Loading...
HomeMy WebLinkAboutNCG170073_Inspection Report_20200623ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Valdese Weavers Inc. Attention: Eddie Atkinson 1000 Perkins Road SE Valdese, North Carolina 28690 NORTH CAROLINA Environmental Quality June 23, 2020 Subject: Compliance Evaluation Inspection Permit: NCG170000 Certificate of Coverage: NCG170073 Burke County, North Carolina Dear Mr. Atkinson: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on June 10, 2020. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer Isaiah Reed, C Q, CEPSCI, 4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 I Swannanoa, North Carolina 28778 NOINTAX0�ry orv��nmeowaumro 828.296ASOO Compliance Inspection Report Permit:NCG170073 Effective: 08/01/19 Expiration: 05/31/24 Owner: Valdese Weavers Inc SOC: Effective: Expiration: Facility: Valdese Weavers Incorporated County: Burke 1000 Perkins Rd SE Region: Asheville Valdese NC 28690 Contact Person: Eddie Atkinson Title: Phone: 828-874-2181 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/10/2020 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 01:15PM Exit Time: 02:15PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COG Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG170073 Owner- Facility: Valdese Weavers Inc Inspection Date: 06/10/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On June 10, 2020 this facility was inspected for compliance. I met with James Cogdell on site. During the inspection, the following item was noted: 1) A Stormwater Pollution Prevention Plan was not made available at the time of the inspection. The permittee is directed to expand training efforts to include additional facility staff to locate and make the Stormwater Pollution Prevention Plan available for future inspections. Please give the above items your immediate attention. This facility will be re -inspected on or after July 28, 2020. If the above items have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG170073 Owner- Facility:Valdese Weavers Inc Inspection Date: 06/10/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ At Does the facility provide all necessary secondary containment? ❑ N ❑ ❑ At Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ E ❑ ❑ Comment: See summary for more information. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: See summary for more information. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ E # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ At Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 110 Comment: Page 3 of 3