Loading...
HomeMy WebLinkAboutWQCSD0717_NOV-2020-DV-0227_20200615THE TOWN OF LATTIMORE Alton Beal, Mayor Council Members June Whitaker Gary Hall Jackson Martin } l ,I June 11, 2020t}t, Mr. W. Corey Basinger NCDEQ Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 Dear Mr. Basinger; This letter is in response to your letter to the Town of Lattimore dated May, 14, 2020 concerning the Sanitary Sewer Overflow.(SSO) that was reported in February 2020. The tracking number for these violations is NOV-2020-DV-0227. Since the major rain event that caused these violations, the Town of Lattimore has been assisted by the Town of Boiling Springs (who maintains our system) to review and repair the system to reduce the entry of stormwater into the system. The following pages will outline the repairs that have been made to the system. We are confident that these` measures will significantly reduce the possibility of a future event. Please review the measures on the following page. if you have any questions or need more information, please feel free to contact me at 704-692-7705 or altonbeal@me.com, Sincerely, C Alton Beal Mayor Cc: Mr. Mike Gibert, The Town of Boiling Springs 120 Cherry Street— P.O. Box 272 Lattimore, NC 28089 Phone - 704.434.2620 - Email - townoflattimore@gmail.com THE TOWN OF LATTIMORE Alton Beal, Mayor Council Members June Whitaker Gary Hall Jackson Martin MEASURES TAKEN BY THE TOWN OF LATTIMORE IN RESPONSE TO SSO A throughout inspection of the sewer system revealed multiple issues in need of repairs or upgrades. The following repairs have been completed: o Manhole repair on Martin Street -Old ring removed and resealed, riser added o Manhole repair on Martin Street - Added 2 inch riser to bring manhole to road level o Manhole repair on Jones Road - 6 inch riser added and sealed o Manhole repair on Jones Road - 4 inch riser added and sealed 0 18 cleanouts repaired or plugged o Open hole in Church Street -filled with hydraulic cement o Manhole on Towery Road - sealed • The following repairs are in progress: o Anew ditch line must be dug to alleviate drainage into a manhole at Ambassador Baptist College (should be completed by the end of July) o A storm drain on Church Street is being engineered to further alleviate potential stormwater entry into the system (estimated to be completed by August 15) Please note - The Town of Lattimore's sewer system is operated and maintained by the Town of Boiling Springs. The Town of Lattimore is grateful for the cooperation and help that has been afforded by the Town of Boiling Springs. 120 Cherry Street — P.O. Box 272 — Lattimore, NC 28089 Phone - 704.434.2620 — Email - townoflattimore@gmail.com