Loading...
HomeMy WebLinkAboutNCG060295_DMR_20200302 STORM WATER DISCHARGE MONITORING REPORT for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG060000 Date submitted 03/02i2020 CERTIFICATE OF COVERAGE NO. NCG06 0 2 9 5 SAMPLE COLLECTION YEAR 2020 FACILITY NAME Mountaire Farms Inc.-Lumber Bridge Processing Plant COUNTY Robeson SAMPLE PERIOD Jan-June PI July-Dec PERSON COLLECTING SAMPLES Robert Jackson or ■ Monthly _February (month) LABORATORY Cameron Testing Services,Inc. Lab Cert.# 645 DISCHARGING TO CLASS ]ORW fHQW nTrout PNA I Zero-flow I Water Supply ISA •Other C;Sw FACILITY ACTIVITIES INCLUDE (check all that apply): RECEIVED • use/process meats n use animal fats/byproducts MAR 0 5 2020 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 GEN r►c.i,_ TILES DWR SECTION Part A: Stormwater Benchmarks and Monitoring Results Total event rainfall 20_3"_ or n No discharge this period' Date Sample TSS, pH, COD, Oil and Grease, Fecal Coliform, Enterococci, Outfall No. Collected,mo/dd/yr mg/L Standard units mg/L mg/L _ Colonies per 100 ml Colonies per 100 ml Benchmark - 100 or 504 Within 6.0—9.0 120 30 10001 5001 _ Parameter Code - C0530 00400 00340 00556 31616 61211 01 02/06/20 20.6 5,9 23.0 <6 340 02 02/06/20 80 7.8 220 <6 900 03 02/06/20 119 6.9 58.0 <6 15400 1 Only applies to facilities that use/process meats. 'The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at any,outfalls.You must still submit this discharge monitoring report with a checkmark here. 'See General Permit text,Table 1,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new oil per month? ■ yes no (if yes, complete Part B) Permit Date: 11/1/2018-05/31/2021 SWU-249, Last Revised 11/5/2018 Page 1 of 2 Part B:Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new motor oil/month. Date Sample Collected 24-hour rainfall amount, New Motor Oil or Non-Polar 0&G/Total Outfall No. 2 Total Suspended Solids (mo/dd/yr) InchesHydraulic Oil Usage Petroleum Hydrocarbons Benchmarks - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code - 46529 NCOIL 00552 C0530 2 02/08/20 0.3 410 gal <8 80 Footnotes from Part A also apply to Part B *FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES El NO Ei IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES El NO E] REGIONAL OFFICE CONTACT NAME: Bradley Bennet Mail an original copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted: Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and mplete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for know' g violations." r Lea 4, Signature of Per ittee Date Permit Date:11/1/2018-05/31/2021 SWU-249,Last Revised 11/5/2018 Page 2 of 2 /Md2iThi.ire- Freif firurie otrAnt n March 2, 2020 North Carolina Department of Environmental Quality Division of Water Quality 1617 Mail Service Center RE: Permit No. NCG060295 To Whom it May Concern: Enclosed please find the Discharge Monitoring Report required by the storm water general permit at the Mountaire Lumber Bridge Processing Facility. The DMR reflects the month of February 2020. Should you have any questions, please contact me at 919-663-6729. Sincerely, RECFIVED wit,\AL) g_t*tvs_\__) MAR 0 5 2020 Elizabeth Gordon CEN I f'WL ►-►LES OMR SECTION Environmental Compliance Auditor cc: Robert Jackson, Mountaire James Hendrick, Mountaire Tanya Rogers-Vickers, Mountaire . ..,.. • • Mountaire Farms Inc. "We measure quality by how well we service our internal and external customers"