HomeMy WebLinkAboutNCG170428_Inspection_20191025Compliance Inspection Report
Permit: NCG170428 Effective: Expiration: Owner : Fibertex Personal Care
SOC: Effective: Expiration: Facility: Fibertex Personal Care
County: Randolph 733 Commerce PI
Region: Winston-Salem
Asheboro NC 27203
Contact Person: Julie Newsom
Title:
Phone: 336-799-1321
Directions to Facility:
From 1-74, exit east on 1712 / Pineview Road, then turn left/north onto Fayetteville St., then left/west onto Commerce Place.
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 10/25/2019 Entry Time 09:OOAM Exit Time: 10:OOAM
Primary Inspector: Brandon L Wise Phone: 336-776-9660
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Textile Mill Products Stormwater Discharge COC
Facility Status: ❑ Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG170428 Owner - Facility: Fibertex Personal Care
Inspection Date: 10/25/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page 2 of 3
Permit: NCG170428
Inspection Date: 10/25/2019
Owner - Facility: Fibertex Personal Care
Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑
❑ ❑
# Does the Plan include a General Location (USGS) map?
❑
❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑
❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑
❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑
❑ ❑
# Does the facility provide all necessary secondary containment?
❑
❑ ❑
# Does the Plan include a BMP summary?
❑
❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑
❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑
❑ ❑
# Does the facility provide and document Employee Training?
❑
❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑
❑ ❑
# Is the Plan reviewed and updated annually?
❑
❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑
❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑
0 ❑ ❑
Comment: Facility was in the process of getting a new consultant to create their SWPPP.
Mid -Atlantic has
taken over and was on site during the inspection. A very rough draft was available but Mr.,
Spangenberg ensured that all requirements would be met in the final draft.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑
Comment: New facility had not performed any monitoring at the time of the inspection.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 1111011
Comment: No analytical required under current operating procedures.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment: Inspection performed as part of the 30-day comment period therefore no CoC was available at
the time of inspection. A single outfall is located in the front of the facility where water discharge:
from a series of dry ponds. Illicit discharges were inspected following the closure of the erosion
and sediment control permit.
Page 3 of 3