Loading...
HomeMy WebLinkAboutNCC202574_ESC Approval Submitted_20200619ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality May 28, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Elevate Haw River, LLC ATTN: H. Frank Auman, III, Manager 305 Blandwood Ave. Greensboro, NC 27401 RE: Project Name: ELEVATE HAW RIVER Acres Approved: 12.7 Project ID: ALAMA-2020-039 County: Alamance City: Graham Address: 957 Woody Dr. River Basin: Cape Fear Stream Classification: WS-V;NSW - Jordan Lake Watershed Submitted By: CPT Engineering & Surveying, Inc. Date Received by LQS: May 11, 2020 Plan Type: New Dear Mr. Auman, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucasC@_ncdenr.gov or Paul Clark at Paul. clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 NOfT!}I CAROLINl� -� °°o^�"^°n'°'Fn."r^°^ lOw';\ /� 336,776.9800 Letter of Approval with Modifications Elevate Haw River, LLC May 28, 2020 Page 2 of 3 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, ?chary Lentz, EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCG01 Fact Sheet cc: CPT Engineering & Surveying, Inc. ATTN: Todd Murphy 4400 Tyning St. High Point, NC 27265 WSRO file Letter of Approval with Modifications Elevate Haw River, LLC May 28, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: ELEVATE HAW RIVER Project ID: ALAMA-2020-039 County: Alamance 1. Page 6 of the Stormwater Operation and Maintenance Agreement with the City of Graham must be provided when it is completed. [15A NCAC 4B .0106(a)(5)] 2. Any changes made to stormwater control measures or activity in the Jordan Lake Buffer due to interactions with other regulatory agencies must be reported to this office. [15A NCAC 4B .0106(a)(5)] 3. The stormwater discharge points and downstream watercourse must be inspected per NCGO 1 self - inspection requirements to assure that stormwater runoff will not result in accelerated erosion. [15A NCAC 4B .0106(a)(6)] 4. Additional measures may be required - The applicant is responsible for the control of sediment on - site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .01151 Ref: G.S. 113A-54.1 through G.S.113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities IRVin �4 4.0 O � 4-1 O i - �o 40. �. a wn O N 4-1 • O C GAO Ct C