Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20200798 Ver 1_Attachment F- Impact Figures (RED)_20200616
CHARLOTTE W6TER LITTLE HOPE CREEK BASIN SANITARY SEWER IMPROVEMENTS SEWER PERMIT ` PROPasED SEvvER LOCATION MAP PHASE 1 CHARLOTTE WATER PROJECT 2018000620 BLACK & VEATCH PROJECT 400783 JUNE 2020 0 BLACK&VEATCH Black & Veatch International Company Business —n- No. -794 10925 Devld Teylur Dr— SUIIe'280 CM1arlOtle, North Carolina 26262 C 4-1 . PARK CONSTRUCTION OF NORTH CAROLINA, INC. 416 AIRPORT BOULEVARD NOORISVILLE, NC 27560 a.w1ITT11 ® Ne. INIT11-IN.0 RETOcnnoN.0 M111-nnoN OF PEwnH rvo11 —TP�NENNRNoozmTR eeMDIR NRNNRo12s� ❑ M.DOu�LLeR. weD1112„r ®I-IRN11121 Fr OM' �RDTRweD1112,Dr oRO-1Rw11111211r oRiow orwasrEwnreR 0 .Merv. .corvoos Oo NDUCoM= TIER ooL THER F APRETREATMENT PERMIT 11RE-1RED, HAS ONE BEEN11,ED. ❑YEM ONO NSA 1Z11 ❑rvo R E NE®E RMoEo TNCDEMDME,u rMINIMUM DEM1GNIT. DI—METBYTaIMTE xv soNATURE MD 1EALI GNiFiES THAT i HAKE REViE-D THis MATER11 MD HAKE , TH THE PRoeo ED DEsiON. vORTH CIOLINA P ROFE1110— ENGINEER 11EAR, soNATURE, AND DATE JUDGED IT TO BE corvsisENT •�•� ""• �•r. •,�`�RN CARp� 10142 •r t SEAL _ Hq�� 10192% N� e`• ••' �;S;e ,• aTPERMIT No. guED w�ra,TF—ATTOeATIONRECORDEDBY SHEET LIST TITLE GENERAL SHEETS IT WITH LOCATION NA 11 SHEET LIST AND GENERAL NOTES REVIATIONs. LEGEND. AND SYDBOLS OVERALL SITE PLAN PLAN AND oFILE -STA 1-11 T PROFILE -STA 1 BILL TO STA 17.00 1 PLAN AND PROFILE -ST437—To TAIL SHEETS CML DETAILS -1 10 CML DETAILS-x GENERAL NOTES EROSION CONTROL NOTES BYPASS PUMPING NOTES NOTES SSE EXISTING SANITARY SEWER EasEnIENT UNE FIVE PFRMaNFNT sawTaaysewFR FasewFNT UNF PROPFRTv UNF —RAW M- RIGHT-OF.W.AY LINE LINE 5/L 5/L SECTION LINE ti ❑ ❑ SILT FENCE LINE EXISTING GRADE CONTOUR ---- } FGISTING PIPING 1 CENTERLINE OLE OHE— ELFcrwCAL(Q-1EeD) ----UL----UL— ELECT ICAL(ONDERGI-ND) Tr—rr� RAILROADE—TRACK -T T— TELEPHONE )OIFRHEAD) ----LT----UT— TELEPHONE(UN.ERGROUN.) e ss saNITaRV SEWER —so-11 5TORl DRAIN -----o----ro— UNDERGROUND FIBER GPTIC ---UTP----UTP— UNDERGROUND TELEVISION (G) IN 111�ER ORAGA (G)ry GAS VALVE �(GM� MITER OR 515 M ETER OS Q S-ER OR STORMDRAIN MANHOLE VALVE �) UTILITY POLE.VITH GUY. ANCHOR Yf IIFI HYDRANT 2fY YARD HYDRANT STREET LIGHT PGLF HEDGE, BRUSH, SHRUBS IMOODS ®—®�® EXISTING TREES AND TRUNK DIAMETER, TYPE ]i MK K SPOT ELEVATION GENERALLEGEND DESIGN POINT ® EARTH OR GRADE T.sy,L PERCENT SLOPE W= =W SEDROIK 2.10 STATION GRANULAR HILL (CRUSHED ROCK OR GRAVEL) 3.I SLOPERON NISI 0 SANG c2A CURVE NUMBER 0 AC PAVEMENT x 4562.63 SPOT ELEVATION 0 CONCRETE SURFACE. STREET. R.I. OR DRIVE ENGINEERED FILL RIPRAP SURFACED STREET, ROAD OR DRIVE WITH CURSs CHECKERED PLATE CATCH BASIN BARGRATING(LINES IN DIRECTION OF SPAN) PROPOSED NEW MANHOLE ABANDON IN PLACE -- -- DRAINAGE COURSE OR FLOW LINE DEMOIISHIREMOVAL —32FINISHEGGO—A NT.UR TOP yS.ANKORSLOPE LINES TOP LAID THs(Z SORE HOLE OR TEST HOLE .AND NUMBER SURVEY LINE WITH PI. PT OR POT CONCRFTF FNGASFMENT- PLAN VIEW CULVERT -- } NFw PIPING 111 NEW PIPING IN PROFILE BUILDINGS, STRUCTURES STRUCTURES UNDERGROUND CFUTURFBUIUNNGS, STRUCTURES PENCE CENTERLINE YY FIRE HYDRANT Cfy YARD HYDRANT 0 STREET LIGHT POLE ISSUED FOR PERMITTING - NOT FOR CONSTRUCTION O 4" S5;,t D 7 aQ o0 NEW 36" SEWER \ S3-S4 \ Sheet 5 V [Z:� / sNFP a a Q o cj Q � 00 LD f-)d 0 I� /Ci w1-W2 Sl-S2 Sheet 4 PLT-PPi-SHEET4 ®—.— Black & Veat.h International Company ISSUED FOR PERMITTING - NOT FOR CONSTRUCTION CNA"OvT[ CHARLOTTE WATER WiUTER CHARLOTTE, NORTH CAROLINA LITTLE HOPE CREEK BASIN SANITARY SEWER IMPROVEMENTS lElT.PaoF -� CIVIL OVERALL SITE PLAN .......... — o OB@PROP. ALIGNMENT DTTT BDSAR DR,EK „H.Gs TEE„P QA—L 3301Bo ,00.,B 1p11LL 5011.o AC11OR 38,153 Perennial Stream G - Open Cut Se S1: Temporary Stream Impact land AA - Open Cut Sewer Crossing Permanent Impact (blue) HL _ -• •A ,• I" sILiFEINCE.; , m IP, �V\ 30 If impact S2: Permanent Stream Impact 0.02 ac. impact (conversion to herbaceous, utility line installation) a avPl � " C 10 If impact (riprap stabilization p p ) Temporary Construction Impacts (orange) 0.02 fill for timber r- r ; REOM RGSSING (NOTE 1) �) -MF 1°LF,L,OC _I,L i' a } RB I �il1 ` :` `"� 2B Note 1 ac. (temporary clearing and mats) . OR "DS'4 DIP Sewed PIP, ✓2(96"OIA). �. NOTES' 1. RIP -RAP STREAM BANK STABILIZATION WILL BE NITHEPS AIDE CREEK OR PER ITIHBETI E5H¢E710N..4NTI 2. CONSTRUCT OM INVERT AND FILLETS TO PIP, TO EFFLUENT PIPE. 3. MANHOLE 5 1 SHALL eE PROVIDED WITH A wATERTIGHT LIMITED TO 10 LF PARALLEL WITH BANK. REFER TO SFFP COLLARS SHALL BE INSTATED ON PROVIDE POSITIVE SLOPEIDRAIN.AGE FROM INFLUENT FRAM, AND DOVER WITH GASKET. a. ALL SEAMS SHALL BE EXTERNALLY TAPED ANDIOR s. MANHOLE 5-1 SHALL DE PROVIDED WITH A FULL 6. ERTIGHT PIPE CONNECTIONS SHALL BE PROVIDED OR COMPRESSION TVP, CONNECTOR ,DIN ACCORDANCE 1. ATNE GAIR PRESSURE SEALED. WATERPROOF INTERIORTINING, CONSISTING OF A FLEGIBLE RUBBER BOOT WITH ASTM METHOD FOR CONCRETE SEWER (VACUUM) TEST PRIOR TO BACKFILL s,,N— r ..FI.t / „.BA ,/ ANTI-SEEP (i +'�'--� �� .a .1 `i 5, 9- i I l , 1 P) III. :I_••' k, '�� �`� (1 Iso2wo EN A, Bs, (1zoDIA)::=. —� 5B1a>3 I..✓ '" I I111i II �N 111 �3 b 11I �Q �S(/ e 1, I lalla 2 96 IA C� E CTION I N�-)T�se.zsu� U PERMANENT E ASEMEr;1(rvP PP A VERTICAL SCALE 1 -A ®euc BMck & V..t.h III ISSUED FOR PERMITTING — NOT FOR CONSTRUCTION -MIT VEN T ELEV 596 11op - _ - m oDD 8n qo - -1.5 w3 _ _ _ ALIGNMENT v 0 I II II I I I sfls-�r----ffiL J--- ----- ° _u 5 D G., n°b 36 3s 11PVC- IS- % s IA, eeoa wcL=2e, 21', s4-az°e eL-14 o3eu 570 Perennial Stream A -Open Cut Sewe s 1 1FIRF 1.110 ,,.00 .0 OB 0 11— ,3se 14.00 1411 s.ON ,s+s0 1—D 6s° S3: Temporary Stream Impact 30 If impact I \1 ( f IIII / \ 1// /If M'I 11 '1 ` ♦ /III II_�\\, \.\\\\\3�.` �� _- ---''� CC \ u , I , I I _ _�S4: Permanent Stream Impact lII1iI 1Ii i �� '�/%�P�) �I/�`/ III �I��:.-V s"�\\l �\ ��V�• •\�A\�_`. :'�_ �Y �'= `_ -�-_`,,�,-__——`--'--1 ----- -_ ----_o^_ �-`` 3TOaso i°1�0 If A impact (rip rap stabilization) PssI , o= DL \ --E517752.71 Note i 1oPLAINavv- o PVC SEINER PIPE EXIST ERsEh1NT1(TYP) �� NeE 1 PLD _ 8001 96 _ ` � ��``-\ �i Ex 55n,I H-3B5852 dA"DIA11� SILT EENCE 'ITypl I �Ncu cA rze2o -� \ _ IN 172A9.2ou \ 144NEI 21 R�\1- a� l�a/�o.n4 LITTLE HOPE CREEKS= ` I72 1-1 IT 1 `� _ 23_ _-` ROP6 111-x _ -XIST aEJE EASTNT IT'PI �I_y NOTES ��a 1 / N51;30 / 2"DIA lY� �_i --'' ---_ R -_�� ='E teas_,656jy-5048"DIA? 1.T� ` ���TA,1+�"—�" ` �6 IPE/=o° LIS / 1._ _ �� Op lG .a6�,°3a ie ,° sz �°° r '- .�-.-ss• _ REAM vossi cw 2l _ —� e a-. v l o zl " JP . +�, F 29121 © - - �-;Y, -4- > N _ cONNEcrExls;eRCPss -®'^ Ex 5n(H'i e a1.1 - s 1 ��®a trv1l_ PQ� o \IAo OP ssNwlz ®, ®'' �ryi e Nsn- ��_ �� G O v. v®A_�Q- �-� vv��`v�,,h2�?u',PRGPssMH,aoz'•Dwl_��. FO m v ` ��"�„63 �s m o\� E"- US z����� E7LE"T'I'P.RN GL s mcTlDNmP,GRRmON sTRNCTIGN 1 1vP . - Y 'TM� - „ate aN N\/T\\EA n1ENT\ GENERAL NOTESPP2 CNAALOTT[ ,. ABANDONExISTINISEI'F AFTER ACTIIATIONOFNFI„sElEB. W�yTER 2. RIP RAP STREAM BANK STABILIZATION WILL BE LIMITED TO 10 LE PARALLEL WITH BANK. REFER ® [LAC¢ NV6'ATCN ETAIL BHEET 13 FDR CIEegDITDH STaeILIIATION. ANTI -SEEP CGLLABS SHALL BE VERTICAL SCALE , 4 INSTALLEDSIBTALLED ON EITHER SIDE OF CREEK BED PER DETAIL EiSHEET II. 40' 20' 0 40' S' Black&V.-I, International Com P-y g00Te3 3. CUT . AND PLUG EXISTING RCP IS AT STREAM BANKS AND REMOVE PIPE FROM STREAM BED. 26rneens =2= y ISSUED FOR PERMITTING — NOT FOR CONSTRUCTION E Ca3 P ALIGNMENT Hi -- ' —__ �� II II II __ _—__ 21 TIIP, ______ - _____ ______ ------ ------ _____ ------ --yr-- <DTAL eaa.as -- za•oIA,L=zss.ss S=o.az^,� - --- ----- - ------ ----- -- as• FA, 0900 Pvc L= 2DO S_o59% as x - �.`— oR R "1 575 P sT TTESEMENT (ITOVNP)PERMANENT EASEMENT IVI -I v SILT FENCE ° Ve �T° -- ��/: (rvP) " asm-sOzOIA) '�w ° RaP s H', vaE�PE Q - Zn„E rvo zeros Epee _'A i.11 ,_x ozDIAI i=�nz„o.szsol N�/ �'= SRi<asoza.2. DIAI p=r'- - ze` �e1/s".s11 / 9 EB / �3}b6 I ii��'/' ° aaov ssn•H9 \\)N� l/i °/- _' 4 II T _ = Z� "I rvs,szse.sz la csz•DIAI \ /'�Fs �;,\��\ ,,``��-� �,' �►a�-�o9as=T��,E °'ii i� �4 `ooe" � / 10ova FL000P \,,, ' �� 'lo Isms; � m x °roR�oao°Elo, ��"/;�-=�?�•: ��\J.. e_ ���" ��P �`a� � � � �`s / .�./'�',^/ LmL�r,D azzad� == e zxzxs- � a' -22 �D�:�t e.�,,,6 I pes a ✓—���se� v_ I i TSE,IEREASEMENTITVPI ------- : m o /.`� I� !R, ��s—� ' 5184s.3ax<<sDl =,,, I \� • =-•v. _�_.'g�° � 5914ss xa:o�T„,/''�/ - ,Jeaoa �rvoTE�g` ➢0 `\ \\ � �.� ��. �� - w � � s P /- •Q �� e �`� i � oTi, 'y\�// �I I ti `,'� `�af7' � ��0�\�. EV BBMIl-19ss <a°olA ✓��:-zi��\ Lei i 'a //"�•T �\ GENERAL NOTESPP3 1. ASANOON E111TINO SEyVEa AFTER ACTIVATION OF rvEll-EWER. 4 0 4 r . RIPRAP STREAM BANK STABILI2ATION WILL BE LIMITED TO 10 LF PARALLEL WITH BANK. REFER ®fiLACI[ •V6ATCf1 TO ETAIL IS— 13 FOR CIEEUIOITCH ST1111I2ATION. ANTI -SEEP COLLARS SHALL SE VERTICAL SCALE 1 4 INSTALLED ON EITHER SIDE OF CREEK BED PER DETAIL EISHEET 11. Black & V.-I, International Com P-y So 1. CUT AND PLUG EXISTING RCP IS AT STREAM BANKS AND REMOVE PIPE FROM STREAM BED. rneexs =zezcz CR ISSUED FOR PERMITTING - NOT FOR CONSTRUCTION GJFI 610 C LA 100 YEAR FLOOD FIT IF _=- -Dog--- -- ADE .ALIGNMENT I IT „ ---- ------ - sos ----- DArr- 4•mAL=zasT3, -0se" -- ses -- +i-ozss�, s=n nose -- ------ Do, L= --- ---- ------ .77 s-o47% o 95ti - ----- - •mAcsooPVC L=zeaas.s= Dwc000 PVC, L=zss 51 3--7.-7 sPLC = sr.B-F57o s 1-17F Perennial Stream C - Open Cut Sewer Crossing and Permanent Stream Crossing /„'; '\ . `---- S5: Permanent Stream Crossing - 20 If impact (armorflex) °22P° z i i cRoSSINO T � 9, ss _ IF S6: Temporary Construction Disturbance � '�Ik „ 'r�-- - OrezNOEaIEA I/,I ;,� ,`' _OnIT L°F1 A -34Ifimpact ms esl-1e0aDIA) —9. Note 5 �14`71 11 r cs D zsPVCSE„ E I _ 3 -- All I 1 � E� INTO PROPPMIT113' III ` I MT PERMANENT eASen,FNT FYI) _ _ XDIL s N�,z1zo AVITENIIIIX a®,s,oLILI, rl-� �. .��`.<� C L zsz°s{,',A 4LI s 4 L// s _ •m. ,.':. e' -RELOCATE ss��wEo�EwozO OR zaz,° + / a xa� s . PL _ �. -T _ 4�Rj^ � w E�y NT mP A Po o RucrioN 0 y T CONS • ITcP ''-� r zz� .�m"A E - I T��; - 2 r .. � o , � ' � � .:�'/ / /o��w ITvvl� i �x ` r �.ss.ee �' w \.\ ns r r� -_ -� G av 4 PssMH 1-1:, nz olAl�"oP Q py a sroa�- xv ��- y m 93,;"p,°T a NT ITT PI a iy_.°° <nw `Ro4„ xS M1RY sB DIAI '_`"°Ia,9 x�SSq2> iLre�I ea3�s s s s4sn.,00zDIAY__ sT _'- �= '�A�'�\``�`'•�•��� ``ae. II� -�,4nzO,•Dlal- "_'vEqc_ .12 1445P 1, ,ALLEY STREAM RD �,`,',,�,l\�i��;' GENERAL NOTESFP4 \ y , LNAfI14TT[ CHARLOTTE WATER 1. AEANooNExISTINasEI'IERAFTERACTIVATION OFNCI„sEv,ER. 4 0 4 1 WATER z. RIP RAP STREAM BANK ST.AEIubATION WILL BE LIMITED To 10 LF PARALLEL WITH BANK. REFER CHARLOTTE, NORTH CAROLINA TO FTAIL SISHEFT 13 FOR CREFI RI LOH STaMM2ATION. ANTI -SEEP COLLARS SHALL eE VERTICAL SCALE , 4 INSTALLED ON EITHER SIDE OF CREEK BED PER DETAIL ESHEET 11. Black&Ve Mh Intern X[io oal�Com B-y s.CUT .AND PLUG EXISTING RCP IS AT STREAM B.ANKs AND REMOVE PIPE FROM STREAM BED.Do m6 DZd m. ,b,as LITTLE HOPE CREEK BASIN HORizONTALSCALE 1 4o SANITARY SEWER IMPROVEMENTS 4. REMOVE AND REPLACE EXISTING FENCE WITH SAME MATERIAL NEEDED. CLOSING PER RETAIL.SHEET 11 •CILL. of - ARMORFLEx MArrREss oR Eouni�cRosslrvc w �L BE A MAxIMUM of So -FEET AIDE - CD P PLAN AND PROFILE STA 27+00 TO STA 37+00 ISSUED FOR PERMITTING — NOT FOR CONSTRUCTION !I 1 1 G IA \ I 1 I I 6 ' os 1 — Lo 06, ic°R 1°g1�121 \PROP SSMH9115(72"DIA)� 2oJ i712°C ° SIK° r� — �,4di99.6-6 y ��J[(\I ,II1 v\86a4 4s"D ). \oallS111212 IRT FIG Nc -c1 \-----°P ZL �a------ DA ��xlsr z4•'R `\v ' -,�---- A _ 1112112 �- ;, z - mPl 1 � e' ° ---° _, ✓TA _'- "ads„ - mP),-_ PER GENERAL NOTES' ,. ABANDON EXISTING SEWER AFTER ACTIVATION OF NEV)S-ER. . RIP RAP STREAM BANK STASILI2ATION WILL BE LIMITED TO 10 LF PARALLEL WITH BANK. REFER TO11TA! ASHEET,3 FOR C—AlITCH STABILIZATION. ANTI -SEEP COLLAR5 SHALL BF VERTICAL SCALE,4 INSTALLED ON EITHER SIDE OF CREEK BED PER DETAIL EiSHEET 11. Fo 3. CDT AND PLUG EXISTING ROD IS AT STREAM BANKS AND REMOVE PIPE FROM STREAM BED. 4. REMOVE AND REPLACE EXISTING FENCE WITH CAME MATERIAL NEEDED. HORIZONTAL SCALE , =40 PROTFCT —TING RETAINING IAIALL AND STEPS as ISSUED FOR PERMITTING - NOT FOR CONSTRUCTION CNA"OTT[ CHARLOTTE WATER WATER CHARLOTTE, NORTH CAROLINA LITTLE HOPE CREEK BASIN SANITARY SEWER IMPROVEMENTS PROF - CIVIL PLAN AND PROFILE —1ILT VIA STA 37+00 TO STA 44+00 o _L --E.— H— —H IPE 1,2 R —IR F AME —L —FORM TO DII%�l L=R7AT—= E 4 F.E —LLp.MZM5T`VIllE—.M --E—. a. F.—Rl a M— —1. —M F.—I Rl. tea, 1— F.—I MI —1 1— —M - --------------- 2 M—, T.LE—E 11. T.LE—E MIM., MIM. T.LE—E 121 MIM. T.LE—E MIM., MIM. T.LE—E —ERIAL M6 —ERIAL =EA.—�--E I'm MIM. T.LE—E .TERIAL M6 0 `All`l—ZM5TI�EM—M — — RE—REME— I FRAIIE —L �E F R—D. —lZT.TM% r. DI.EM—M RE—R-- T. 1— U-1— FRAIIE —L �E IT F R.U— I-- —E F E —L U-1— F.E —L ��TFOR%TO o--OM RE.UIREME—. CHAYIOTM CHARLOTTE WATER ftTER CHARLOTTE, NORTH CAROLINA Black & V.-h p-y 1 Dd =2 LITTLE HOPE CREEK BASIN Z' 7 SANITARY SEWER IMPROVEMENTS lElT. CIVIL CIVIL DETAILS Al �11LT ISSUED FOR PERMITTING - NOT FOR CONSTRUCTION X," v t GEQTEXTILE FABRIC (SEE NOT E SPRING LINE FUVXTONE ILlcli, TIME WELL ....... TT" ALF .1 HIRE PPEGRADE E NOTE I I NOTES 1 M�' 7 1-01 TIENCIRS DEQUI111O C101111 AND BRACING, SHALL BE TAKEN FROM THE INSIDE FACE OF THE L'HOPING ANN L.E% I AN LARGER TO BE USED IN TOO I- OF INITIAL 11FIFILL AND NONE 3 ED URGERIN . Do SCAUS OR 1. FINAL NITAIIIL S11LL BE SUITABLE NATNE MATERIAL. 1. 1111FILLITILL BE COMPACTED IN I- LIFTS IN TRAFFIC AREAS IF F-D-TRAF-A-AS. TOTAL FENCFGUATFX,.LAE 'L T' MINIMUM OF 6. ACHIEVE 91R COMPACTION IN BEDDING FAUN'C'HjN1"M-DIPjp7IAL BACRIFILL. SEE TECHNICAL SPECIFICATION SECTIO 02315 FOR COMPACTION REQUIREMENTS IN FINAL BACKFILL. 7. IF IN AN 1. �.N=T�HILTL'IPT'11'1'ILEMETHODS2' S.ELEC FILLISIEGI.OEB. NECESSARY E ,E A FOLITCAVING EXTRACTION OF TRENCH BOX ANIGO ITO 1AINTAIN A FULL 1' OF STONE CIP1 THE PHE S NEET`NG g CONTRACTOR SHALL ENSURE FINE C011LIDGEIFINTS ARE NOT DEFLECTED WHEN TFOO PIPES ARE JOINED. 10. STINE BEDDING SHALL BE PC— ENCLOSED IN TYPE A FILTER FABRIC. FOR ENTIRE LENGTH OF FIBERGLASS REINFORCED PIPE. 11. II NIT ILIlF AND COMPACT DED11- TO 11 OF THE TOTAL FEELING THIIUNF. F1 PLACE THE REMAINING BEDDING MATERIAL To ACHIEVE A UNKCRU! SOFT CUSHION IN AGLICH TO SEE THE PIPE INVERT. TYPICAL TRENCH DETAIL NO SCALE N.—Al I.R— IMW .- ------------ EA- .1.. T.HENAWE N, NS F El CT S7 D�,D .1 AT INC. . I.RI-ER A-E E T —FORMATO FM.0M RE—REWE TD, DISCHARGE ONTO F SEWATEI.NG PUMP HOLE STABLE RI NEAR DAN TO FIFIENT IF— -777�� ..... INTAKE NIKE, MEDa LOSE DOLE WATER 7), -------- E`4 L--------- ---------- TRAGER WIRE FOR GR1TY WHO DEEPER HDAN 8 IT IRE— RDMIL A v.1 .... ... .... ..... PROVIDE HIGH STRENGTH BoU BLESTIT HADT FFPE BE AIDS UPMBECRENGPOSTIIPPIUG F H EAVY SULD' FOR HOLDING HOSE IN PLACE "PH" FIRTEAS WATER FLOW FROM PON, HE TO 1�``PEEP PIC'I'TLD.A.ETER, T" 'PENN' To AC'o"MDATE UP T-4NUU DISCHARDE F.SE 4G"GA7U .. 'LA""N7 1A4N THICK N.-T NO. 11 ST.GE1 1. SAIDIIG Ill S SHALL BE SITUATED AT THE UPSTREAM All IOUNNSTREA1 ENDS 01 THE ANGII AREA Ill STREAM FLoSjIPAHALL BE PRIDE ROUND THE'GF AREA. THE PUNIP SHOULD DISCHARGE ONTO A STABLE IELOGPI ' A DISSIPATED TED CONSTRUCTED UP EPAp UK SANDEAC, 1. WATER TEAM THE *"' AREA IN ILL 11 ILMPED To A SEDIMENT FILTERING NEASU OR I-H AS A SEDIMENT BAG OR GTHEI APPROVED E,10E THE 'BEASURE HILL BE LOCATED OU SUCH THAT THE BACK INTO THE I=LTIE'TBHAE ll*11T1EARI DAN.EIG DIKE _= CAUSING FURTHER BETWEEN THE B C AND THE STREANIB TEMPORARY PUMP AROUND NO SCALE ISSUED FOR PERMITTING - NOT FOR CONSTRUCTION 1. CoNTRACTOR SHALL 512E DEWATERING BIG SASERD ON FLOW CONDITIONS AND IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS 2 A: FLOW `,�GM HEUP XTETHN..lDTETRILL1.AA1E01 FOOITSEIEN GTGTRERIPIIY WITH AEMilHAN5GFCTokI F A 0 111A S. U 111 FEET PER SIDE. C ALL 'T"CTUR AT A"LL BE IANIDI WITH I DOUBLESTITCH USING I DOUBLE NEEDLE MACHINE HIGH STRENGTH THREAD. 5 T HE SEAM STRENGTH SHALL"'THST .. L''IN USING AITMC 111TESTMATHAD. 1. THEGEOT ITHE FABRIC SHALL BE I IF AM N.NISVAEN 'ALD'U. 7 DISCHARGE F DEIVATERAUG BAG SHALL BE DIRECTED SUCH THAT PRE -DISTURBANCE HYDROLOGY IS NOT CHANGED. SECURE DR'A'=S_U PLACE FTSCE OF STREAM CHANNEL V)ITH STAKES AND ROPE TO AVOID RHATING. DEWIATERING BAG DETAIL No sc��L E EROSION AND SEDIMENT CONTROL GENERAL NOTES 1. HE CONTRACTOR AH.ILI TAKE ALL PRECAUTIONS TO AVOID THE SILTWG OF STREAMS, LAKES,O CONSTRUCTION OF THIS PROJECT. EOSION ANDISEDIMENT CONTROL MEASURACONFORM TO THE GUIDELINES DEiFORTH IN THE NORTH CARDLINA EROSION ANO SEDIMENT CONTROL PLANNING AND SIGN MARNUAL. r ACroR MAINTAIN ALL EROSION AND seomlENrcoNTROL Deuces IN I GOOD STATE OF REPAIR UNTIL THEIR USE IS NO LDNGER WARRANTED AT THIS TIME THE MNTROL DEVICES SHALL BE REMOVED AND DISPOSED OF SO AS To CAUSE NO STRE SI SHALL RFFER TO ECIROATICNS FOR A DEBC11— OF THE I IN ED "BUR IRE ARAT..N o SEELEDTHIS PROJECT. TION RATES, AND MULCHING REQUIRED FOR ALL EXCAVATED AREAS IN — METAL FENCE POST EASE C COMPACTED N1 I I q I I I I I I I I I I I I I I 2 oBICP IJTEEA FA IN FU OF eAaUAa WHEN AIOSFESCP IS TO BE USFD a3. NATION PENCE IS CANED PITHONGTHE PLANS, OF FENCE. PENCE PRIOR ANYC DISTURBING ACTIVITIES. CONSTRUCTION FENCE SHALL BE COMPOSED T J'I GH. SEEP STELrE uTI REI TO SUPPORT THE CONSTRUCTION FENCE AT tD' SPACING. METAL PIITIIHIULI FASTENED TO THE ASTIc CAP FOR SAFETY. CONSTRUCTION FENCE SHALL BE SECURELY TOP D MIDDLE, AN BOTTOM of EACH POST. SILT FENCENIT TV IIALE CONSTRUCTION SEQUENCE 1. OBTAIN ILL LICABLE PERMITS AND VERIFY REQUIRED TO RE DISPLAYED ONSRE ARE AVAILABLE. OBTAIN OFFSRE PERMITsuwoN APPLICABLE AND PROVIDE COPIES TO s a11Ervo PRE-CONSTRUC ION CONFERENCE PRIOR TO STARTING CON 3. INSTALL TEMPORARY CONSTRUCTION ENTRANCE HOWN ON THE DRAWIINGDS AND AT IDLL N8TlUQTIQN EAREAS GRACES A PROTECTION AND SEDIMENT TRAAPS, BARAS HALF -RING 5BEGIN CLEARING GRADING. TRENCHING, AND ACKFILLING. A. INSPECT ALL SEDIMENT CONTROL DEVICES NEEDED PAIRS SHALL BE MARE IMMEDIATELY, COMPLETE I, CHING AND RACKNITING TO e IEDNISH IMENTE TRAPS SHALL BE CLEANED OUT WH EN HE STORAGE CAPACITY HIEBEEN SDh FILLED. SEDIMENT SHALL BE REMOVED FROM SILT FENCER WHEN 17 BECOMES FA FEET FEET FEDEP. 9 DISTURBED. AREAS SHALL BE STABILIZED AS SOON AS POSSIBLE, DAYS AFTER NOT MORE IESAEOTTVITIID COMPLETED. ANY A IN WjRICH CONSTRUCTION ACTIVITIES. L eE P DEDDED WITH TCEMPORANE sEEOWc. AL I TNz AaUIESToeAEACiea INIII RB N TvivEAT E 1ILL TEMPINIII eaosioN looNTRESTABLISHED � MEASURES SHALL BE REMOVED. 0 NS]OR us ,IRVIED sroNE 60 0 S(o SlS` HAND,ARECLOTHBY 12INCMS B ogo 80 1+I STEEL FENCE PIS" `WIRE FENCE ON IEEE FENCE ON A SILT FENCE FABRIC TRE FENCLITH STEEL FENCE POST E HARDWARE �LaTH PLAN VIEW yI E SILT FENCE OUTLETS ONLY WHEN STONE R.AINAGE AREA DOES NOT EXCEED il4 ACRE AND RE IS A LOW AREA. USE AS A REPAIR NI DIRECTION OF SILT FENCE FAILURES. „lI KE9 lLH 6 G HARDWARE OLGTH MAxIMUM 2a"o PART OIREFENCE F SIDE VEW JL ivm CALIFORNIA BEARING RATIO TEST LOA /IroDiaio ev zi 3i 2D 1s ii �c L1111 of o DreaHaaL reon: re.DE ,.ND B—L of Or nreuaanv `/ / A 1 s rernc eixoe ` /// /III/ U IL W. luau so vno 1 � s r r�l unxiuuu s�wE aN aam � \ r ow IDTATEaun� sISIIIFLK °P/ a swv E DE ACP All „DOLT FRONT VIEW SILT FENCE FABRIC I INCHES INTO THE TRENCH SEDIMENT FENCE OUTLET �D� PERMANENT STREAM CROSSINGNOT TO SCALE " 1 " STAINLESS LIFTING UNIT STEELTH ROD WITH OW REARED ANTESEEP COLLARS SHALL BE PLACED AND NUTSABHEAT THELVER UTILITY LINE GRADIENT s MIN ENETLAND NO THE UTILITY DARI LINED - aDIENPUNUIP THE UTILITY EIISTS THE EVETLkNU AREA. UTSIDEOFTHEPIPAL TESHACONSIST 11111 KIDDER ET WITH 11 NDING x2OPADDING MUM INCE EONI THE 41DTH OF THE .ANTI -SEEP COLLAR TO PREVENT NCRETE FROM CONTACTINGG PIPE SURIICE. BE SMIOOTH'NTERIOR SURFACE SHALL al Ia . II ""RE ANTI-SEEP COLLARNO SCALE TRENCHA SITY THE TIE END IF THE IATA IN A A NCHEs OR MORE IN DEPTH. I TAMP THE TIEN 'H FILL IF SO El I a IN CHES DONM FROM TH E FREN CH. OF STAPLE.C. OVERLAPA AING AT UPPER END OF LONERSTRIP AS ND B OVERLAP END \ti//✓/ LT "I ( ZI 61/2" FLEL D CHECK SLOT FOLD OF MATTING BURIED IF, FOUFLE Row OF STAPLES. SLIT FEEL R NCH AND TAMPED VW W0 GAUGE WIRE OTAPLE�z. W PREED wro THEoIL vz" i PRESS ENDS OF MATTING 4 NCHES INTO THE SOIL NOTES ARouNDSTRUCTURE, AND STAPLE SECUREL,. L MATTING FOR EROSION CONTROL SHALL DE LUTE MATTING OR DICELSIOR MATTNG. z. MATTING SHALL BE INSTALLED WHERE REQUIRED TO STABILIZE CHANNELS .AND SLOPE. DETAIL FOR STABILIZING CHANNELS AND SLOPES WITH EROSION CONTROL MATTING /-71 ElE I P EVENT IXOELSI011 YMTTLE Ol��E wTrlxa aLOPE ONNN EµII roOILLONAN. oNO TT% Z`NI1MM!;TMlZT%F NI ol IS INSET A E.ET B STIP(EPE— S SLOPE FLAY — ..e TTINO TOP VIEW WATTLE DETAIL SILT FENCE ON PAVEMENT NO sC.ILE CONSTRUCTION ENTRANCENO SCALE To"RE ICR IN MPL �ClI.GNi w,irz oa[NiNos A. 1 � N PNL SECTION PLAN VIEW BLOCK AND GRAVEL INLET PROTECTION �1 NO ESALE Kin In SiArv0I40 �OiTAIi STANDARD OUTSIDE DROP MANHOLENOT TO SCALE 2MUMLw—a.m.o a,o I- uwmwx .IXACN�[ [ vwMKM CVY�fY..m I ON s R[Y[C� Vlrwrt v�inar � f � YA,Wi� TIMBER MAT FOR WETLAND CROSSINGNOT TO SO ALE NDIEV O A NCHOP HIGH PERFORMANCE TURF REINFORCEMENT MAT RE SHOWN IN DETAIL F (THIS SHEET) O HIGH PERFORMANCE TURF REINFORCEMENT MAT, P—MAT 7N By PROPER PER OR EQUAL, WITH LIVE STAKING AS SHOWN IN RETAIL F (THIS SHEET) A ZA A ZONE E (UPLANONE D ZONE) ZONE FILTER FABRIC. MIFAFI OR EQUAL q) CLASS RIP RAP 11 THICK WITH joNT PLANTING A, SHOWN IN AT D DETAIL (THIS SHEET) O ALONG RAP PLACEMENT MUST BE LIMITED TO A WIDTH OF 10-F STREAMEANKS, CENTERED ON 7VE SANITHAN'TH"'I',BF1 APPROX TOP CROSSING. AESJL�FEI ED F A OF STREAM BANK RED, NORMAL WATER LEVEL SCOUR LINE IT 2', MIN 3 A E�MIND BEYOND FAIBRICAP STREAM BANK RESTORATION NOT TO SGANE 11—LIETAD PLANT Al-N I IEEK BED IN JOINT PLANTING (IN RIP RAP) r7-,\ NOT TO SCAL�— INSTALL HIGH PERFORMANCE HUFF FEINFORCEMENT NAT OVER SEED FEE PLANTING FOR 11HEI LE GO F ECTABLFRIALMATPoANN ANCLASEN L, N 3.�TALL SPLIT 2 N 4 N HEAD 'T"T 'TAKEI p El .. GI F PAT ON A OF A TAPH, PER MANUFACTURERS NPOU FEMPN'A PLANTING TO TOP LIVE ly�S.��KE (IN EARTH) N M . A IIIATNI TIP ME PARK 2 J— N' FINE GINTGII—N NAT INSTALL SPLIT 2� N 4 N DEAD ""T ' TAKE A A El Ep'C IF CAT N C 0, CTA PL, PER MANUFACTURERS PERU OPMANTS TURF REINFORCEMENT MAT ANCHOR DETAIL �- �F NOT TO SCALE IGIAHNI T1111 SNI IRNFLATIA SANITARY SEWER RIP RAP 24 THICK (�`E HUPLANTING A G 'To WIN F D (THIS SHEET) ZONE A HIGH PERFORMANCE EGSHN� TURF PENFORCEMENT RF AINK MAT WTH LIVE AT DETAIL OF A A (THIS OW CON N) HE TA TH FEE T EA�AHNG THEE1 ANI —ETATINN N ZONE B ILL NIIN IF IGHBRILE ZONE B • N'l PtNH ZONE , A IT MINIMUM A NANLN POILE ZONE C A RE E�W CREEK —FERTILE PLAN VIEW SPACING PATTERN FOR LIVE STAKING AND JOINT PLANTING NOTTOICALE PLAN VIEW OF RIP RAP PLACEMENT LIMITS NOT TO SC ALE A M OF A A FA A PAIIAN L111 F NLANTNO A.—N NAGS OOTANAAL PAGE T "A '."N "'A GCHNIHINNI G&AHFN L'AP"H" PZlYF. ,AN, IPAIINA A—MPICAL NAll SHNIFILl A� N'� ' '� C RE A Z� TIL�L Z :N I (UPLAND —1 1 IFICA Al Ull 21 11 1 2 -1 IFFITNOI DO HUNIANO 11-11 'N I CABILINOO INNIANO 11-11 OAL, 11 UPPL— ILOA 11G.NA HDANI'LANT1 IAIILL oLINA 1, .1—FIN 1111 31, R�N �LINN'OPL`�"—NUFKAA I N �N G� UP A�`N NHAlp— T'AE Z�� UGHGR I —LIANA IK —1AIT IT— .11T Al DIF G-1 11 I'll / A 11 A � / E A 3 IN FILL IIN / PIAT GY111 FAA ClO.Nl =l'I'N�"N 'U�VN ZIA— `T'�N�'ll IN TO Ol LA, AND_ _G . ........ I PA I N CA Al DIF 1ARIN- I—INFIG A GIN GOIATIT De DIF�sNs OlO.N' AT euEHCHr�n —1. LHGAHUI E-1— DO N �'—CCM IIN GO 1AAAl 1� I ITT IN) .1— "U'l KNUIR—N — �F KD IIN A' -AM' I I THAT11 .11 11 COUNIVIA111 AYATI FRAIll AAALIONA CHIGINGL; ELIGIF III GAHE K011 UJAPUG 31 1 �1. /'I'l .1.11UI ININAININ'l,1,13 11 11L) ""IN TO ZONE A '�` AN I 1.' -1 EUPPER ILCPQ AAlll OAK —1111 NOW 31 GN NO , -11 —1 - UPPE AP-1 — A'A' — I'�'L�INA:N�'."'L�L.D-,TIAN�'�'I'LANIP 1) 11-111N 1111 AGOIDAN H�- ILIA —GA 11 GIN INNIAPT IYAll Wl NO 11F AHIRNI 1.1 1 11-11 -1 IFFILINCI KI HUNIANO 11-11 GAL) R 1111 Y— PARGAT. -111 OFF IFFILING1 PH 1UNIANG1 (3-11 HAPPIPLAN11 GAILF IC HA Ol IZA 'FIT INNA� ANN11111A BlAll 111 11111- KPOO- ZONE C RICUIR11 IHIUZ �TA'= Z' LIN'NS"A RIN I TON H L,GT T N A FAA M—NA Y HNI NOTE, OFFER 11 1111 AT G�FAN I'll IDA lAV/lLANTl AART= I N'TAL' FF, AN, FFITIl THA ISSUED FOR PERMITTING - NOT FOR CONSTRUCTION PLANTING SCHEDULE RIPARIAN 20ME (PIEDMONT HEIIAN) GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGOI CONSTRUCTION GENERAL PERMIT Implementingthe detail sand spedfimtiAns An this plan sheet will result in the ..stmction activity being consdeed compliant with the Ground Stabilization and Materials Handling secti.... f the NCG01 Constmction General Permit(Section, E and F, respectively(. The permi flee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and spedfimtions shown on this sheet may not apply depending on ste conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize vvithin this Site Area Description many calendar days after ceasing Timeframevariations land disturbance (a( Perimeter dikes, scales, ditches, and Z None perimeter slopes (b( High Quality Water ( HQW ( Zones Z None (c( Slopes steeper than 31 Z If, Apes are 10' or less i n length and a re not steeper than 2:1, 14 days are allowed -Z days for slopes greater than 50' in length and with slopes steeper than 4:1 (d( Slopes 3:1 to 4:1 14 -Z days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls La ke Watershed days for perimeter dikes, swa les, (e( Areas with slopes la fler than 4:1 14 ditches, perim eter slopes and HQW Zones -10 days for Falls Lake Watershed unless thereiszero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to perms ent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against a -le ero son until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilizethe ground suffidentlyso that rain will not dislodge the soil. Use one ofthe techniques in the table below: *Ompgr+ mbo.mm al 'd-1,crr.w e[ •P.am.Mnt pnf-0cawr.0 .i era.t�u... pfher rnukhe. and tac.iF:rva •F,dm»Mi.. •6-16 F.b ,ruhnprm•niu son •paNtd.pypn [entroi ptdrn.•nn er eHfwmment nuttlq .WlAekt xmp.rary pats . Sh"teleedK •Atmrem+at.kappW ur-rx.he rotr mukn •ShruhsorwmrPermarcnr olaminw_acworeu •Plaukr tl. rcn-kh • U=aMe nk detMuted u.nd corer a ft"m to rntraInaro- . S'fl-1 .1 ou-N. uOMrcer net W.,w.11a .i Wlad.rm.on meardPaMacts POLYACRYLAM I DES (PAMS) AND FLOCCULANTS 1. Selectflo¢u lants that are appropriate for the soi is being exposed du ring constru ction, se leng from the N DWR List ofAppmved PAMS/Floccut.r. 2. Apply flocou lantsa t or b efore the inl et to E ro so n and Se dim ent Co ntrol Mea so re s. 3. Apply flocou lantsa t the one ntrati on spedfi ed in the N DWR List of Approved PAMSIftocc to I nd in aarordan ewith the manu factu rer's instructi on s. 4. Provi de ponding area for onta inm ert of treated Ste rm water b efore discharging offste. 5. Store flocou Iants i n leak -pro of containers that are kept u ruder stormtesstant rover or sur unded by secondary ontai nment structures EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain ehides and equipment to prevent discharge offluids. 2. Provide dripunder an gored e u ent. pans y q ipm 3. Identify leaksand repair as soon as feasible, or remove leaking equipment from the project 4. Collect all spent fluids, store in separate ontainers and properly dispose as hazardou-aste (recyde when possible(. 5. Remove leaking ehides and onstru tion equipment hour service until the problem has been corrected. 6. Bring u sed fuels, lubricants,Coolants, hydraulic fluids and other petroleum products to a recyding or disposal center that handlesthese materials LITTER, BUILDING MATERIALAND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and we of waste ontainers(e.g dumpster, trash ceptade) on ste to contain construction and domestic wastes. 3. Locate waste ontainersat least 50 feetaway from storm drain inletsand so rfae .atersunlessno other altemativesare reasonably available. 4. Locate waste ontainerson areasthat do not receive substantial amountsofmnoff from upland areasand does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers 6. Anchor all lightweight items in waste containers during times ofhigh winds. Z. Empty waste containers as needed to prevent overflow. Clean up immediately if ontainers overflow. 8. Dispose waste off- site at an approved disposal fadlity. 9. On business days, dean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and otherliquid waste into storm drains, streams or wetlands 2 Locatepaintwash0 is at l east 50 feet away from storm drain inlets and so rfae waters unless no other alternatives are reasonably available. 3. Contain liquid wastesin a controlled area. 4. Containment mu st be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps,solvents, detergents and other liquid wastes bom onstruction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feetaway from storm drains, streams or wetlands unlessthere is no alternative reasonably available. If50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place n a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during period s of high winds or in high foot traffic areas 3. M onitor portable toilets for leaking and properly dispose of any leaked no aterial. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT n1. Store and apply herbicdes, pestiddesand rodentiddesin acoordanewith label restrictions. 1. Show stodkpile locationson plans Locate earthen+naterial stodkpile areasatleast 2. Store herbicides, pestiddesand rodentiddesin their original ontainers,ith the 50 feet away from storm drain inlets, sediment basins, perimeter sedimentco ntrol, label, which lists directions for use, ingredients and fi rst aid steps in case of and surface waters unless it can be shown no other altemative, are reasonably ka-Identzl poi soning. vailable. 3. Do not store herbicdes, pestiddes and rodentiddes in areas where flooding is 2. Protect sbAkpile with silt fence installed along toe of slope with a noinimum offset of possible or where they may spill or leak into Wells, stormwater drains, gro and water five feet from the toe of stodkpile. or surface water. Ifa spill Acours, clean area immediately. 3. Provide stable stone a,,ess point when feasible. 4. Do not stodkpile these materials onsite. 4. Stabil oe stodkpile within the timefiames provided on this sheet and in a,,ordance with the approved plan and any additional requirements. Soil stabilization is defined ,vegetative, physical or chemical coverage tech niques that will restrain acoelerated HAZARDOUSAND TOXIC WASTE eroson on disturbed soilsfor temporary or permanent control needs 1. Create designated hazardouswaste collection areas on-ste. 2. Place hazardous-ste containers underco condary containment. 3. Do not store hazardouschennials, dmm sor bagged materials directly on the ground. ��-o e „a 11 •eta CONCRETE WASHOUTS 1. Do not discharge onrete or cement slurry from the ste. 2. Dispose of, or recycle settled, hardened con rete resdue in accordance with local and state solid waste regulations and at an approved fadli y. 3. Manage washout from mortar mixers in a"ordan ewith the above item and in addition place the mixer and assodated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact you r app royal authority for and approval. If local standard detail sa re not avail aid e, use one of the two type of tem po rary concrete wash on is provi ded on this detail. 5. Do not use mnuete washoutsfor dewatering or storing defective curb or sdewalk sections. Stormwater acmmulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project 6. Locate washoutsat least 50 feetfrom storm drain inlets and surface waters unless it an be shown that no other alternatives are reasonably available. Atannnu'nor install protection of storm drain inleas(dosestto the washout,hich could receive spillsor overflow. Z. Locate- shou is in an eras ly a-ssibla area, on level gro u nd and instal l a stone entrance pad in front of the washout Additional controls may be required by the approving authority. 8. Install at least one sign directing mnuete trucks to the washout within the project limits. Post signage 0nthe washout itselfto identify this location. 9. Remove leavings from the washout when at approximately 75%capacity to limit verflow events. Repla a the tarp, sand bags or other temporary structural omponentswhen no longer functional. When utilizing altemative or proprietary produ Cts, follow manu fa c[urei' s instmctions 10. At the completion of the mnuete work, remove remaining leavings and dispose of in n approved disposal fadlity. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout NCGOI GROUND STABILIZATION AND MATERIALS HANDLING I EFFECTIVE: 04/01/19 1 ISSUED FOR PERMITTING - NOT FOR CONSTRUCTION PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety ofthe inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greaterthan 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. [ ereque say usspece (a.nel normal IRryepaen raserda mull kneMdr: hpfen n �� [tjaainHWo caiy U yrainfallamouinc aalMained In If no fans rain l.�a paerv.[aana arc maep duranl w mod a, Rwdwarhim, halldar pcnlosf, and np indbkwl-0ay talnlall m pan in n,der iubir, retard the rumuhhive m for Iho,r um ahwdod caul lane vua wit d"t.l If a Wu impo w. Is neen")• Pays on wh" no raibaa murn d shall tie m w4vd as ' ine peemince mar ue awmher rainmenlr.dni den c rhr OMsien I21 ELSC N mull onvtpx 1..."Icadond the measures impacted, aa.— 7talends, serf 2. Wtv and hlmeMae gapvPiun and s,thln 24 3. R,me of lW psreon pmfwming Iho rose-6% hours aFa rain d. adranipn of whemkrthv measure acre opsranliy event, IA ace In p,ppr,ly. 24 nau,e s. bercfptien M maimenaM n[xtlf fw hM n+cefwe, 6- pa - Wn,ridence,„d dam df tannrrtive 4chiena halcn. !45enn.wahe, Assesf[enecpn I.Idendacanend ae dlunafec tiro[fausinipetud, •�asMle 7Wands, darn 2. Oa[o u�M rlmrofrheiioprevon, �,i[faua {51>Oal end wthlna 3. Name a lW pmdn perfwmi, tM inspenion, hhyrs oFaraln a ce of indvamrs of anormwaxr poliunion such as oa rwnt? IAfn[n In a nears Jtrnn nwnina o� v5oennM niurnrc_s .thin, s. Ineaadon ica.ir,¢tr,e o, aiseie sm:rnem iae, e. Dosmythn,sv,dence_are sax of w„eetise asnioraa Pave. �I VeimMe, M N tess<amepw If Wdok SeNme Mmi fav"pinEe f!u umhs• then a,emad 'Ite 7agents, earn of NefWA viol (lull he mamle and wlt.24 L asslms lakrn to dean op or atabilb. tho sedmrmt chat has fee hwrsoFanln the sex �4 events Ian h In 2. Inaarrglien. eNdenre. PM dam pf epreruve xnom lalmn, and 24 hews 3. M Papanatien as,e iw.sclan Pmnla cemrd tutu[ ,ekasow 'sl Slrca cos o, NieaR sett pv, I, ante Rrcamw wnlark oaf we,eaf[4 v�paic svdimrntatbn e,a rvesr•Ma mane 7cakndan den amhea Wshle inerwsed nabWltr from tM eorunu,h)nn nr ofRl[e wd"'hln 14 comity, rhmarcewdd the b Its, shall be made: ho af.raln sDosaasWn, swearsre and darn vF mr,eotar aelloiu lobo, and a,syswWvl _W'IaWhln ] a or tnn,[quirep rppp,ts to tnv aPProprratvPMwn 24he-a sleliay, OInet riot PM Ilk Salon C Item 42mal of 1M pefmit OtIn l6iii—coal almr.ith pnue 1. Toe pnaerine,lladlnt Pnnsesslm of prtll H rE&K s,ihlltatb. efg.dlne n dint and suhbhWas na-Iatanan of orm meawrn dranape fa ldn oompk,ion of as 4nddWu,hlo, aE1Nly. romm,usupn a-k—lar—ot, rar—cyst armuno—crl. Iphtdvwlw en 2. mrbaaprn errd rRyU bem ln tmd mrtaew omtnatlhoual ypmsaevcamnlp NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage underthis permit. The following items pertainingto the E&SC plan shall be documented in the manner described: Item to Rnrument Documentation Requlremeres la[ Each E&SC Measure has been installed Initial and dale each EMC Measure on a copy and does not slgnifaantty deviate from the of the approved E&5 Plan or cant plete, date IwLlnns, dlmensinns and relaNue elevauons and sign an Inspectian report that Ilsts each shown on the approved E&$C Plan. E&SC Measure sMwn on the approved MSC Plan- Thin documentation rs requlted upon the initial Installation of the E&s[Measums as if the ELSE: AAeasures.re modified after Initial h5tailallon- I01 A phmse of grading Kos peen completed. Initial and dale a py of the approved E&5c plan or complete, date and sign an Inspeu inn report to indicate Completion of the construction phase- Iel Ground eo+er Is located and Insulted Initial and date. ropy of the approved Easc in eccond4nce wllh the approved Mx Plan or complete, dare and sign an Inspector Plan, report to Indreate Compliance with appmVad ground cover sMiflotrons, Id} The maintem"M and repair C.anplem, dale tied sign an IMpatlfon report. n1 ,miubeM13 for all E85C Nmasurel harp been Performed. Ice Corcpctiyl attlbm have aeEn comae Initial and daft .copy of the apprayad E&5C +o E&SC h7eakurers. Plan or cernlplece, data ark sign an Inspection report to iodltale the completion of tie ppery iyr action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made duringthe previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided bythe Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters(regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions ofthis permit that may endanger health orthe environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 656-0366 or (919) 733-3300. ocom ence Reporting Timaframp IAfmr IzswwM and Other lsequlmmeoU 101 VFkhla sediment Wilkie M hp an wal or eIectromlc notification. deposition in a Within 7 rnWKW days, a report Nat mrst tins a description of the steam or vretlanal sediment and actions taken to address the cause of the deposition - Division =may wake the requlremeot for a written report on a se•bycase bays. lr the dream Is named tin tie N{. e9;tit] tic: as Impaired }or sedlme,rt- ralatgdcausm,the permietae rtuybe reghdred tv portwm addhional enit.nng, Impeetlpns nr apply mere stringan, pracriees if scale determine that addI 1—. requkemenu are neMed toaswre comglance with The federal yr state 4n 7N•waters conditions. (h] Oil spllls and • Wlthfo 2A hehar, an oral W ewer"lt noPRtatlon- Yew noufieatlon WE— or about the date, e, nature, volume and shall Inrinde Infarm.tlon time, Italledods Iprallon of thesplll or release. substances per Item lebl-(ciab— (c[AntlNpated . Areport of heaatttd dd7F hdorr the dole olthe b,"its, 900"04. bypasses (40 CFR The report serail include an eyarvation of the anticipated quality and 122.41[m4(3}] effect ofthe (of uaanutipated . Wltfdn 24 hows, an rxal or electronic n.611.1lon. bypasses[40 CFR • WItMn 7 mkidpr days. a report that Includes an evaluation of the 122.41WI34 quality and effect of the by (e} Nom—pilin— wtdrfd 24 haws, an oral a glgct+pnrc npdficatiop. with tire conditions WftNn 7rofrradw days, a report that contains a d—dipGgn of the e} this po"It dstt "Mc—, and its causes; Ihq period of noo—pliancv. may endanger Ine]uding ewrS dates and times, are If tine mrrrampliaMe has not heath or the been earrected, the antcipated time norl ompYan- Uext—ted to arrvl—ral4o costle..; and steps taken or planned tp reduce, elimloate, and CFR 172.41{IlI7l[ era 1 --mr nce of the nonwmpllance. [40 CFR 122A11B(fi}, • Oiyision staff may waive the rtquirom.m for awntan repose on a [ice• s,aso WW. NCGOI SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/191 ISSUED FOR PERMITTING - NOT FOR CONSTRUCTION