HomeMy WebLinkAbout20200744 Ver 1_Shoreline Stabilization_20200601o/ GL1
State of North Carolina
Department of Environment and Natural Resources
DWR Division of Water Resources
15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
Division of Water Resources FORM: SSGP 10-2013
Shoreline Stabilization Application' Form
Three copies of the application (including attachments) and the application fee should be sent
to:
Division of Water Resources
401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
Applicant Information [15A NCAC 02H .0502(a)]
1. Owner Information
Name: 1--f-A"5od jw1S
Mailing Address. 3a&,5 1�CUM Cq+MP G7�y4p v!40
5 Rm.e \s � v-J C z8L03
8Z13 -v70 -qg'2'7
Telephone Number: .7M 8Z,8-478'97ax Number: at, AgLW MWE 701f-0513-78740
E-mail Address: --i- Lewi5 -777&U.9/NEhL. Cdy-)
2. Agent/ Contact Person Information
A signed and dated copy of the Agent Authorization letter (a form can be downloaded here:
httn://www.saw.usace.armv.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH
ORIZATION FORM.pdf) must be attached if the Agent has signed this application form.
Name: /AlkIt" 7-0151
Company Affiliation: &,*end kAtS DF Yhc CARA,AN
Mailing Address:
Telephone Number: 'io`1- 2-5g -70 78 Fax Number:
E-mail Address: /))iK��(.q►�t_NDpi►MA1fMlkx�z (.Ol
Person to receive the Certification Approval: =[B014 LpAitl
II. Project Information [15A NCAC 02H .0502(a) & (b)]
1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with
respect to local landmarks such as towns, rivers, and roads.
2. Provide a detailed site plan showing property boundaries and proposed locations of
vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces,
FORM: SSGP 10-2013 Page 1 of 3
SAMPLE AGENT AUTHORIZATION FORM
PROPERTY LEGAL DESCRIPTION:
LOT NO. ff / Z PLAN NO. PARCEL ID: 4W901?-NiZ000D_
STREET ADDRESS: 3 (�o o 7 j)g,`S M cAwponro J Nw J) o.Nn
Please print:]
Property Owner:
Property Owner:
The undersigned, registered property owners of the above noted property, do hereby authorize
of
(Contractor / Agent)
Vie; ,1 lvo" S o; 'C �i CAr V34-S
(Name of consulting firm)
to act on my behalf and take all actions necessary for the processing, issuance and acceptance of
this permit or certification and any and all standard and special conditions attached.
Property Owner's Address (if different than property above):
N C- Z�'(� 73
Telephone: _ 704-902-2655
We hereby certify the above information submitted in this application is true and accurate to the
best of our knowledge.
Auth ed Signature Authorized Signature
Date: 5-26-2020 Date:
RECEIVED
JUN 01 2020
NCDEQ/DWR/NPDES
etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations,
and construction access corridors. You may use the diagram provided at the end of this
application form.
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale
of some sort- a yard stick, shovel handle, etc.)
4. Location of the property (where work is to be conducted)
County: _OgI:A L±:&pr Nearest Town: 5?5ELf_k115 FOCO
Subdivision name or site address (include phase/lot number): 31OO7 h"A
CPcw11 r,1M V 4,p Aopo
Directions to site - please include road names and numbers, landm rks, etc.:
Nag 15D ERS+ -fo A nh� -fy -A D (n L.1-1111� hJout"(, .RT orgy to 1-
Latitude (in decimal degrees) �5'�� Longitude (decimal degrees) $ 25Z5
5. Describe the existing land use or condition of the site at the time of this application
(residential, undeveloped, etc.): AE-3%& <L
6. Property size (acres): / 3 o kres s,,!
7. Lake/ river/ ocean adjacent to property: LkV__E 0�OCLM
8. Describe proposed work (include discussion as to how hardening of shoreline has been
avoided, or why it is necessary): -Profirc�' 5`tr6'4e- 'R,0r1k
-WP,X \AS -1,440E oa 20' dF
9. Will work be conducted from land? []' From water? ❑
10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.)
below the normal pool lake level/ Normal Water Level in square feet or acres:
w , uc x -' t>tiah - -7-W' °
11. Total amount of disturbance (including all clearing, back fill excavation, rip rap, retaining
walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in
square feet or acres: 0 )As
12. Please describe the vegetation above the normal pool lake level/. Normal Water Level and
50 feet landward to be impacted (number pf trees, for instance):
AJ/oS
/Zzl zo2.o
Owner/Agent's Signature' [15A NCAC 02H .0502(f)l Date
"Agent's signature is valid only if an authorization letter frgm the owner is provided.
FORM: SSGP 10-2013 Page 2 of 3
Lake
Full Pond/Normal Water Level)
i� 0 r✓ g e '►Dn) &:M 0 qeP
o�
i �fvL�9
Full Pond
Norma! Water Le
m �-
Shoreline FP 70 'vtj�
Please approximately sketch the following information on this plan (provide dimensions for each
item, such as 10 ft x 100 ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 3 of 3
DUKE ENERGYINTERNAL USE ONLY Lake Permit ( DUKE
Date Received App Fee Amt Application 'C� ENERGY.
—i-20
Duke Energy Lake Services
Site ID HEP Fee Mail Code EC12Q
526 S. Church St.
Charlotte, NC 28202
I. APPLICANT / PROPERTY OWNER INFORMATION (property owner mailing address and contact information)
Name* Jason Lewis Primary Phone* 828.478.9877
Address* 3665 Drurn'Campground RD Secondary Phone
City* Sherrills Ford State* NC Zip Code 28673
Email 1ilewis7776@amai1.com
II. LAKE PROPERTY INFORMATION (location of permit)
Is there an existing dock or other facilities Yes If yes, include Dock Tag #. If tag
along the shoreline property or over the Lake? ✓0 No cannot be located, note that here.
Address* 3607 Drum Campground
county*
Catawba
RD
city* ISherrills Ford I
State* jvC
Zip Code* 28673 Lake*
Norman
Subdivision
Lot(s)
Latitude and longitude of the property. Please use a service/software to acquire the location information. Values should be provided
in Decimal Degrees format (35.1245).
Latitude (e.g. 35.12345)* 35.594115
Example service: http://getlationg.net/ Longitude (e.g.-80.12345)*-81.012525
III. PROPOSED ACTIVITY (check all that apply)
CINew/Modification of Existing Structure
✓/" New/Modification of Existing Shoreline Stabilization
[]Transfer of Ownership (check box if you want a copy
of permitting history ❑ )
0 Maintenance of Existing Structure
Maintenance of Existing Shoreline Stabilization
Other (Describe below. If the activity involves an irrigation
withdrawal, include the pump capacity.)
Structure size Is dock covered?
(square feet)
Is structure a
common use dock?
Shoreline Stabilization Length of 70
stabilization (feet)
Brief Description of
the Activity
Describe briefly the
existing structures
over land and water
(include sq ft)
Materials IROCk/RIPRAP
Yes EJNo Number of slips
Yes* No Number of jetports
•if yes, see special note in Section vil
Distance from shoreline (feet) 1 4i —5r
Stabilization of shoreline with clean stacked Rock. RIPRAP
To protect shoreline from erosion
IV. Additional Requirements (include with application; limit document sizes to 11"x 17' or smaller)
You must include the following items with your application (unless specifically excluded for your application type).
Survey stamped/signed by a professional licensed surveyor
®showing the location of the existing or proposed structure
and/or survey of the existing or proposed stabilization (not
required for transfer)
®Photos along property shoreline and photos of existing
structures and/or stabilization in or near the water
® Application fee (check only, payable to Duke Energy)
® Signed User's Agreement Letter
V. Application Processing
Plan and profile drawing showing all measurements,
❑elevations, and irrigation line routing (not required for
transfer UNLESS tag number can't be located; sketch can be
used in such cases, not required for shoreline stabilization)
Local and state permits (contact your county for all
❑structure applications in NC, • Tega Cay, SC, • Kershaw County,
SC, • NCDWR approval required for shoreline stabilization in
NC, • not required for other applications)
Habitat Enhancement Program payment (required only for
❑New/Modified structures at Catawba-Wateree and Keowee-
Toxaway lakes and shoreline stabilization at Keowee-
Toxaway)
• Application is reviewed and determined if complete. Fields with an asterisk are required.
• If application is not complete or does not include all items and information listed in the checklist, the application
will be returned as incomplete.
• A Duke Energy representative will visit the site to conduct a visual inspection.
• Applicant/Property Owner will be notified of approval or denial, typically via email.
VI. Directions by Road
uirections DV Koaa-
Enter Property from MT Pleasant Road. There is a gate next to Dockside Storage 3530 MT Pleasant
RD., Sherrills Ford, NC, 28673. It has a reality sign on it. Please close gate after entering. We have
horses, they are friendly. You can drive to the lake or walk. Thank you
East on HWY 150, RT on Little Mountain, RT on MT Pleasant, RT into gate
Gate Code
VII. Application Submission
Please complete, print and sign this application. Then enclose all items required per Section IV above and submit to the
address below.
Duke Energy Lake Services
Mail Code EC12Q
526 S. Church St.
Charlotte, NC 28202
I agree the information contained within is
Owner Signature *
Common Use Dock Co -Owner Signature(s) and Information (all owners of common use docks must submit a signed
User's Agreement and application fee) Attach additional sheets if there are more co -owners
Name
Address Signature
Name
Address Signature
DUKE ENERGY PRIVATE FACILITIES
"USER'S AGREEMENT"
(Fill in blanks with required information. Please Print)
Date 4-21-2020
TO: Duke Energy
c/o Lake Services - EC12Q
526 S. Church Street
Charlotte, NC 28202
RE
(Lake Name) Norman
(LakeAddress) 3607 Drum Campground RD
Sherrills Ford NC 28673
(Owner's full name) Jason Lewis hereby
agrees to comply with all requirements and conditions set forth by Duke Energy's Lake Services
(Duke Energy) office, and any federal, state or local agencies pertaining to our application to
construct and/or maintain a Shoreline Stabilization on Lake
Norman _
In addition, I/we have read and agree to comply with Duke Energy's Shoreline Management
Guidelines (SMG) and understand that written authorization must be obtained from Duke
Energy prior to beginning any activity/construction within the Federal Energy Regulatory
Commission (FERC) Project boundary. The construction will be completed as described in
the approved application and within twelve (12) months following the date of approval by
Duke Energy. Failure to complete construction within the 12-month build -out period or any
Duke Energy approved extension will require the applicant to file a new application that
complies with the then -current SMG. The new application filing will include any applicable fees
and security deposits.
I/we attest to be the owner or lease holder of the tract of land immediately adjoining the
Project boundary where the proposed private facility is to be constructed.
I/we agree to comply with all FERC orders (as modified or interpreted by FERC), with all other
applicable FERC Rules and Regulations implemented by Duke Energy, and with all rules or
regulations imposed on Duke Energy by any governmental agency.
Page 1 of 5
Rev 12/9/2019
I/we understand the physical location of my/our lot in relation to the common property line with
Duke Energy, if any, the FERC Project boundary, and any deeded flood easements or required
building setbacks.
I/we understand that this lake was constructed as a working hydropower reservoir for the primary
purpose of producing cost-effective electric energy and that this remains as the lake's primary
purpose. I/we understand the lake and its associated hydroelectric facilities are operated by Duke
Energy under the terms of a license issued by the FERC and there will be no change in hydro
project operations as a result of the construction and/or use of any facilities that Uwe may be
allowed to place within the FERC Project boundary or on any Duke Energy -owned property.
I/we understand during drought conditions Duke Energy may request reduced usage or
discontinued usage of any water withdrawal or related systems, until such drought conditions
improve. Failure to do so may cause possible removal of the system and/or any other permitted
facilities that I/we may have, and any costs associated with removal of the facilities will be
assessed to the lot owner.
I/we understand lake levels will rise and fall over time in response to weather events and hydro
project operations and Duke Energy does not guarantee an approved facility will always have
sufficient water depth to be accessible by boat or for other water depth related recreation
activities.
I/we acknowledge Duke Energy provides no guarantee of any specific quantities (except those
identified in the FERC license) or quality of water in the lake.
I/we understand the facilities to be installed and/or maintained are my/our property and I/we
therefore agree to be fully responsible for the permitted reservoir use including maintaining
facilities in good repair. If the private facility is deemed unsafe by Duke Energy, I/we agree to
repair or remove the private facility at my/our own expense and within the specified timeframe
set by Duke Energy.
I/we understand Duke Energy approval of the requested reservoir use in no way constitutes
assignment of any interest in real property Duke Energy may have (i.e. land rights). The approval
is granted and maintained solely at Duke Energy's discretion. I/we also understand the permitted
use may be revoked at any time by Duke Energy or its successors for any reason whatsoever. If
the approval is revoked, I/we agree to remove the facility at my/our own expense within the
specified timeframe set by Duke Energy.
I/we understand ownership/interest in a Common Use Facility or residential marina eliminates
the option of having a separate private facility on any other owned or leased lot within the
affected subdivision.
I/we understand this lake is open for use by the general public and that maintaining safe and
lawful public use is one of the primary lake management objectives of Duke Energy.
Page 2 of 5
Rev 12/9/2019
I/we understand the use for which we are applying is a private use and it should not interfere with
the general public's safe and lawful use of the lake.
I/we understand lake use permit holders have the authority to prevent others from trespassing on
the facilities I/we have built. I/we also understand I/we, however, do not have any authority to
impede anyone from pursuit of the lawful public recreation enjoyment of FERC Project lands
and waters. Except as specified otherwise in the SMG, other Duke Energy documents (e.g.
Public Safety Plans), or a separate lease agreement, anyone may fish around/under facilities built
by others, may walk/wade/fish within the FERC Project boundary, boat in the lake's waters, etc.
without having to get anyone's permission to do so.
I/we agree to fully disclose all information regarding the approved private facility to any
prospective buyer/leaseholder of the property and any new owner/leaseholder. Uwe agree to
notify Duke Energy immediately of any sale/transfer of the property, including the name and
address of the new owner and to transfer the permit and/or Duke Energy lease to the new owner.
I/we agree the adjacent Duke Energy Project property, if any, shall be used exclusively for non-
commercial recreational purposes and that Uwe shall not rent or otherwise allow third parties
(except for temporary use by guests, family members, and leaseholders of the residential
property) to use any facilities permitted to me/us by Duke Energy.
I/we agree not to allow any use of the adjacent property, and will exercise due care and diligence
to prevent all other persons that are affiliated with my/our property (including invitees, family
members, guests, etc.), to violate an applicable federal, state or local law or regulation. Examples
include, but are not limited to nudity, illegal discharge of firearms or fireworks, controlled
substance abuse, public drunkenness, public urination or defecation, or other activities
determined to be a nuisance by law enforcement officials.
I/we agree to exercise all care and due diligence to preserve and maintain the character of the
Duke Energy's adjacent property, if any. 1/we agree to comply with the Duke Energy vegetation
management requirements as stated in the SMG. I/we agree further to not allow sewage,
including discharge from septic tanks (or similar facilities) or boat holding tanks, garbage, trash,
or other waste material to be discharged or dumped into the reservoir, tributaries or adjacent
property.
Uwe understand that as an adjoining property owner Uwe can make no change in land form of
land within the FERC Project boundary or land owned by Duke Energy, if any, such as grading,
excavation or filling without prior written approval by Duke Energy.
I/we agree for myself/ourselves, members of my/our family, guests and invitees that Ifwe assume
all risks of personal injury or property damage incident to my/our occupancy and use of the
FERC Project boundary or land owned by Duke Energy, if any; including, but not limited to, any
personal injury or property damage which may be sustained as a result of flood waters or in
connection with the rise and fall of water in the reservoir as a result of floods or of the operation
of Duke Energy's hydroelectric facilities. I/we as the adjoining property owner(s) further agree
I/we will indemnify, protect, defend, and save harmless Duke Energy from any and all loss, cost,
Page 3 of 5
Rev 12/9/2019
claims damages, expenses, judgments and causes of action for all injuries and damages sustained
by the members of my/our family, guests, and invitees arising or claimed to have arisen in
connection with their occupancy or use of the Duke Energy permitted facility(s).
I/we agree if any action is taken by Duke Energy to enforce any provision, covenant or
agreement contained in this user agreement or Duke Energy SMG or if Duke Energy is required -
to retain an attorney to enforce any provision, covenant or agreement contained in this user
agreement or SMG (including, without limitation, the payment of fees due hereunder or the
removal of an encroachment constructed in violation of this user agreement or SMG), then Duke
Energy shall be entitled to recover all of its reasonable costs associated with such an action,
including but not limited to, attorneys' fees and court costs incurred in such action and/or
enforcement.
I/we understand certain activities specified in the SMG are prohibited because of environmental
concerns, boating capacity limitations, safety considerations and other reasons.
I/we specifically waive any claim against Duke Energy for consequential damages arising out of
or relating to this application, Duke Energy's approval or denial of it, or subsequent revocation
of approval, and I/we specifically understand and acknowledge that, because Duke Energy can
revoke the permitted use at any time, I/we am/are not entitled to reliance damages.
I/we understand the proposed facility will be used only for the purposes described in the
information submitted to Duke Energy and other appropriate governing bodies for approval.
I/we understand every reasonable effort must be made to minimize adverse impacts on fish,
wildlife, and other natural resources.
I/we understand trees and vegetation growing within the Project boundary play an important role
in the overall environmental condition of the lake. The ecological benefit the vegetation has on
the fish and wildlife habitat supports a sound and healthy lake environment. I/we also understand
unauthorized removal of shoreline vegetation and/or disturbance of the shoreline buffer may
result in suspension or denial of lake use permitting requests and require me/us to re-establish the
vegetation, if the disturbance is found to be in violation of the state or county watershed buffer
regulations or Duke Energy's vegetation management requirements as stated in the SMG.
I/we agree to maintain any prescribed mitigation activities that are required in order to gain
approval for facility construction, as long as the facility exists.
I/we recognize I/we have the continuing responsibility to ensure that the constructed facilities are
maintained in good repair, including, but not limited to maintenance of the facilities, and proper
erosion control within the permit area and along the shoreline, and agree to take all reasonable
steps necessary to meet this responsibility. I/we agree to maintain all facilities within the Project
boundary and on Duke Energy -owned property, if any, in a sound condition and in a neat
appearance and pay all costs for said maintenance.
Page 4 of 5
Rev 12/9/2019
I/we understand Duke Energy representatives may issue Stop Work Directives for any
violation(s) of the SMG or engagement in prohibited acts or activities on Duke Energy property,
if any, as specifically identified in the SMG. I/we understand persons found to be in violation
will be subject to Duke Energy sanctions which can include, but are not necessarily limited to: 1)
restoration of the impacted area at the person's expense; 2) loss of consideration of any future
lake use permitting activities for up to five years for improper vegetation removal or until
vegetation is satisfactorily re-established (even if there is a change in property ownership); 3)
revocation of a previously issued permit and loss of consideration of any future lake use
permitting activities and/or reinstatement of the revoked permit; 4) increase in fees; 5)
modification or removal of non -complying facilities; and/or 6) further legal action being taken
by Duke Energy.
I/we agree that if any historic or archaeological resources are discovered during construction of
an approved activity the applicant must stop work immediately and contact Duke Energy. I/we
understand that in the event that anyone discovers a potential site of archaeological or historic
significance including any gravesite within the Project, the individual must immediately notify
Duke Energy.
Uwe acknowledge Duke Energy has the right to charge reasonable user's fees for private use of
its property, if any, and the Project and failure to pay any applicable user's fees in a timely
manner can result in the suspension or cancellation of any previously approved lake use permit.
Uwe agree to notify Duke Energy when construction is completed and during the construction
period, I/we will post the Duke Energy approval (to be provided by Duke Energy) at the job site
visible from the water's edge.
Jason Lewis
Property Owner Name
3607 Drum Campground RD
Lake Street Address
Sherrills Ford NC 28673
City/State/Zip Code
828-478-9877
Preferred contact Phone Number
jlewis7776@gmail.com
Email Address
Page 5 of 5
�iz, ,L.arua�l
Property O Signahme
3665 Drum Campground RD
Home Mailing Address
Sherrills Ford NC 28673
City/State/Zip Code
Home Phone Number
4-21-2020
Date
Rev 12/9/2019
6t
r
tv I
IP
tATTACH TO
is
Jbbt) DRUM
CAMPGROUND
iL
4r
Al
Ab
XA