HomeMy WebLinkAbout20200518 Ver 1_401 Approval Letter_20200618ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
VL Director Land Holding, LLC
Attn: Jeff McDermott
192 Raceway Drive
Mooresville, North Carolina 28117
NORTH CAROLINA
Environmental Quality
June 18, 2020
DWR Project # 20-0518
WASHINGTON County
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS
ALBEMARLE BEACH SOLAR, LLC
Dear Mr. McDermott:
You have our approval for the impacts listed below for the purpose described in your application dated
April 15, 2020 and received by the Division of Water Resources (Division) on April 22, 2020 with
subsequent information received on May 4, 2020, May 29, 2020, June 2, 2020, June 12, 2020, and June
18, 2020. These impacts are covered by the attached Water Quality General Certification Number 4135
and the conditions listed below. Please note that you should get any other federal, state or local permits
before proceeding with your project, including those required by (but not limited to) Sediment and
Erosion Control, Non -Discharge, and Water Supply Watershed regulations.
This approval requires you to follow the conditions listed in the enclosed certifications) or general
permit and the following additional conditions:
1. The following impacts are hereby approved provided that all of the other specific and general
conditions of the Certification are met. No other impacts are approved, including incidental
impacts. [15A NCAC 02H .0506(b)(c)]
Type of Impact
Amount
Amount
Plan location/
Approved (units)
Approved (units)
Reference
Permanent
Temporary
(attached)
Wetland
Impact #A (Access Road for Utility Crossings)
0.031 (acres)
0 (acres)
C501, C502,
Impact #B (Access Road for Utility Crossings)
0.136 (acres)
0 (acres)
C503,
Sheet 1 of 6,
Impact #C (Access Road for Utility Crossings)
0.190 (acres)
0 (acres)
DC7-SUB-A,
DC7-SUB-A,
DC-Cl, and DC8
D E QNorth Carolina Department of Environmental Quality I Division of Water Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
NoarH caaouNa �
Depadment of Environmental Quality/`� 252.946.6481
VL DIRECTOR LAND HOLDING, LLC
DWR# 20-0518
401APPROVAL
Page 2 of 3
Stream
Impact #1 (Culvert Crossing with Cofferdam)
50 (linear feet)
14 (linear feet)
C501, C502,
Impact #2 (Culvert Crossing with Cofferdam)
20 (linear feet)
14 (linear feet)
C503,
Impact #3 (Culvert Crossing with Cofferdam)
10 (linear feet)
14 (linear feet)
Sheet 1 of 6,
Impact #4 (Culvert Crossing with Cofferdam)
60 (linear feet)
14 (linear feet)
DC7-SUB-A,
Impact #5 (Culvert Crossing with Cofferdam)
50 (linear feet)
14 (linear feet)
DC1-SUB-A,
Impact #6 (Culvert Crossing with Cofferdam)
50 (linear feet)
14 (linear feet)
DC-Cl, and DC8
2. Water Quality Certification
The proposed project must comply with all the conditions of the General Water Quality
Certification(s) 4135. [15A NCAC 02H .0507(c)]
3. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Certification. If you
change your project, you must notify the Division and you may be required to submit a new
application package with the appropriate fee. If the property is sold, the new owner must be given
a copy of this approval letter and General Certification and is responsible for complying with all
conditions. [15A NCAC 02H .0507(d)(2)]
4. Within 60 days of completion of construction, as -built drawings (which can be shown on an aerial
or done as a survey) shall be submitted to the Division of Water Resources Washington Regional
Office. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)
5. Turbidity Standard
The Permittee shall adhere to Title 15A NCAC 02B .0222 Tidal Salt Water Quality for SB Waters,
including but not limited to:
[15A NCAC 02B .0220 (12)] pH: shall be between 6.8 and 6.5, except that swamp water may have
a pH as low as 4.3 if it is the result of natural conditions. [15A NCAC 02B .0220(12)]
[15A NCAC 02B .0220 (19)] Turbidity: the turbidity in the receiving waters shall not exceed 25
Nephelometric Turbidity Units; if turbidity exceeds this level due to natural background conditions,
the existing turbidity level shall not be increased. Compliance with this turbidity standard shall
be deemed met when land management activities employ Best Management Practices. [15A
NCAC 02B .0220(19)]
6. This approval and their conditions are final and binding unless contested. [G.S. 143-215.5]
7. The applicant and/or authorized agent shall provide a completed Certificate of Completion form
to the Division within thirty (30) days of project completion (available at
http://edocs.deg.nc.gov/Forms/Certicate-of-Completion). [15A NCAC 02H .0506(b)(5)]
These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a
written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as
OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH
Clerk's Office at (919) 431-3000 for information.
VL DIRECTOR LAND HOLDING, LLC
DWR# 20-0518
401APPROVAL
Page 3 of 3
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is
considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in
the OAH during normal office hours (Mondaythrough Friday between 8:00am and 5:00pm, excluding official
state holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition
along with any applicable OAH filing fee is received by the OAH within five (5) business days following the
faxed transmission.
Mailing address for the OAH:
If sending via US Postal Service: If sending via delivery service (UPS, FedEx,
etc.):
Office of Administrative Hearings Office of Administrative Hearings
6714 Mail Service Center 1711 New Hope Church Road
Raleigh, NC 27699-6714 Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to DENR:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact
Anthony Scarbraugh at 252-948-3924 or anthony.scarbraugh@ncdenr.gov if you have any questions or
concerns.
Sincerely,
Plow TR..t�
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Enclosure: GC 4135
cc: Billy Standridge, USACE Washington Regulatory Field Office (via email)
Randall Jones, DEMLR WaRO (via email)
Laserfiche
n �h,
J FrIN
pq
HCII'm
WM NOTED
1. OEVEL 1 SUN EN. 1. LLc
ISR WWI.
YOBFENI]£. NC ]811]-6509
I. SUM M. I. LLL IMEND$ TO MASIRIILr T15 t110 XRE SOWI ENEAGY EMu IN
WMHWCIpM WUNIY. MR FNI K 9E1ND CE61LXm MO CBN61filCRD B!
Blmwmc soul saM. uc.
a. BWxOMv /+O T]PofAMxIC 6lMEv vRR4CfD R! RaMUN[ tMro SVrvEnXD.
M. P@1ECi IUSC IRFA MD SOIM PMEL 1INWOED W SUN ENER% 1 LLC.
LDMPILIai SNKL CpIENM LEASE uR MU 6aA9 P D. "Y s ,MD, TO ,cMM
ENH vxME.
S. MEIUNRS / J1IPoSDIC]NNBL N.kr DDNMFk. PEREdtlED B/ iMMONS 6Na1P (D D
19/I9/m19. Rm I MDN9 FOR THIS D'FOANDI H4 BEEN vR% O W SUN
E145 NYpi P.cEhFDFi1N1LE K.LIa TWEs FpM.WIG Ra ]DCOOHHR VR 5 L
KRFF wDS OF MPRp'f0 WnMNO DEUNEADONS AND OTHER ,IDMsarnawE
..S.
6. U. CD11PI£HNN OF SFCaNs OF 1. OF 5aM PM6 MMK. TIE SIZE
. K KRW.'IENRY YFGETNIED.
rPACi I -M DWE.. HOLDINGS, UI
192 W4ENAY DROC uP]RESLF, XC 9BI1]
PN N0. 6Z10 1S. I. W D8 SD)... 1.
PRWEmv L TOM. MODJIAWN RwD / . 133
iRM:1 R -N WRG ICX W10 MadMS. LLC
199 P/GEW6Y DfRf. 1100RESNXF. NC 9BIll
PIN NO. B]98-69 44.. IRCIXIMD M Dfl SOS. Po' IDi
PRDMRM LOd1CH WBDDIAWN RdD
1RIC1 ] -ERIC u 51N3WS
41B WASIINNN DOME. RYYDR ]]982
MMD RE 6K9-50 1581 M O8 PG 895
vRDVERn LDr.11w —S— Raw / / sR 1y9
WI WLEOwIw RND ECENIa4 W 9)9]I
'IN
NO B]9B l9 R.M RECD . INIBI PG .b
vROPERi! L :;. wNS RDNB / SN 1.
r T 5 W D"RO R. HOLDINGS LLC
199 RMEWAT D1 1.HOCQSNHE. NC 9$11]
PIX NO,6199-8]-119]. KCVRCID W DO, SUR Po. 102
PNCfFRtt LBG1KK): SWIS DEUGXI RwD / SR IS]S
1WST 6 -WA1VM L WNDFORD
97
3' MNFFO RNL. XIL ROUDX W 97275
RX NO. 6799 96 5516. KCa10ED IN DR SOR K. B])
P MOY LOG1gN: XM NOT D1E11 ASSIGNED
1MCr l -.A B k W. MDCXELL DTSIX1
3J]6 TM IAYDIXC ROND, N1LLYY OM. XCC 17892
TX ND. ]]09 IM ]909. WCDMIN M DR ASM. W. 907
PR�FRIY LOV.TYN1: CNMS RMD / RMER 3 P
APPROVED
North Carolina Environmentai
Management Commission
Division of Watar Rasc)urces
Date
�..r• r_3..tr.�
Permit# 90-0,"Ib'
\ � SEE SHEET L
� FOR IMPACT
. B -.N SOE. 8: xw ..E PERDUE
9]01 rRAYr — DRM' Y.M. D V IJES9
PIN 40. ]]D]-0-5690. RFOONDD IN DO, ]). M. 9N
PR . LOwIYRf ISSI CR039 M.
IP/Li 9 K dflS. 1AN] MMdNGS LLC
112 RU`ERAY aNL MCORFS'LLL NC 9811)
plx NO. 6199 60 33R5. IIEMiCfD Ix D R. SM. P0. 10)
.E. LBwtt W4NM R.
tPIL! l0 N, aREnOR LMO NDUR—t, c
9) PILm' DRNE. MWXESNIF. NO )BII]
pX N0. )]G9 OB B6G], .00MOM IN DR. 509, Po,
ID3
PRyER1Y IDG1pN MYA(EYS RDN / C.0 RCM
1NLr 11 N aM1. LVYI HOUR.. LLC
199 RMODMY DRM1E. MIXNtESUZ NC 28117
MM HD )]09-19-9]84RECGRORI IN OR. 309. PG, 91
PROPEFIY L ODN: 04 W,CN. RCM BETYEEN RMRIN]
FOR IMPACT
OVERALL MAP FOR
REFERENCE ONLY
NOT FOR CONSTRUCTION
SEE SHEET C503
FOR IMPACT AREA B
/
/
1 � _
I
I SEE SHEET
( FOR IMPACT
T
�..1110
SEE SHEET C503
FOR IMPACT AREA A
t
6W D ]CO 6W IiW i.
(IN FEET)
1 I. - SUR R.
15
Know where below.
Call before you dig.
E iw— `_
LE4@�
mxcRE1E uoxvMExr Foux0
p
IRM P FOUND
IRON HW FWND
III-
PN NNi rwNO
PX WR SET
0
GLLCUUIEO OqM
pKPEX1Y IIXE/LGSE MFA
w
ExISIING PGWFR PORE
IX5iPIG SU, MK
Ohr . FIECXDL
---
E451WG ON M
EXfi11W 1KF]NE
.TER6 OF THE US, (W .I)
JANlgM wTVHDO
C -
svHMliO MD N. N161
§kq'�
V
a
g
S,
RI
F
1 "=600'
C500
'-im
as
`�?
nmvwn
u v,Wxnl 1, tl va
\\\l
`
xxgx
n\
1\JI
S
,EYPOPIR! FM
S.NpF
1ENOJPMY Wq Pll.i CCfiFR pW di
GscWWx *a Gwx,Wxc (,ro.)
WIIFf FM)
A F J
,OP"pP'rs .wPRovWrL mmau
qW
Gla aYet or Lnsnxc arcx
'�LK'WIX �{ 3:1 pl MIiFR
IY MI. 3M $LCPE
x•IM'. aar m+m le• WV. e.as'
WSfNt dA,Ai „•
PELVM fAeillle EYIIIW
IX GIGf
36'
xrs
a' M& uu rc olsluWwa:L
APACTAIEA 01
ePECF9 MlE
K-31 iFSU.( 3 IB/laao ss
t%XIYLM BFNYIIPYnWSS 1 of/laao Sr
MNIEA R2 Gwx ] 1e/,000 ss
xmL OflE,e .2 c+wx W my w rsl9 ED M M Ms .
PEIlIE iFSCIIE li OhMFFpNC Fe1Kl5NE0 iFSCVE.
K-31 {EYUE 3 ./1. Si
tWIKKf eERY1M1WiPAtie 1 IB/1 W] u
4°a"1°1+Ei ] u/loon ss
IpIE: ppElE uplEi f W9f5EFgxC 61Ia8ED YIIIEi Oq iE$CUE
oeL,e axuL . GvSLLGxe rnKus,rtA fL]ai.
LIpQ.�M_IfsiVIIYY
SPEGF$ �� M2
K-31 fESC11E ] IB/IM er
KiMER .h C0.VN ] I8/IWO Y
tYYPpmB
K4LY IM Np fiAlKyElt KtQLIN6 ry SCl 1615. QT .VIiY 5N
YI PW MAE 0! f0-10.10 fpflKIIpt
tVfL
YlE JV1E. IXCEL91Al W11N1i Ox OMfR UM1EeIeE CIWINR IAM6
W1ffWL 10 arAI �pW .Wp 9p6 Cf $NNS /lIIY1p1 W1,We
PLR WMIr11CNNFM fSLVYIIENINIIWS. MIWJYEWIf.5 M50 K
IYCLnK1c uLmm a ,EYPGUNY mKuunox.
1tl1�
1. uPAp"wm1 T u ulumev. mx. nc wnx wu wxc ,Ie
1. WIS n 4tTKMR[:
uNv�r w.c1Lo n un nrMMo x:lnnKs
x E6f6'FO mw4 uloR duz m onm vn6 m,»[x ,1ui
mxfu:m wW •,LfPorrm w vw�wxr fauv «na umel'�i1i{�u.e nn. Iu
nnM eQ411 YT�WI� WOO.A�nK K TE WµflKN Of µ1' pN4 n WN!Mt
a NM pi-91E WTW .aArt [MO N M 9R lO E V4W TV VMOC ILL 9W1
E CBLv® feOY .f FOf.110 WMI R.
e 11E tlBIM WX6 A1, 9qM M T6 RN6 6 t43f1 ixW IAM 4V1 MKI IFIO
AMFn {M IEv]M alm.:AYM
aTE arA6LQA7R7N /ECIIBB!!8
91E AV.1 CEIgVIMI
m � ,.[
SIIHV MN IfE iRYE
acm.l.
41 OIIR MiK MM
An6 MIIFx TlW M1
1f ars
p. (PYCVf M rtIfCIG
//y 1p 1d6)
iirIPCRIRY SWIOM! '
aYf roR ]LwYam uYo nllr
CEM31FRW4 p,T.)
( OIRf£3 fND)
y
isPmfwlnrz eopW i3sRonurz
a Lxsnw MW
31 M MtIFR k'Lf55 II]LE
4f SOP
13 YW.
31• NV. e.W' CPhR ♦ YN. e.ie'
. Gc?,
RJ &VWNAI
xrs
19' i01N LMR W CBNRBI LE
/
*V
MAPMC SCALE
0 3 10 0
(W Ffl)
1 i1CH - 10 R.
IX. —.
Wi,µL MI „•
BL1AY' LSeGro xo3rW
Ci WCN
APACTAIEA IP
'PROVED
North Carolina Environmental
Management Commission
Division of Water Resources
Date e -4 i' 2(%_24L
Permit # 2_0'-Lu - -
FINAL DRAWING
NOT FOR
CONSTRUCTION
rtIIFCRAVY 54108fG
I.N fM iFNttMfi M1A %NP
rfM11EPo1p (,YPJ
�WM Flp)
MPNOKNV]E BORW `M%MYJWR
G tXSHW MW ,ro a IMNHG
11 M M1rtR NCFeS IISIE pfCH HVW . . • _
9tE AOFF
13 YIN.
_
y __
36 HpP CULVERT
K.J �K'I�Y11' A -A
. x13
44 W& IMe M WSIUPMVCE
APACTA/EA #3
S LKWMEALLAWNLETA
xrs
Yp.WO K MLOFD ,0
PRpYE 1T YN. UNF.
e T eYN U
(NLMi CU35 i OR M)
I.D.
p• mY)
NLWI CIAS . Ofl GAS$ r. IYFE 1
(� m P�uclw iaorn�xu i�iu
&LW fII51W0 BOIiW
Cf OIfWW
N 0A. CIFM'. SIKIIHE 6VrMLL
(COIIP.CI H e' I1i15)
10 1
:.:`/ �Fw]IWG Pt PPOPoSFD
eVNF CIi pIW
I wu1L
f. r 24-- RYJ.£ WCI[. r Pgk3LM. PULE 54i4T
B,GISIL (tYJgi qA6 V dl N) AYPi£D W
Iff
Z
g
CL U
O�
F T�
g�
a CD
~ W
z
Z W
F
W
J
D
U
1 11= 101
C501
III
s�
1
��----((lEVPORIM Y110 WIIT
_ —Dunn o0)0
A
X. tlN. ].,N EPLP
P6,NL gR SO
BflW' g6N4 BORW
ar urd
W.
sW
P"
ieeCrAFEA
Y
L
I\
�� UIb✓
I
�
yl �.
\�� sYioyOl9Y:Ih.]
�
\
p
SON F
0 5 10 W WPACTAIWIAM
W FEET)
1 WM 1010 R. TBllPOPIAYYW.1
axle 10
ounR Ew)
rzxxWrYm sIWOB,L 1ofaRWn wloaw
carp ow r
DEeiui MP.) oaro vuur aLrurzWW (T.P.7 _ _-.
nn Wo) 1
-- --1— AL
IT AA
—IFE--- -- -- — --- -- ---�}///
�5.0''--�I/
Nrs
lr TOT& LMns a VMROMiCE —
MrWrATAM
Cf. MWWWIAUATMDUAL
NR
SPFCES
M,E
X-31 iESCVE
3 WTI. S
LY'YWX LfnO.OYWASS
1 LB/IM W
MMER ME G0.VN
3 W/IOW M
XD2 W£TE IttE (X Y ULSEWINO ESI.Wl9® n2 nX R3CVE.
OEIETE rESCUE IF Ir pinSEFgW ESiM15XFD fF3ClE
WrW-JLr�WiY1Bl1
IDECES
M.
9-31 igOVE
3lB/1EM 4
GVYWN MNNImY1L55
1 LO/10.b Y
CFRIPl1 YILLn
3 W/TOM 4
Io3L CQRE WLLEI f dSRSEQIMr gi.1&fiIED YILLET ON F.E.
pf{ElE fESEVE f O.tHIE¢b14
E3TIWRXW iEV.IIE
x�
9ECE5
M.
N.-31MINUMME
3 IH/IOEO 3
CRUX
3 Ixp" 3r
IrRr IVE Wm rrnunq WxDRaxO ro rIE 1ESIi d unr sW
WI
IP%W4Y,]E
IPPROYWL BD11fY
1
Tro Cf
Cf E105,.0 MM
W M]IFA
OrtW eWX
t6YS5 ILLF
21 dt MTIFA
XCPE
SCE LIK
3• YIN.
�
�311•.fN. ].(0'_
.. W!N...IyIIMI' C0.4A
M• YN. 11.10'
IX SrMF
36• XDPE IT CDLI/E3
SYWS PnEnl
(50' L CTH)
MNE WrFRI
rzwarm
Wsru aLwu :r
1i14XIPMF
[dRR 6W
ilp WSIWO B011d!
RECIMA �
CEiiER DW
1
a o,ra1
xrs
I
I. W� rt Y O IN! LrVMX11G4 M 0111fA fll4L NY[ M
VIYICS IOGRD
!. WIS V OOIU b'Kf:
a CWOp 0d �VPN�RIpIlT 6II:V�iq� iMM � RWITl�i2 IIL
M.fllffir WICIIG BY WI QFNXX: wM16
3 Dummrz�IW �lsX mu®. wss d onu aav sEmu MT yXxI�L �
IMMtNf d WTNWXI WY.M WFII MIIW ] MS rtL
OIIWt OW5W EN4p lW VA MYS TIHIIIY IIIMXIDPonMVd RYVWrt
dDIXO DD.v WDW14rcM WIflElaxa XW rlWsrcwmc
av srz r wm m M are m a I� rax m:wc ru swE
• BE WNa® TfY X TENTED 6fMG1 M
x ��IOPoWYRX �Cd nW RM6 6 TMFII IMI IbM dU NO IR➢
RM OTAOLW'AIAW ICCIWgBflB
WIl xfX oeuePlvl
^r
s' �,W rox
YD�
,DM
IXf
NWS MX
I3 an
IOF (lKO1 R/ W1fE1W
WaOIIRI
n MTIq IIW .:I
!!D nor mn)
uDuxD ♦s xEEDW ro
PRoxWE Ix- uW. w.uc �
Mao yLITLL
(MW02 LIAS II M XD
O' YIN),
xWm a3ss u art cua e, TIl£
(mYPrcr uTm Prt W xr. PUX
ro PVLWO W1gICN4 rt
01' TW& uuns or pBIWBYA.E
APACTAFFA IO
(XLMWWrAXL
1LC65 M1E
TI OR MIIFA
S E ROP
:• YW.
30• XN..AD
CPRB
M• NV..d0'
�Psr .�lIX £P3—
— —_----
SMWE WhR!
—_—
27- SAND E C
SY
IXSIWL dAVW15 B•
IFIMPoPNIY
9Ll WSIWO BOT104
REWh q.
��r�IX�A��
331[IM
ttfiFN qY
M
Cf Mpl (M)
CLIVFRI
M$
,
- w•'WXu o mlulm Ma
WPACTAWA 10
CIXHW 9/ALLATWWLETAL
APPROVE® FINAL DRAWING
North Carolina Environmental
Management Commission NOT FOR
Division of Water Resources
nateyY / l V- z CONSTRUCTION
SXD.D.-I
!lyyx
—Iqw�; emit# ZL1'(�,
XF TC
YW. COIFA
10
I
/
— —`—
OR FROPoYD
SMWEddM
$EI£OI B'GXRL
(XCDOi CIAO ! M IIQ
(6• YW.)
OD. 4 ]
SEIFL!
a�gnLL (xcmr aAs v m M YuuwEn W
OEOTEluE. TMCMF.4 VMf3 MM
WNpIpXS. Cp1A1Li WXN FMx1EER.
Moo CLl4 u M CI.l3 N.tt,E I
Moo
(CDYPILT M1FA PVE LS SR. PRIENJ
1D WMX6 .WXIPJWL TILL)
a
CIEYI. $Uw a- WXRLL
— 6 X O.D. —'{ (Op " W liR)
10
1 —
/ `g131Wf C11 PROPb' W
svIWE d ErrtN
' � sPwuec
qkX f R249R. WILE SELECT
0..D. r f NNXL (XCWI MS v W.) WYPRO IN
L•f S�=airy/®
2
g
^g
LL
_O
F �
gC.D
Y j
Z W
c
W
>�
J
O
111=101
C502
'
-------------------------
i.
1 \
/
/
4A
l\
/JLIL �-ems(n4T
—I
•.PACT AHEA C
pALL
,.
J I
FINAL DRAWING
NOT FOR
— 10
0 1CONSTRUCTION
(W FEEH
f IHGI _ fG FF.
]\ \ \ 1 (A IRIS
'1 I }III ® »»• q` ...... :�':...............
•II.I I .>p .,w� pXp srvin.n m,N >✓ /,„; pl
11
I1
INSCUL CULVERTS �
8' IN. RELOW
IXRTNC SURFICE (11P.)
I.. R
U. CIA55 II OR
'
♦
I w YI w.': Su I 1111 1
\ \ un
q
5S0' im11 UMgS OE DISNR&IICE 55d TON, UIdR m EFSTGRRWCE —
]O.D'
low
lo.o
MO.
3:1 OR F,VF R
IS' .. GIS4 1
—III
RCOO
SEE SLOPE
(3) 30' HOPE
CEO RT�RLL.WFF.L&d:
lI, D GIYYEL
MC %.
1
— 3AS'
(5134' IDII
IY MIN.
WVw
EOR£R
(IP HEC65M')
5' N CL155
(3)
' — —CULVERTS
3 'HDPE
(3G' LENGTHS)— —
EXISTNG
CNLf ss5
—
P
R-WJ OYER
GEmE%IILE ElBglc
(3) 3 ' HDPE
— — — CULVERTS (30' LENGTHS)— —
BMW
XIS
HE NWOi cLUIs I
IxmNL WUhR15
B' MW. SE.
IX5TN0 9JRFILE (TP.)
BECIkXd A -A
If15
RIP-W OVER GFo3IX111L
AS NEEDED TO
13' MIN. QYrER ,
TILL PEfl 6EOlECHNIGI
�gENNMENMRONS
PXOPOSEo CRUDE III.PRONCE
uOVND AS XEEC£D i0 RLL �'fEmIX
IR' MIM COYFR RECOMYEHOOTOP
MIIC
NMLJ ] 0' SPRIX�INE
11PE 1 RWN, IF
w OYE
ROCN LL i
l NIL) H� BciiA'w NNMONS, CqR
RE
NETLA/D APAC7 S
FOR
Ss.O• TOM UMNS OF olsluRRwcE
14.0. ON.
IwcEss flOIO
•_ 1T NIX.
�Mw 11
(5) 36" HDPE
— —CULVERTS (3G' LENGTHS)—
(IF
_ :1
A
North Carolina _ �.
A
Management Comthiftion
IN Division of
r
VVawRa a i:.-
�nmAFACT 'A'
loo' —
TER
5) ]S- HOPE
.„. • :,R•
N=mNR`8�
SPEOES,Gw MlE
x-JI FESCUE ] Nf/ILW SG
COYMTI REMIUO E 118/IWD Y
WINTER M GRIM J w/IOOG SF
NOTE: DELETE ME GRIM IF ONERSHON"' ESTORUENED RR OR FESCUE.
OCITE FESCUE IF
PhflSE U. ESF.WIS.E. fESCIIE
WYf-.LLY.I®u,an
SPEpFS MlE
x-JI FESCUE 3 I8/IQtl SE
COMMON HRYUIVIPA55 10/10.0 SF
CwWN MIU£T 3 VOOO S,
NOTE: OELEIE .1. IF prER5EF01NG ESIIHUSNED .1. OR FES(UE.
DEIEIE FESCUE P ONEflYFLINC FEEMUSHED F E.
S.PEGEEES MlE
N-31 fESGIE ] IR/;UOU SF
MNIER RIE GPNX 5 GS/I. OF
.VPLE u,, E O FENTUM lFLpIXxc To SGL rFsrs, OR IfNLY sC0
Le PER ncflE of lD-la-10 FFRnuzw.
(�
USE .ME, IXCAyOR .. OR Oww EfEECINE CW I UNING
UT
RUEEM,L FN GRER R011ou M'D sIR3 OF Swe1ES. INCXOR MAmxc
Pw WNUFM.RpFlis TtECOMMENW1NxO XMNOSEEOIXC b NSD AV
RCCEI'P9l uEmN a TnLvoRrxr RDeuzml.
NfER@IY6
Q
,010. —
TER R) 24• XNRE
NY.- 5.53'
IN
1. E MPRKPNIEUAGWOUXO VNM1S LCGR➢TM. TXE MiIX 9WL INYF TF
]. ME IXNIXY'ICX 9W1 EXANE TNL AFA9 GN90E Of M WITS OF AND ..NI
AS r N �o MPMT4NFX15 44m'IPNLr NDTm FOR PRO1ECIN.H IA NO
Rt AVY CIFAbIp MIMIQ
3. sruaunTlw: � (y, EYGSFD SNN6^ IEYigilN'flES OR
OF iERWJ01TXM0 MD OJrtA'R M MT ) 3ryI�WUMNX SEEROIEO N1
UpM Nrt.¢ M X'W10'lf GLFIIX¢ tl.K ONT
OF WYflflM Ci NO, PIDSiVIF! A RI OR �WgXD.
MY 4F PEeu1IE0 AONO
THE . TO OP ISEO N0. GRWXD NLL 9WL
Mp ON TXf RUNE N T m �Y �TXMD NEM
Rp.LTNE O]MPMSpI.
SITE SrABLOATK.NF AEOLNE14NM
ERE DFswgmll
snaEvnTwN —
muc
iP E
fFCFFlw115
w
,�n
GR
wTs
Xx1E (�mml Tom,
a4N`EEs°O4�,Im'"�inwi:l
zn �PE)ronlu
�O
c
EO
g
a g=
Z J
O J
gCD u_j
ry>..Q
rc F m
W c
cc
Un m
Q
1 "-20'
C503
Permit #
N0rtt1 Carolina Envlronmenial
Manage►nent Commission
pivision of water Resources
[ Y zu^" '.
pAte �
-c�SIY
PewmR #
�T 1
r =�
23
le
ROW VIEW SEMON A -A
(WRN GUARDS REMOVED) (WRH GUARDS SHOWN)
D
(WRH GUARDS REMOVED)
N[VIMLO0..WY IIVE PPA15)
3 9 p
1
1
B
SERION %-%
3. Auwrs xDsr wxrux ABDrmwxlNwuTDx sBPNaDRTo
MB W De Two rtET oP AIR aEMMx.
x. pWNN METOSZATW xEVIML W MON IX TOMETO
A ucx3MxD ARAESTEA aRTRAY3EORPWA
3. . T1M..I. BE UNER® WRIT MDIECIM MUNG S® FOA
...R.WRM BIMIEIWI.
CROSSARM CONSTRUCTION
THREE-PHASE, DOUBLE CIRCUIT, SUBSTATION EXIT
UNDERGROUND RISER, DEAD END STRUCTURE, 35KV
I OR OF SON
Is-
2 3
p.
xEurxn� oR un IIVE wms)
FRONT VIEW D SRA-A
WAR
DS ARDS REMOVED) (WITH WARDS SHOWN)
NO.
INVFMORY NO.
HTY
DE591IIION
1
q
IHwIATOPwNT9 TE TOPPNgI[LLSq 5X6
BDLT, MxCNIXE, S/e'DIP.
16
ER, PRAT. ] WIIX 11/16'NOTE
9
1... 1
s
s
CROSSO]]PRM, to FOOVMPTOE
cnos ,sro, 10 FOOT, w000
E
10
CS CROX,EW, woOO �'x]O•
CLEVIs. Ixw ATIiD
Cl
R
1
ML, QASS 53,2loFMExO
IxEU1Pi0R,5W04 C1A55 SY]
q
10
WISXFP, LOIX, 5In
10
10
11
10
WASHt ,FIAT.,OUND. 1•W/NV!
WASHER, MT, PW 1-]/X• WIT19/18' MOLE
Iz
to
wAsl®L, sPlzr wxD, pool. ur
1]
)
IEAD,xPRGR011xD wITl3 ROLE xENP CONq LVG
u
i
PPRiSDFFN. TEA, LASER. INut. z\ Nv
IS
I
gWIT(x, fuIW1, 5CLI.eIAOE, ]S A,,'AU , PMP
16
AS&.
AI MTL IROICI FOR NBING
\i
]
COVEP, gROTFCTNF, SWrtCN
p
IB
CDVEP, MpfECDVE, 161gNPT0R
\q
1
PTEPOINBR, YROLT, FIBER, MGVRE-R
SIDE NEW
(WITH WARDS REMOVED)
mlls
1. AU.NUSFCONIA1x A( RIFNAINIFFNAATOXSVfi1.lE
PR W IDE TYO N=ET OF uR CIEAMIIQ,
E. GROUNMANETOSTWATTHENENMLMS Ei IV RJ]ETO
A uOTTTONo ARRFSTFA OR I..
AL,."ERSTOSHOWRLDWRIIPNORCTORNNdOEIEEDPoA
NM�EA COXOIN700. OTANFINI
APPROVED
North Carolina e'nvironrhentAl
Man
tvirlon aoemrntot'W®tor Commtrrlon
Cerr®goer
Date_
Permit#
CROSSARM CONSTRUCTION
THREE-PHASE, DOUBLE CIRCUIT, SUBSTATION EXIT
UNDERGROUND RISER, TANGENT STRUCTURE, 35KV
1rs•.ru• �nn-sii
R ] 9 9
PUH VIEW
WHEN AWRED
NO,
MVExiONYND.
IIIOESpfIVTIpI
6
INSIMTOR, NN-TWE, MDRE, TF Tb, XA51 CIASS 556
2
R
BOLT. NACNINE, 5/B' D4
\\
WASNER, RE AAi, E 1/X' WIiN 11/I6' NOIF
NUUES,
V
B
]
,10 MT, WOOD
C0.p554W, ST9, \D EDo), WOOD
B
3
BRAG., CROSYAM. WOOD 6Y X 30'
1
1
\EVIS.IX]uXROSE(gNPVw/OEAOEND
x
1
INSVURM, sEOp4 dX5+]}S
9
)
,LOU,S
10
6
NOIT, NNO YX6'W/NVI
\]
6
w/SxEN, M1,i, ROUND. \d/N'` 9p6 xp1F
12
W44XFN. S0.IS NNO.IMl.. 4S'
t]
\
XTTALMNBR, SBOLT�ABE0., FlWRER
EROw) m
WES:
1. ALL PlY5 NU5T CIXRIIN A Q S N INAIUTON SVfAOEN, TO
PR W IDP T W O fER OE AI0. QEMAM2.
]. ORWNDS ARE TO SIOV AT M NEVIML W MON"X TO RLSE TO
ALJQ NGARRPSIERORTNN15EpR
1. AU IIMIE.TO BECWERLO wRN VMI[CTOR TUBIXGS®IG0.
...R...
APPROVED
North Carolina Environmental
Management Commission
Division of Water Resources
Date d6 ICY 20z—�
Permit # "rt v
CROSSARM CONSTRUCTION
THREE-PHASE, LARGE CONDUCTOR
DOUBLE CIRCUIT, TANGENT STRUCTURE, 35KV Irs'-rn• DC-C1
rI
All
FROw wM
0
61DE WEW
GLY OfFSEf (N
1. �Y f�ull0]Gn YnU
1. ALLPIY MN C MNAQ1Yi KXNSUATIXImmam TO
V DFT Rf0.Of N0.QfMMA2.
1. AUg NG TO RAil1EXEUfx11 VMDgX EY611 TO NSF t0
A uoXNxD ANxesreA as TxANSPoFIEA.
]. /JLILMR0.5 TO Y<bhA®WITi MOT[RM TIB�S®Po0.
AMCE0. (OX0.CfW OV}E03f.
APPROVED
North Carolina Environmental
Management Commission
Dlvlal0h of Water Rescercea
Permit #
CROSSARM CONSTRUCTION
THREE-PHASE, LARGE CONDUCTOR
DOUBLE CIRCUIT, DOUBLE DEAD END STRUCTURE, 35KV
OCR
GC4135
Activities meeting any one (1) of the following thresholds or circumstances require written
approval for a 401 Water Quality Certification from the Division of Water Resources (DWR):
a) If any of the conditions of this Certification (listed below) cannot be met; or
b) Any temporary or permanent impacts to wetlands, open waters and/or streams, except
for construction of a driveway to a single family residential lot that is determined to not
be part of a larger common plan of development, as long as the driveway involves a
travel lane of less than 25 feet and total stream impacts of less than 60 feet, including
any topographic/slope stabilization or in -stream stabilization needed for the crossing; or
c) Any stream relocation or stream restoration; or
d) Any high -density project, as defined in 15A NCAC 02H .1003(2)(a) and by the density
thresholds specified in 15A NCAC 02H .1017, which:
L Disturbs one acre or more of land (including a project that disturbs less than one
acre of land that is part of a larger common plan of development or sale); and
ii. Has permanent wetland, stream or open water impacts; and
iii. Is proposing new built -upon area; and
iv. Does not have a stormwater management plan reviewed and approved under a
state stormwater program' or a state -approved local government stormwater
program'.
Projects that have vested rights, exemptions, or grandfathering from state or locally -
implemented stormwater programs and projects that satisfy state or locally -
implemented stormwater programs through use of community in -lieu programs require
written approval; or
e) Any permanent impacts to waters, or to wetlands adjacent to waters, designated as:
ORW (including SAV), HQW (including PNA), SA, WS-I, WS-II, or North Carolina or
National Wild and Scenic River.
f) Any permanent impacts to waters, or to wetlands adjacent to waters, designated as
Trout except for driveway projects that are below threshold (b) above provided that:
L The impacts are not adjacent to any existing structures
ii. All conditions of this General Certification can be met, including adherence to
any moratoriums as stated in Condition #10; and
iii. A Notification of Work in Trout Watersheds Form is submitted to the Division at
least 60 days prior to commencement of work; or
g) Any permanent impacts to coastal wetlands [15A NCAC 07H .0205], or Unique Wetlands
(UWL); or
h) Any impact associated with a Notice of Violation or an enforcement action for
violation(s) of NC Wetland Rules (15A NCAC 02H .0500), NC Isolated Wetland Rules (15A
NCAC 02H .1300), NC Surface Water or Wetland Standards (15A NCAC 02B .0200), or
State Regulated Riparian Buffer Rules (15A NCAC 02B .0200); or
1 e.g. Coastal Counties, HQW, ORW, or state -implemented Phase II NPDES
2 e.g. Delegated Phase 11 NPDES, Water Supply Watershed, Nutrient -Sensitive Waters, or Universal Stormwater
Management Program
Page 2 of 11
GC4135
i) Any impacts to subject water bodies and/or state regulated riparian buffers along
subject water bodies in the Neuse, Tar -Pamlico, or Catawba River Basins or in the
Randleman Lake, Jordan Lake or Goose Creek Watersheds (or any other basin or
watershed with State Regulated Riparian Area Protection Rules [Buffer Rules] in effect
at the time of application) unless:
i. The activities are listed as "EXEMPT" from these rules; or
ii. A Buffer Authorization Certificate is issued by the NC Division of Coastal
Management (DCM); or
iii. A Buffer Authorization Certificate or a Minor Variance is issued by a delegated or
designated local government implementing a state riparian buffer program
pursuant to 143-215.23
Activities included in this General Certification that do not meet one of the thresholds listed
above do not require written approval.
I. ACTIVITY SPECIFIC CONDITIONS:
1. If this Water Quality Certification is used to access residential, commercial or industrial
building sites, then all parcels owned by the applicant that are part of the single and
complete project authorized by this Certification must be buildable without additional
impacts to streams or wetlands. If required in writing by DWR, the applicant shall provide
evidence that the parcels are buildable without requiring additional impacts to wetlands,
waters, or state regulated riparian buffers. [15A NCAC 02H .0506(b)(4) and (c)(4)]
2. For road and driveway construction purposes, this Certification shall only be utilized from
natural high ground to natural high ground. [15A NCAC 02H .0506(b)(2) and (c)(2)]
3. Deed notifications or similar mechanisms shall be placed on all lots with retained
jurisdictional wetlands, waters, and state regulated riparian buffers within the project
boundaries in order to assure compliance with NC Wetland Rules (15A NCAC 02H .0500), NC
Isolated Wetland Rules (15A NCAC 02H .1300), and/or State Regulated Riparian Buffer Rules
(15A NCAC 02B .0200). These mechanisms shall be put in place at the time of recording of
the property or individual parcels, whichever is appropriate. [15A NCAC 02H .0506(b)(4)
and (c)(4)]
4. For the North Carolina Department of Transportation, compliance with the NCDOT's
individual NPDES permit NCS000250 shall serve to satisfy this condition. All other high -
density projects that trigger threshold item (d) above shall comply with one of the following
requirements: [15A NCAC 02H .0506(b)(5) and (c)(5)]
Page 3 of 11
GC4135
a. Provide a completed Stormwater Management Plan (SMP) for review and approval,
including all appropriate stormwater control measure (SCM) supplemental forms and
associated items, that complies with the high -density development requirements of 15A
NCAC 02H .1003. Stormwater management shall be provided throughout the entire
project area in accordance with 15A NCAC 02H .1003. For the purposes of 15A NCAC
02H .1003(2)(a), density thresholds shall be determined in accordance with 15A NCAC
02H .1017.
b. Provide documentation (including calculations, photos, etc.) that the project will not
cause degradation of downstream surface waters. Documentation shall include a
detailed analysis of the hydrological impacts from stormwater runoff when considering
the volume and velocity of stormwater runoff from the project built upon area and the
size and existing condition of the receiving stream(s).
Exceptions to this condition require application to and written approval from DWR.
II. GENERAL CONDITIONS:
1. When written authorization is required, the plans and specifications for the project are
incorporated into the authorization by reference and are an enforceable part of the
Certification. Any modifications to the project require notification to DWR and may require
an application submittal to DWR with the appropriate fee. [15A NCAC 02H .0501 and .0502]
2. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the
footprint of the impacts (including temporary impacts) as authorized in the written approval
from DWR; or beyond the thresholds established for use of this Certification without
written authorization. [15A NCAC 02H .0501 and .0502]
No removal of vegetation or other impacts of any kind shall occur to state regulated riparian
buffers beyond the footprint of impacts approved in a Buffer Authorization or Variance or
as listed as an exempt activity in the applicable riparian buffer rules. [15A NCAC 02B .0200]
3. In accordance with 15A NCAC 02H .0506(h) and Session Law 2017-10, compensatory
mitigation may be required for losses of greater than 300 linear feet of perennial streams
and/or greater than one (1) acre of wetlands. Impacts associated with the removal of a
dam shall not require mitigation when the removal complies with the requirements of Part
3 of Article 21 in Chapter 143 of the North Carolina General Statutes. Impacts to isolated
and other non-404 jurisdictional wetlands shall not be combined with 404 jurisdictional
wetlands for the purpose of determining when impact thresholds trigger a mitigation
requirement. For linear publicly owned and maintained transportation projects that are not
determined to be part of a larger common plan of development by the US Army Corps of
Engineers, compensatory mitigation may be required for losses of greater than 300 linear
feet per perennial stream.
Page 4 of 11
GC4135
Compensatory stream and/or wetland mitigation shall be proposed and completed in
compliance with G.S. 143-214.11. For applicants proposing to conduct mitigation within a
project site, a complete mitigation proposal developed in accordance with the most recent
guidance issued by the US Army Corps of Engineers Wilmington District shall be submitted
for review and approval with the application for impacts.
4. All activities shall be in compliance with any applicable State Regulated Riparian Buffer
Rules in Chapter 2 of Title 15A.
5. When applicable, all construction activities shall be performed and maintained in full
compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973).
Regardless of applicability of the Sediment and Pollution Control Act, all projects shall
incorporate appropriate Best Management Practices for the control of sediment and
erosion so that no violations of state water quality standards, statutes, or rules occur. [15A
NCAC 02H .0506(b)(3) and (c)(3) and 15A NCAC 02B .0200]
Design, installation, operation, and maintenance of all sediment and erosion control
measures shall be equal to or exceed the requirements specified in the most recent version
of the North Carolina Sediment and Erosion Control Manual, or for linear transportation
projects, the NCDOT Sediment and Erosion Control Manual.
All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil)
sites, including contractor -owned or leased borrow pits associated with the project.
Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
For borrow pit sites, the erosion and sediment control measures shall be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Surface Mining Manual. Reclamation measures and implementation shall
comply with the reclamation in accordance with the requirements of the Sedimentation
Pollution Control Act and the Mining Act of 1971.
If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), SA,
WS-I, WS-11, High Quality Waters (HQW), or Outstanding Resource Waters (ORW), then the
sedimentation and erosion control designs shall comply with the requirements set forth in
15A NCAC 04B .0124, Design Standards in Sensitive Watersheds.
6. Sediment and erosion control measures shall not be placed in wetlands or waters except
within the footprint of temporary or permanent impacts authorized under this Certification.
Exceptions to this condition require application to and written approval from DWR. [15A
NCAC 02H .0501 and .0502]
7. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be
used along streambanks or within wetlands. Exceptions to this condition require
application to and written approval from DWR. [15A NCAC 02B .0201]
Page 5 of 11
GC4135
8. An NPDES Construction Stormwater Permit (NCG010000) is required for construction
projects that disturb one (1) or more acres of land. The NCG010000 Permit allows
stormwater to be discharged during land disturbing construction activities as stipulated in
the conditions of the permit. If the project is covered by this permit, full compliance with
permit conditions including the erosion & sedimentation control plan, inspections and
maintenance, self -monitoring, record keeping and reporting requirements is required. [15A
NCAC 02H .0506(b)(5) and (c)(5)]
The North Carolina Department of Transportation (NCDOT) shall be required to be in full
compliance with the conditions related to construction activities within the most recent
version of their individual NPDES (NCS000250) stormwater permit. [15A NCAC 02H
.0506(b)(5) and (c)(5)]
9. All work in or adjacent to streams shall be conducted so that the flowing stream does not
come in contact with the disturbed area. Approved best management practices from the
most current version of the NC Sediment and Erosion Control Manual, or the NC DOT
Construction and Maintenance Activities Manual, such as sandbags, rock berms,
cofferdams, and other diversion structures shall be used to minimize excavation in flowing
water. Exceptions to this condition require application to and written approval from DWR.
[15A NCAC 02H .0506(b)(3) and (c)(3)]
10. If activities must occur during periods of high biological activity (e.g. sea turtle nesting, fish
spawning, or bird nesting), then biological monitoring may be required at the request of
other state or federal agencies and coordinated with these activities. [15A NCAC 02H .0506
(b)(2) and 15A NCAC 046 .0125]
All moratoriums on construction activities established by the NC Wildlife Resources
Commission (WRC), US Fish and Wildlife Service (USFWS), NC Division of Marine Fisheries
(DMF), or National Marine Fisheries Service (NMFS) shall be implemented. Exceptions to
this condition require written approval by the resource agency responsible for the given
moratorium. A copy of the approval from the resource agency shall be forwarded to DWR.
Work within a designated trout watershed of North Carolina (as identified by the
Wilmington District of the US Army Corps of Engineers), or identified state or federal
endangered or threatened species habitat, shall be coordinated with the appropriate WRC,
USFWS, NMFS, and/or DMF personnel.
11. Culverts shall be designed and installed in such a manner that the original stream profiles
are not altered and allow for aquatic life movement during low flows. The dimension,
pattern, and profile of the stream above and below a pipe or culvert shall not be modified
by widening the stream channel or by reducing the depth of the stream in connection with
the construction activity. The width, height, and gradient of a proposed culvert shall be
such as to pass the average historical low flow and spring flow without adversely altering
flow velocity. [15A NCAC 02H .0506(b)(2) and (c)(2)]
Page 6 of 11
GC4135
Placement of culverts and other structures in streams shall be below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48 inches, and 20% of
the culvert diameter for culverts having a diameter less than or equal to 48 inches, to allow
low flow passage of water and aquatic life.
If multiple pipes or barrels are required, they shall be designed to mimic the existing stream
cross section as closely as possible including pipes or barrels at flood plain elevation and/or
sills where appropriate. Widening the stream channel shall be avoided.
When topographic constraints indicate culvert slopes of greater than 5%, culvert burial is
not required, provided that all alternative options for flattening the slope have been
investigated and aquatic life movement/connectivity has been provided when possible (e.g.
rock ladders, cross vanes, etc.). Notification, including supporting documentation to include
a location map of the culvert, culvert profile drawings, and slope calculations, shall be
provided to DWR 60 calendar days prior to the installation of the culvert.
When bedrock is present in culvert locations, culvert burial is not required provided that
there is sufficient documentation of the presence of bedrock. Notification, including
supporting documentation such as, a location map of the culvert, geotechnical reports,
photographs, etc. shall be provided to DWR a minimum of 60 calendar days prior to the
installation of the culvert. If bedrock is discovered during construction, then DWR shall be
notified by phone or email within 24 hours of discovery.
If other site -specific topographic constraints preclude the ability to bury the culverts as
described above and/or it can be demonstrated that burying the culvert would result in
destabilization of the channel, then exceptions to this condition require application to and
written approval from DWR.
Installation of culverts in wetlands shall ensure continuity of water movement and be
designed to adequately accommodate high water or flood conditions. When roadways,
causeways, or other fill projects are constructed across FEMA-designated floodways or
wetlands, openings such as culverts or bridges shall be provided to maintain the natural
hydrology of the system as well as prevent constriction of the floodway that may result in
destabilization of streams or wetlands.
The establishment of native woody vegetation and other soft stream bank stabilization
techniques shall be used where practicable instead of rip -rap or other bank hardening
methods.
12. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be
directed across the bridge and pre-treated through site -appropriate means to the maximum
extent practicable (e.g. grassed swales, pre -formed scour holes, vegetated buffers, etc.)
before entering the stream. Exceptions to this condition require application to and written
approval from DWR. [15A NCAC 02H .0506(b)(5)]
Page 7 of 11
GC4135
13. Application of fertilizer to establish planted/seeded vegetation within disturbed riparian
areas and/or wetlands shall be conducted at agronomic rates and shall comply with all
other Federal, State and Local regulations. Fertilizer application shall be accomplished in a
manner that minimizes the risk of contact between the fertilizer and surface waters. [15A
NCAC 02B .0200 and 15A NCAC 02B .0231]
14. If concrete is used during construction, then all necessary measures shall be taken to
prevent direct contact between uncured or curing concrete and waters of the state. Water
that inadvertently contacts uncured concrete shall not be discharged to waters of the state.
[15A NCAC 02B .0200]
15. All proposed and approved temporary fill and culverts shall be removed and the impacted
area shall be returned to natural conditions within 60 calendar days after the temporary
impact is no longer necessary. The impacted areas shall be restored to original grade,
including each stream's original cross sectional dimensions, planform pattern, and
longitudinal bed profile. For projects that receive written approval, no temporary impacts
are allowed beyond those included in the application and authorization. All temporarily
impacted sites shall be restored and stabilized with native vegetation. [15A NCAC 02H
.0506(b)(2) and (c)(2)]
16. All proposed and approved temporary pipes/culverts/rip-rap pads etc. in streams shall be
installed as outlined in the most recent edition of the North Carolina Sediment and Erosion
Control Planning and Design Manual or the North Carolina Surface Mining Manual or the
North Carolina Department of Transportation Best Management Practices for Construction
and Maintenance Activities so as not to restrict stream flow or cause dis-equilibrium during
use of this Certification. [15A NCAC 02H .0506(b)(2) and (c)(2)]
17. Any rip -rap required for proper culvert placement, stream stabilization, or restoration of
temporarily disturbed areas shall be restricted to the area directly impacted by the
approved construction activity. All rip -rap shall be placed such that the original stream
elevation and streambank contours are restored and maintained. Placement of rip -rap or
other approved materials shall not result in de -stabilization of the stream bed or banks
upstream or downstream of the area or in a manner that precludes aquatic life passage.
[15A NCAC 02H .0506(b)(2)]
18. Any rip -rap used for stream or shoreline stabilization shall be of a size and density to
prevent movement by wave, current action, or stream flows and shall consist of clean rock
or masonry material free of debris or toxic pollutants. Rip -rap shall not be installed in the
streambed except in specific areas required for velocity control and to ensure structural
integrity of bank stabilization measures. [15A NCAC 02H .0506(b)(2)]
19. Applications for rip -rap groins proposed in accordance with 15A NCAC 07H .1401 (NC
Division of Coastal Management General Permit for construction of Wooden and Rip -rap
Groins in Estuarine and Public Trust Waters) shall meet all the specific conditions for design
and construction specified in 15A NCAC 07H .1405.
Page 8 of 11
GC4135
20. All mechanized equipment operated near surface waters shall be inspected and maintained
regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids,
or other toxic materials. Construction shall be staged in order to minimize the exposure of
equipment to surface waters to the maximum extent practicable. Fueling, lubrication and
general equipment maintenance shall be performed in a manner to prevent, to the
maximum extent practicable, contamination of surface waters by fuels and oils. [15A NCAC
02H .0506(b)(3) and (c)(3) and 15A NCAC 02B .0211 (12)]
21. Heavy equipment working in wetlands shall be placed on mats or other measures shall be
taken to minimize soil disturbance. [15A NCAC 02H .0506(b)(3) and (c)(3)]
22. In accordance with 143-215.85(b), the applicant shall report any petroleum spill of 25
gallons or more; any spill regardless of amount that causes a sheen on surface waters; any
petroleum spill regardless of amount occurring within 100 feet of surface waters; and any
petroleum spill less than 25 gallons that cannot be cleaned up within 24 hours.
23. If an environmental document is required under the State Environmental Policy Act (SEPA),
then this General Certification is not valid until a Finding of No Significant Impact (FONSI) or
Record of Decision (ROD) is issued by the State Clearinghouse. If an environmental
document is required under the National Environmental Policy Act (NEPA), then this
General Certification is not valid until a Categorical Exclusion, the Final Environmental
Assessment, or Final Environmental Impact Statement is published by the lead agency. [15A
NCAC 01C .0107(a)]
24. This General Certification does not relieve the applicant of the responsibility to obtain all
other required Federal, State, or Local approvals before proceeding with the project,
including those required by, but not limited to, Sediment and Erosion Control, Non -
Discharge, Water Supply Watershed, and Trout Buffer regulations.
25. The applicant and their authorized agents shall conduct all activities in a manner consistent
with State water quality standards (including any requirements resulting from compliance
with §303(d) of the Clean Water Act), and any other appropriate requirements of State and
Federal Law. If DWR determines that such standards or laws are not being met, including
failure to sustain a designated or achieved use, or that State or Federal law is being violated,
or that further conditions are necessary to assure compliance, then DWR may revoke or
modify a written authorization associated with this General Water Quality Certification.
[15A NCAC 02H .0507(d)]
26. The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this permit in the construction and maintenance of this project, and shall
provide each of its contractors and/or agents associated with the construction or
maintenance of this project with a copy of this Certification. A copy of this Certification,
including all conditions shall be available at the project site during the construction and
maintenance of this project. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and
(c)(2)]
Page 9 of 11
GC4135
27. When written authorization is required for use of this Certification, upon completion of all
permitted impacts included within the approval and any subsequent modifications, the
applicant shall be required to return a certificate of completion (available on the DWR
website https://edocs.deg.nc.gov/Forms/Certificate-of-Completion). [15A NCAC 02H
.0502(f)]
28. Additional site -specific conditions, including monitoring and/or modeling requirements,
may be added to the written approval letter for projects proposed under this Water Quality
Certification in order to ensure compliance with all applicable water quality and effluent
standards. [15A NCAC 02H .0507(c)]
29. If the property or project is sold or transferred, the new permittee shall be given a copy of
this Certification (and written authorization if applicable) and is responsible for complying
with all conditions. [15A NCAC 02H .0501 and .0502]
GENERAL CERTIFICATION ADMINISTRATION:
1. In accordance with North Carolina General Statute 143-215.3D(e), written approval for a
401 Water Quality General Certification must include the appropriate fee. An applicant for
a CAMA permit under Article 7 of Chapter 113A of the General Statutes for which a Water
Quality Certification is required shall only make one payment to satisfy both agencies; the
fee shall be as established by the Secretary in accordance with 143-215.3D(e)(7).
2. This Certification neither grants nor affirms any property right, license, or privilege in any
waters, or any right of use in any waters. This Certification does not authorize any person
to interfere with the riparian rights, littoral rights, or water use rights of any other person
and this Certification does not create any prescriptive right or any right of priority regarding
any usage of water. This Certification shall not be interposed as a defense in any action
respecting the determination of riparian or littoral rights or other rights to water use. No
consumptive user is deemed by virtue of this Certification to possess any prescriptive or
other right of priority with respect to any other consumptive user regardless of the quantity
of the withdrawal or the date on which the withdrawal was initiated or expanded.
3. This Certification grants permission to the Director, an authorized representative of the
Director, or DWR staff, upon the presentation of proper credentials, to enter the property
during normal business hours. [15A NCAC 02H .0502(e)]
4. This General Certification shall expire on the same day as the expiration date of the
corresponding Nationwide Permit and/or Regional General Permit. The conditions in effect
on the date of issuance of Certification for a specific project shall remain in effect for the life
of the project, regardless of the expiration date of this Certification. This General
Certification is rescinded when the US Army Corps of Engineers reauthorizes any of the
corresponding Nationwide Permits and/or Regional General Permits or when deemed
appropriate by the Director of the Division of Water Resources.
Page 10 of 11
GC4135
5. Non-compliance with or violation of the conditions herein set forth by a specific project may
result in revocation of this General Certification for the project and may also result in
criminal and/or civil penalties.
6. The Director of the North Carolina Division of Water Resources may require submission of a
formal application for Individual Certification for any project in this category of activity if it
is deemed in the public's best interest or determined that the project is likely to have a
significant adverse effect upon water quality, including state or federally listed endangered
or threatened aquatic species, or degrade the waters so that existing uses of the water or
downstream waters are precluded.
History Note: Water Quality Certification (WQC) Number 4135 issued December 1, 2017
replaces WQC Number 4088 issued March 3, 2017; WQC 3886 issued March 12, 2012; WQC
Number 3820 issued April 6, 2010; WQC Number 3627 issued March 2007; WQC Number 3404
issued March 2003; WQC Number 3375 issued March 18, 2002; WQC Number 3289 issued June
1, 2000; WQC Number 3103 issued February 11, 1997, WQC Number 2732 issued May 1, 1992,
WQC Number 2666 issued January 21, 1992; WQC Number 2177 issued November 5, 1987.
Page 11 of 11