May 28, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Elevate Haw River, LLC
ATTN: H. Frank Auman, III, Manager
305 Blandwood Ave.
Greensboro, NC 27401
RE: Project Name: ELEVATE HAW RIVER
Acres Approved: 12.7
Project ID: ALAMA-2020-039
County: Alamance
City: Graham
Address: 957 Woody Dr.
River Basin: Cape Fear
Stream Classification: WS-V;NSW - Jordan Lake Watershed
Submitted By: CPT Engineering & Surveying, Inc.
Date Received by LQS: May 11, 2020
Plan Type: New
Dear Mr. Auman,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC
issued prior to the commencement of any land disturbing activity on the above -named project.
The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form
to Annette Lucas at Annette.lucasC@_ncdenr.gov or Paul Clark at Paul. clark@ncdenr.gov. After you
submit a complete and correct NOI Form, a COC will be emailed to you within three business
days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a
$100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105
NOfT!}I CAROLINl� -�
°°o^�"^°n'°'Fn."r^°^ lOw';\ /� 336,776.9800
Letter of Approval with Modifications
Elevate Haw River, LLC
May 28, 2020
Page 2 of 3
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application
fee. You are requested to file an amended form if there is any change in the information included
on the form. In addition, it would be helpful if you notify this office of the proposed starting date
for this project. Please notify us if you plan to have a preconstruction conference. Your
cooperation is appreciated.
Sincerely,
?chary Lentz, EI
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCG01 Fact Sheet
cc: CPT Engineering & Surveying, Inc.
ATTN: Todd Murphy
4400 Tyning St.
High Point, NC 27265
WSRO file
Letter of Approval with Modifications
Elevate Haw River, LLC
May 28, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: ELEVATE HAW RIVER
Project ID: ALAMA-2020-039
County: Alamance
1. Page 6 of the Stormwater Operation and Maintenance Agreement with the City of Graham must be
provided when it is completed. [15A NCAC 4B .0106(a)(5)]
2. Any changes made to stormwater control measures or activity in the Jordan Lake Buffer due to
interactions with other regulatory agencies must be reported to this office.
[15A NCAC 4B .0106(a)(5)]
3. The stormwater discharge points and downstream watercourse must be inspected per NCGO 1 self -
inspection requirements to assure that stormwater runoff will not result in accelerated erosion.
[15A NCAC 4B .0106(a)(6)]
4. Additional measures may be required - The applicant is responsible for the control of sediment on -
site. If the approved erosion and sedimentation control measures prove insufficient, the applicant
must take those additional steps necessary to stop sediment from leaving this site.
[15A NCAC 4B .01151
Ref: G.S. 113A-54.1 through G.S.113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities