129 sf 87438 sf 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 16 Percent BUA 47%64% 17 Design storm (inches)1 in 1 in 18 Design volume of SCM (cu ft)47690 cf 10863 cf 19 Calculation method for design volume Simple Method Simple Method 20 Entire Site 1 4 Type of SCM dry ponds / sandfilter dry ponds / sandfilter 5 Total BUA from project (sq ft)619253 sf 202015 sf 6 1995 rules 436129 sf 87438 sf SL 2006-246 2008 rules 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 8 New BUA outside of subdivided lots (subject to permitting) (sf)183124 sf 114577 sf 1995 rules SL 2006-246 2008 rules 2017 rules 183124 sf 114577 sf 9 Offsite - total area (sq ft)285054 sf 1995 rules 285054 sf SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft)54754 sf 1995 rules 54754 sf SL 2006-246 2008 rules DRAINAGE AREA INFORMATION DRAINAGE AREA INFORMATION ADDITIONAL INFORMATION graval yard, concrete pads Please use this space to provide any additional information about the drainage area(s): 2017 rules 11 Design storm (inches)1 in 1 in 1995 rules SL 2006-246 2008 rules 2017 rules 1 in 1 in 12 Breakdown of new BUA: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft)14385 sf 7186 sf - Roadway (sq ft)22241 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) 146498 sf 107391 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement outside of subdivided lots (sq ft) 15 Exisitng BUA that will remain (not subject to permitting) (sq ft)436129 sf 87438 sf 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 47%64% 19 Design volume of SCM (cu ft)47690 cf 10863 cf 20 Calculation method for design volume Simple Method Simple Method 21 Please use this space to provide any additional information about the drainage area(s): graval yard, concrete pads ADDITIONAL INFORMATION DRAINAGE AREAS 1 Is this a high density project?Yes 2 If so, number of drainage areas/SCMs 2 3 Is all/part of this project subject to previous rule versions?Yes CLICK TO LOAD FORM Entire Site 1 4 Type of SCM dry ponds / sandfilter dry pond 5 Total BUA in project (sq ft)619253 sf 187030 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft) 7 New BUA outside of subdivided lots (subject to permitting) (sf)183124 sf 57525 sf 8 Offsite - total area (sq ft)285054 sf 10962 sf 9 Offsite BUA (sq ft)54754 sf 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft)14385 sf 7199 sf - Roadway (sq ft)22241 sf 13686 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) 146498 sf 36640 sf 11 New infiltrating permeable pavement on subdivided lots (sq ft) 12 New infiltrating permeable pavement outside of subdivided lots (sq ft) 13 Exisitng BUA that will remain (not subject to permitting) (sq ft)436129 sf 129505 sf 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 16 Percent BUA 47%77% 17 Design storm (inches)1 in 1 in 18 Design volume of SCM (cu ft)47690 cf 36827 cf 19 Calculation method for design volume Simple Method Simple Method 20 Entire Site 1 4 Type of SCM dry ponds / sandfilter dry pond 5 Total BUA from project (sq ft)619253 sf 187030 sf 6 1995 rules 436129 sf 129505 sf SL 2006-246 2008 rules 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 8 New BUA outside of subdivided lots (subject to permitting) (sf)183124 sf 57525 sf 1995 rules SL 2006-246 2008 rules 2017 rules 183124 sf 57525 sf 9 Offsite - total area (sq ft)285054 sf 10960 sf 1995 rules 285054 sf 10962 sf SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft)54754 sf 1995 rules 54754 sf SL 2006-246 2008 rules DRAINAGE AREA INFORMATION ADDITIONAL INFORMATION Please use this space to provide any additional information about the drainage area(s): graval yard, concrete pads DRAINAGE AREA INFORMATION 2017 rules 11 Design storm (inches)1 in 1 in 1995 rules SL 2006-246 2008 rules 2017 rules 1 in 1 in 12 Breakdown of new BUA: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft)14385 sf 7199 sf - Roadway (sq ft)22241 sf 13686 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) 146498 sf 36640 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement outside of subdivided lots (sq ft) 15 Exisitng BUA that will remain (not subject to permitting) (sq ft)436129 sf 129505 sf 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 47%77% 19 Design volume of SCM (cu ft)47690 cf 36827 cf 20 Calculation method for design volume Simple Method Simple Method 21 Please use this space to provide any additional information about the drainage area(s): graval yard, concrete pads ADDITIONAL INFORMATION SAND FILTER 1 Drainage area number 1 2 Design volume of SCM (cu ft)10836 sf 3 Is the SCM sized to treat the SW from all surfaces at build-out?No 4 Is the SCM located away from contaminated soils?Yes 5 What are the side slopes of the SCM (H:V)?3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10- year storm)?Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume?Yes 9 What is the method for dewatering the SCM for maintenance?Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction?Yes 11 Does the maintenance access comply with General MDC (8)?Yes 12 Does the drainage easement comply with General MDC (9)?Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)?Yes 15 Is there an O&M Plan that complies with General MDC (12)?Yes 16 Does the SCM follow the device specific MDC?Yes 17 Was the SCM designed by an NC licensed professional?Yes 18 SHWT elevation (fmsl)N/A 19 Type of sand filter (open or closed)Open 20 If closed, will the filter will be pre-cast or pour-in-place? 21 If closed, top of grate elevation (fmsl) 22 Is this sand filter designed to attenuate peak flows? Yes 23 Volume that can be retained in the sediment chamber (cubic feet)3694 cf 24 Will there be a permanent pool in the sediment chamber?No 25 Bottom of the sediment chamber (fmsl)442.00 26 Area of the sediment chamber (square feet)2868 sf 27 Physical depth of the sediment chamber (inches)24 in 28 Ponding depth in the sediment chamber, above any permanent pool (inches)24 in 29 Elevation of top of weir between chambers (fmsl)444 30 Volume that can be retained in the sand chamber (cubic feet)4160 cf 31 Bottom of the sand chamber (fmsl)440.50 32 Area of the sand chamber (square feet)5547 sf 33 Physical depth of the sand chamber (inches)18 in 34 Ponding depth in the sand chamber, above any permanent pool (inches)24 in 35 Elevation of the bypass device (fmsl) 36 Type of bypass device 37 Mechanism for distributing flow over the sand surface 38 Sand specification for sand chamber ASTM C-33 39 Depth above underdrain pipe (inches)36 in 40 Will the media be maintained to drain at least two inches per hour at the sand surface?Yes 41 Is at least one clean-out pipe provided at the low point of each underdrain line?Yes 42 Will clean-out pipes be capped? Yes 43 Please use this space to provide any additional information about the Sand Filter(s): SAND FILTER MDC FROM 02H .1056 GENERAL MDC FROM 02H .1050 Sand Chamber Sediment Chamber ADDITIONAL INFORMATION Sand Filter 6 4:06 PM 6/8/2020 DRY POND 1 Drainage area number 1 2 2 Design volume of SCM (cu ft)10863 cf 36827 cf 3 Is the SCM sized to treat the SW from all surfaces at build-out?No No 4 Is the SCM located away from contaminated soils?Yes Yes 5 What are the side slopes of the SCM (H:V)?3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)?Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume?No No 9 What is the method for dewatering the SCM for maintenance?Drawdown Orifice Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction?Yes Yes 11 Does the maintenance access comply with General MDC (8)?Yes Yes 12 Does the drainage easement comply with General MDC (9)?Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)?No No 14 Is there an O&M Agreement that complies with General MDC (11)?Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)?Yes Yes 16 Does the SCM follow the device specific MDC?Yes Yes 17 Was the SCM designed by an NC licensed professional?Yes Yes 18 SHWT elevation (fmsl) 19 Elevation of the bottom of the dry pond (fmsl)442 442 20 Distance from bottom to SHWT (feet) 21 Elevation of the temporary pool during the design storm (feet)442 ft 442 ft 22 Ponding depth of the design storm (feet)2 ft 4 ft 23 Will the dry pond be uniformly graded to flow toward the outlet?Yes Yes 24 Is a low flow channel being provided?No No 25 Are the inlet(s) and outlet located in a manner that avoids short-circuiting?Yes Yes 26 Will berms or baffles be provided to increase the flow path?Yes Yes 27 What method of pretreatment will be provided?Forbay Forbay 28 Diameter of drawdown orifice (in)2 in 3 in 29 Drawdown time for the temporary pool (hours)48 hr-120 hr 48 hr-120 hr 30 Does the pond minimize impacts to the receiving channel from the 1-yr, 24-hr storm?Yes Yes 31 Is there a small permantent pool near the orifice to prevent clogging?No Yes 32 Will the outlet be designed to prevent clogging?Yes Yes 33 Are the dam and embankment planted in non- clumping turf grass?Yes Yes 34 Species of turf that will be used on the dam and embankment non-clumping turf grass non-clumping turf grass 35 Will trees and shrubs be prevented from growing on the dam and embankment?Yes Yes 36 Please use this space to provide any additional information about the infiltration system(s): GENERAL MDC FROM 02H .1050 DRY POND MDC FROM 02H .1062 ADDITIONAL INFORMATION Dry Pond 7 4:06 PM 6/8/2020