Loading...
HomeMy WebLinkAbout20161268 Ver 3_R-3300B Stream Impact Breakdown_20200615Carpenter, Kristi From: Herndon, T. Mason Sent: Monday, June 15, 2020 7:38 AM To: Shaver, Brad ; Steenhuis, Joanne Subject: R-3300B Stream Impact Breakdown Attachments: R-3300B Stream Impact Breakdown.xlsx Importance: High Attacked is a breakdown of the mitigable and non-mitigable stream impacts broken down by river basin. Additional non-mitigable that I have listed that were not previously listed as non-mitigable in our previous discussions are listed below and based on review of the permit site drawings and details: Site 7 19++57 to 20+40 -Y38- RT Outlet Channel 32 If for floodplain bench Site 3 611+98 to 612+68 -L1- LT 56 If Outlet ditch rip rap that does not have fill in thalweg (Basically BS) Site 31 LLT 320+33 RT— CL. B Rip Rap Pad — for stormwater outfall that does not have fill in thalweg (Basically BS) Site 3 1 at 12' x 7' RCBC Inlet Channel — channel modification ( basically realignment) Also, in Table 3, Site 22 was listed in the WO when it is actually on NC 210 (Stream LSB) which is in CF basin. I'm also proposing to that you had a condition in the permits, that "rip rap placed in the main flow of any channel be buried to the natural streambed elevation" so if any of these impacts require rip rap in the main channel it is not a loss. I will add this permit condition to the greensheet as a permit condition. Based on these final tally of mitigable stream impacts, my DIMS acceptance letter is short 4 If in the CF basin and 41 If over in the WO. Please let me know if you have any questions or if we need to discuss any of these sites further. Thanks! Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Site No. Station (From/To) Permanent Structure SW Permanent SW Size / Type impacts ac Temp. SW Temp. SW impacts ac Existing Channel Impacts Existing Channel Impacts Permanent ft Existing Channel Impacts Existing Channel Impacts Temp. ft CF 3 609+50 to 618+70-1-1- ROADWAY FILL 0.526 0.010 419 36 611+72 to 611+91-1-1-RT 1 at 12'x7' RCBC INLET CHANNEL INLET BANK STABILIZATION 33 611+98 to 612+68-1-1-1-T OUTLET CHANNEL 0.014 56 OUTLET BANK STABILIZATION 38 45+87 to 47+20-Y30-LT ROADWAY FILL 53+88 to 54+12-Y30-LT 30" RCP OUTLET DITCH 0.005 25 54+51 to 56+42-Y30-LT 2 at 66" RCP OUTLET DITCH 0.019 0.002 91 10 56+99 to 57+43-Y30-RT ROADWAY FILL 57+15 to 58+74-Y30DET- 0.006 125 13+40 to 19+59-Y30RPA- 0.094 0.011 441 55 15+01 to 15+56-Y30RPA-LT 1 at 12'x7' RCBC INLET CHANNEL 0.005 0.003 29 12 26+15 to 26+49-SR6-LT OUTLET CHANNEL 0.004 14 OUTLET BANK STABILIZATION 14 18+22 to 20+14-Y30RPD- ROADWAY FILL 0.060 243 19+69 to 20+05-Y30RPD-LT 1 at 12'x7' RCBC INLET CHANNEL 0.005 25 INLET BANK STABILIZATION 25 18+99 to 19+24-Y30RPD-RT OUTLET CHANNEL OUTLET BANK STABILIZATION 22 5 638+99 to 642+01-1-11- ROADWAY FILL 0.085 364 6 641+99 to 643+06-1-1- ROADWAY FILL 0.121 0.010 355 31 7 645+01 to 666+60-1-1- ROADWAY FILL 0.606 0.012 1768 52 OUTLET CHANNEL OUTLET BANK STABILIZATION 34 18+94 to 20+52-Y38- ROADWAY FILL 0.112 226 19+83-Y38-RT 3 AT 12'x8' RCBC 19+38 to 20+09-Y38-LT INLET CHANNEL 19+57 to 20+40Y38-RT OUTLET CHANNEL 0.013 0.003 32 10 18+94 to 19+38-Y38- ROADWAY FILL 11+08 to 12+48-Y38DET- 13 709+67 to 715+63-1-1- ROADWAY FILL 0.063 228 712+83 to 713+95-1-1-RT 2 at 12'x7' RCBC INLET CHANNEL 0.022 0.004 78 14 711+78 to 712+35-1-1-1-T OUTLET CHANNEL 0.003 12 OUTLET STABILIZATION 42 22 10+17 to 12+28-SR5- ROADWAY FILL 0.007 163 CIF Totals 4701 WO 19 769+74 to 854+07-1-1- ROADWAY FILL 0.254 773 773 48+38 to 56+57-SR7- 14+42 to 29+70-SR8- 7+45 to 16+31-Y32RPB1- 18+01 to 22+37-Y32- 0.144 484 484 29+50 to 39+40-Y32- 21 23+66 to 25+54-Y19- ROADWAY FILL 0.014 97 97 25+09-Y19- 1 AT 8'x6' RCBC 24+82 to 25+32-Y19- OUTLET CHANNEL 0.009 33 31 LLT 320+33 LT 6' X 4' RCBC Extension 0.009 26 26 LLT 320+33 LT Channel Realignment LT 0.012 0.004 39 19 39 LLT 320+33 RT CL. B Rip Rap Pad 6.004 20 20 LLT 320+33 RT Channel Realignment RT 0.008 0.004 37 16 37 WO TOTALS 1476 1380 96 1476 6177