HomeMy WebLinkAbout20081368 Ver 1_Mitigation Evaluation_20090422
Mitigation Project Evaluations: Information Table
NC Division of Water Quality
Date of Office Review: Evaluator's Name(s):
Date of Report: Report for Monitoring Year:
Date of Field Review: Evaluator's Name(s):
Other Individuals/Agencies Present: ?u - t `f' ?-
Weather Conditions (today & recent): ''•,"_"'
Directions to Site: Site is located approx. 0.25 miles south o f Smithfield, on the east side of
sourh of the 1-95 interchange.
1. Office Review Information:
Project Number: 20081368
Project Name: Brogden Road Buffer Restoration Site
County(ies): Johnston
Basin & subbasin: Neuse 03020201
Nearest Stream: Neuse River
Water Quality Class of Nearest Stream: C; NSW
Mitigator Type: Full-Delivery (EEP)
DOT Status:
Road (NCSR 1007) just
Project History
Event Event Date
Report Receipt: Monitoring 5/27/2008
Total Mitigation on Site
Wetland:
Stream:
Buffer: 15 acres
Nutr.Offset:
Approved mitigation plan available? Yes No
Monitoring reports available? Yes No
Problem areas identified in reports? Yes No
Problem areas addressed on site? Yes No
Mitigation required on site: *Add significant project-related events: reports,
Associated impacts (if known): received, construction, planting, repairs, etc.
During office review, note success criteria and evaluate each component based on monitoring report
results. Record relevant data in Sections II and III.
On back of sheet, note other information found during office review and/or to be obtained during site visit.
II. Summary of Results:
Monitoring Success Success
Mitigation Component Year (report) (field) Resolved
20081368 15 acres Buffer Restoration
Version 1.0 (August 22, 2007)
n
Page 1 of 2
?aT?l
J
Mitigation Project Evaluations: Information Table
NC Division of Water Quality
MITIGATION SUCCESS:
Compared to the approved mitigation plan, this project is: successful partially successful unsuccessful
List specific reasons for lack of success for this project:
Additional comments (e.g. DWQ follow-up actions, recommendations, etc.):
Version 1.0 (August 22, 2007) Page 2 of 2
Buffer Mitigation Project Evaluations: Information Table
NC Division of Water Quality
Component: 15 acres Buffer Restoration Component ID: 20081368
Description: UT and smaller trib
Location within project: See maps
III. Buffer Site Details:
Riparian Buffer (Streams Only) Nutrient Offset (Streams or Ditches)
El
Streams verified by DWQ: Yes No Buffer Width: 75
Comments: Comments:
N.
Total Acres:
Restored Acres:
Enhanced Acres:
Buffer Width: 50' > 50'
Grandfathered Site? (EEP Only) Yes No
I-
IV. Success Criteria Evaluation:
VEGETATION:
NOTE: Success Criteria is 320 spa
Monitoring report indicates success?
Total Acres:
Restored Acres:
Enhanced Acres:
Dominant Plant Species
Species Story TPA/'1o cover
?1 ?1,0 bat,
Yes No
Average TPA for entire site (per report):
J-k
Observational field data agrees? Yes No
Date of last planting:
i
Vegetation growing successfully? Yes No
General observations on condition of riparian/buffer areas and associated stream bank (e.g. bank stability,
overall health of vegetation, etc.)
Version 1.2 (March 5, 2009) Page 1 of 2
Buffer Mitigation Project Evaluations: Information Table
NC Division of Water Quality
Specific vegetation plots or site locations with little to no vegetation:
Estimated acreage or site percentage of unvegetated areas:
Invasive species on site (species, location(s), and % cover):
Easement Marking Method:
List any remaining issues to address (e.g. plant survival, easement encroachment, etc.):
MITIGATION SUCCESS:
Compared to the mitigation plan, this component is: successful partially successful not successful
List specific reasons for lack of success for this component:
Additional Comments (e.g. DWQ follow-up actions, recommendations, etc.):
During site visit, document representative conditions and areas of concern. Label and attach photos to
this report.
Attach maps showing photo locations, problem areas, and/or important field observations.
Additional notes related to evaluation of this component:
Version 1.2 (March 5, 2009) Page 2 of 2
T Z
0-1
?zz
n
IV
* r-?:,
O p y
N
p n -??fi d I.I
,,+ P ,7?4
v
OD
0
N
?. i
W U V`
0
O ?
O ?
O
O 7zz
f•
r
A
n
b g {
A _
0
I I I I r ?, ?'??
S.7"LN.000IV
O
fr
4
35"SU.VUV IV
w
W
_ z rn
e
cQ
?s
r
o
W
N
.
? N
O
' „
?
f ?1 I
o
N
? ?'nr r r
?• r
i . o
0
W
o
?' S( o
? O
b
l? 00
V
Oo
?O
O
0
o-
- Pot,
}? 1
a
2Col) nnn? KI
JJ-G7.VVV 14
35°30.000' N
O
O
N� A (03 clen koad (Joins shoot
N A
NuA NuA Q RbA UOA
RbA NuA NOR
4
NuA G.A GoA
FIELD
NaA
NuA GOA Ly
NUA
NoA
GOA
Ly PbA NOA
r1007 NnA
a GuA
'oA fir
COB Ud
A
Gr Na Na
Ud WaS
-NIJA RbA NUA P� Ly GOA GOA
N.R
�A
N a
Na Na A
COB
96
4 GOA G, Gr GoA
GoA
0 N a
NuA Rb Na pa Na
NoA
GoA
% oA N B
eB
NuA ma GOA GOA
'Ra GOA
Na
Coff No GeB
GeB GdAr
Na vi
GeB GOA NnA Rai GOA
oA Y GoA R, Na uu
NoB
GOA 13 Ll GeB Na GOA Na GOA u
Cal
GOA Ra G
Ly GOA N G.n --AS- GOA
NoA G B
h -Opp,
i� Ly Ly eB Goh,
r_ NoB
GeB Ra
StA ASA� DoA Ly GOA Lv' oA
wt W* GeB COB
t GOA. NoA
aA �tA
C
Ta YVW G'58 A Go
Rb G Ly
cl, StA AFA UcB
0
ww -Ww StA a
wt
Ch Ch GOA N
G A
Bb
Ww
GOA
w NG8
GoA
AA Ch
UCB
wvv
NoA
NoB
C
h GeS GeB
AaA
Bb NOB
Ww AaA _j
__A A No[
GeB Ww Ud NoB 0-4
Ch Ta
"4w
co GeD
Le
Ww
Ww
Ww
Ch
Ww
RATR Ta StA
ww-
Ch ?; AsA
,,A Ch
Le Ww
A
Ch
VJW c____