Loading...
HomeMy WebLinkAboutWQ0035027_Final Eng. Cert._20130218 ��c�IVED CGM A s s o C I A T E s FEB 1 9 -2013 February 18, 2013 nWQ/Surface Water Protection Section Asl�e�ille Regional Office Mr. Chuck Cranford Division of Water Quality-Asheville Regional Office North Carolina Department of Environment And Natural Resources 2090 U.S.Highway 70 Swannanoa,North Carolina 28778 Re :ow�1eM~"ounta,ri Roa Sewer LineV•xE tension, Permit No ,�QQ0:35`027 Town of Franklin Macon County,North Carolina Dear Mr. Cranford: In accordance with the above referenced permit issued by your office, please find enclosed thelfinal engirier�n ertifi a ion and.one (1) copy of record drawings for the above referenced project. If any additional information is required,please contact me. Sincerely, McGILL ASSOCIATES A. MIKE WARESAK, PE Senior Project Manager Enclosures cc: Sam Greenwood, Town Manager(w/enclosures) Jay Gibson, Town of Franklin(w/enclosures) P/10.0033/ccl8feb13-eng certification.doc Engineering . Planning . F- inance McGill Associates,P.A. P.O.Box 2259,Asheville,NC 28802 • 55 Broad Street,Asheville,NC 28801 828-252-0575 • Fax:828-252-2518 PERMIT NO W00035027 Town of Franklin Dowdle Mtn Sewer Line Extension, Macon County October 8. 2010 ENGINEERING CERTIFICATION —POST CONSTRUCTION System Description: permission is hereby granted to the Town of Franklin for the construction and operation of approximately. 1,047 linear feet of 12-inch gravity seWer-to serve a shopping center with office and retail space serving 50 employees, as part of the Dowdle Mountain Sewer Line Extension project, and the 'discharge of 1,250 gallons per day of collected domestic wastewater into the Town of Franklin's existing sewerage system Complete and submit this form to the Ashevilie regional office with the following: • One copy of the project record drawings(plan & profile views of sewer lines) of the wastewater collection system extension • supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s)or storage greater than longest past three year outage reliability option selected)for any pump stations permitted as part of this project • Changes to the project should be clearly identified.on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate unt is nngnn_e r c i ca i an a I required supporting documentation have been received by the Division. here o��;i bi- hdmmen ed that this certification be sent in a manner that provides proof of rec ipt by the Division. ENGINEER'S CERTIFICATION fi ❑ Partial i abWQ/Surface Water Protection Secti I, Mi eAaie/ T WGresck as a duly registered Professional Engine e t, e a 9 been authorized to observe ([periodically, ❑weekly, ❑full time)the construction of the above refer project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division)Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: : ................................................................................................. : CA9� SEND THIS FORM&SUPPORTING DOCUMENTATION I °m WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS AL ROGER C. EDWARDS SURFACE WATER PROTECTION SUPERVISOR ASHEVILLE REGIONAL OFFICE s0r����m ��\\\v 2090 US HIGHWAY 70 ®®®fld111111\`® SWANNANOA, NC 28778 The Permittee is responsible for tracking all partial certifications up until a final certification is received.Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions.