Loading...
HomeMy WebLinkAbout20161268 Ver 3_R-3300B Stream Impact Breakdown_20200615 (2)Carpenter, Kristi From: Herndon, T. Mason Sent: Monday, June 15, 2020 11:16 AM To: Shaver, Brad E CIV USARMY CESAW (USA); Steenhuis, Joanne Subject: RE: [External] RE: R-3300B Stream Impact Breakdown Whoops... should 27 not 17. Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndonl@ncdot.eov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Herndon, T. Mason Sent: Monday, June 15, 2020 11:11 AM To: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.miI>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Subject: RE: [External] RE: R-3300B Stream Impact Breakdown Sites 22, 23, 24 & 25 are CF not WO Site 23 is SW (pond) The only sites in the WO are 19 (splits both basins), 21, 26, 17, 28, 29, 30, 31, 32. Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 1 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil> Sent: Monday, June 15, 2020 10:43 AM To: Herndon, T. Mason <tmherndon@ncdot.gov>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Subject: RE: [External] RE: R-3300B Stream Impact Breakdown • External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ��m@nc.gov Is that the last change in all the wetland sites or do the rest need to be double checked? From: Herndon, T. Mason <tmherndon@ncdot.gov> Sent: Monday, June 15, 2020 10:24 AM To: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>; Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil> Subject: [Non-DoD Source] RE: [External] RE: R-3300B Stream Impact Breakdown Yes, it does. This project is going to make me lose my mind!!! Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon(@ncdot.eov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Sent: Monday, June 15, 2020 10:20 AM To: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil>; Herndon, T. Mason <tmherndon@ncdot.gov> Subject: RE: [External] RE: R-3300B Stream Impact Breakdown S0000... does this mean that the wetland impacts for Site 22 are also in the Cape Fear Basin? From: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil> Sent: Monday, June 15, 2020 7:53 AM To: Herndon, T. Mason <tmherndon@ncdot.gov>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Subject: [External] RE: R-3300B Stream Impact Breakdown External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Got it and good idea about permit condition. III touch base with Beth after 8 and get back with you. From: Herndon, T. Mason <tmherndon@ncdot.gov> Sent: Monday, June 15, 2020 7:38 AM To: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.miI>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.�ov> Subject: [Non-DoD Source] R-3300B Stream Impact Breakdown Importance: High Attacked is a breakdown of the mitigable and non-mitigable stream impacts broken down by river basin. Additional non-mitigable that I have listed that were not previously listed as non-mitigable in our previous discussions are listed below and based on review of the permit site drawings and details: Site 7 19++57 to 20+40 -Y38- RT Outlet Channel 32 If for floodplain bench Site 3 611+98 to 612+68 -1-1- LT 56 If Outlet ditch rip rap that does not have fill in thalweg (Basically BS) Site 31 LILT 320+33 RT— CL. B Rip Rap Pad — for stormwater outfall that does not have fill in thalweg (Basically BS) Site 3 1 at 12' x 7' RCBC Inlet Channel — channel modification ( basically realignment) Also, in Table 3, Site 22 was listed in the WO when it is actually on NC 210 (Stream LSB) which is in CIF basin. I'm also proposing to that you had a condition in the permits, that "rip rap placed in the main flow of any channel be buried to the natural streambed elevation" so if any of these impacts require rip rap in the main channel it is not a loss. I will add this permit condition to the greensheet as a permit condition. Based on these final tally of mitigable stream impacts, my DMS acceptance letter is short 4 If in the CIF basin and 41 If over in the WO. Please let me know if you have any questions or if we need to discuss any of these sites further. Thanks! Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.