Loading...
HomeMy WebLinkAboutSW3200401_17031-PH2 SD EC Calcs 3-11-2020_20200612 STORM DRAINAGE AND EROSION CONTROL CALCULATIONS VILLAGE AT GRANITE QUARRY - PHASE 2 Granite Quarry, Rowan County, North Carolina Prepared for: LGI HOMES Contact: Jeff Webb 3037 Sherman Drive Lancaster, SC P. 844-566-4300 Prepared by: DPR Associates, Inc. 420 Hawthorne Lane Charlotte, NC 28204 P. 704-332-1204 F. 704-332-1210 www.dprassociates.net DPR Project No.: 17031 August 22, 2019 March 11, 2020 3-11-2020 ______________________ _____________________ DPR Associates, Inc. Hy V. Nguyen, PE DPR ASSOCIATESGrate Drop Inlet CalculationsWeir FlowOrifice Flow:Structure #: Drainage Area (ac) Runoff CoefficientRainfall Intensity (in/hr)Q25 (cfs) UNLESS NOTEDWeir Coefficient (Cw):Length of Weir (ft)Height of Water Buildup (ft):Coefficient of Discharge Grate Slot Length (in):Grate Slot Width (in)Grate Slot NumberArea of Flow (sf):Height of Water Buildup (ft):Maximum Height of Water YEAR STORM7-101 0.50 0.5 7.67 2.11 3 100.170.6 16.5 2 16 3.670.01 0.17 (ft)25 yr. 5 min.7-102 0.50 0.5 7.67 2.11 3 100.170.6 16.5 2 16 3.670.01 0.17 (ft)25 yr. 5 min.7-103 0.50 0.5 7.67 2.11 3 100.170.6 16.5 2 16 3.670.01 0.17 (ft)25 yr. 5 min.7-104 0.30 0.5 7.67 1.27 3 100.120.6 16.5 2 16 3.670.01 0.12 (ft)25 yr. 5 min.7-105 0.40 0.5 7.67 1.69 3 100.150.6 16.5 2 16 3.670.01 0.15 (ft)25 yr. 5 min.7-106 0.40 0.5 7.67 1.69 3 100.150.6 16.5 2 16 3.670.01 0.15 (ft)25 yr. 5 min.7-107 0.40 0.5 7.67 1.69 3 100.150.6 16.5 2 16 3.670.01 0.15 (ft)25 yr. 5 min.7-216 0.50 0.5 7.67 2.11 3 100.170.6 16.5 2 16 3.670.01 0.17 (ft)25 yr. 5 min.7-217 0.60 0.5 7.67 2.53 3 100.190.6 16.5 2 16 3.670.02 0.19 (ft)25 yr. 5 min.7-218 0.40 0.5 7.67 1.69 3 100.150.6 16.5 2 16 3.670.01 0.15 (ft)25 yr. 5 min.7-219 0.50 0.5 7.67 2.11 3 100.170.6 16.5 2 16 3.670.01 0.17 (ft)25 yr. 5 min.7-207 0.30 0.5 7.67 1.27 3 100.120.6 16.5 2 16 3.670.01 0.12 (ft)25 yr. 5 min.7-309 0.20 0.5 7.67 0.84 3 100.090.6 16.5 2 16 3.670.00 0.09 (ft)25 yr. 5 min.7-310 0.70 0.5 7.67 2.95 3 100.210.6 16.5 2 16 3.670.03 0.21 (ft)25 yr. 5 min.7-314 0.40 0.5 7.67 1.69 3 100.150.6 16.5 2 16 3.670.01 0.15 (ft)25 yr. 5 min.7-315 0.60 0.5 7.67 2.53 3 100.190.6 16.5 2 16 3.670.02 0.19 (ft)25 yr. 5 min.7-316 0.50 0.5 7.67 2.11 3 100.170.6 16.5 2 16 3.670.01 0.17 (ft)25 yr. 5 min.7-317 0.40 0.5 7.67 1.69 3 100.150.6 16.5 2 16 3.670.01 0.15 (ft)25 yr. 5 min.7-329 0.60 0.5 7.67 2.53 3 100.190.6 16.5 2 16 3.670.02 0.19 (ft)25 yr. 5 min.7-333 0.50 0.5 7.67 2.11 3 100.170.6 16.5 2 16 3.670.01 0.17 (ft)25 yr. 5 min.7-336A 0.60 0.5 7.67 2.53 3 100.190.6 16.5 2 16 3.670.02 0.19 (ft)25 yr. 5 min.7-336B 0.40 0.5 7.67 1.69 3 100.150.6 16.5 2 16 3.670.01 0.15 (ft)25 yr. 5 min.7-337 0.40 0.5 7.67 1.69 3 100.150.6 16.5 2 16 3.670.01 0.15 (ft)25 yr. 5 min.7-338 0.40 0.5 7.67 1.69 3 100.150.6 16.5 2 16 3.670.01 0.15 (ft)25 yr. 5 min.7-339 0.40 0.5 7.67 1.69 3 100.150.6 16.5 2 16 3.670.01 0.15 (ft)25 yr. 5 min.7-340A 0.30 0.5 7.67 1.27 3 100.120.6 16.5 2 16 3.670.01 0.12 (ft)25 yr. 5 min.T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2 SD Inlet Drop GratePlotted 3/11/2020Sheet: 1 of 2 DPR ASSOCIATESGrate Drop Inlet CalculationsWeir FlowOrifice Flow:Structure #: Drainage Area (ac) Runoff CoefficientRainfall Intensity (in/hr)Q25 (cfs) UNLESS NOTEDWeir Coefficient (Cw):Length of Weir (ft)Height of Water Buildup (ft):Coefficient of Discharge Grate Slot Length (in):Grate Slot Width (in)Grate Slot NumberArea of Flow (sf):Height of Water Buildup (ft):Maximum Height of Water YEAR STORM7-340C 0.60 0.5 7.67 2.53 3 100.190.6 16.5 2 16 3.670.02 0.19 (ft)25 yr. 5 min.8-201 0.30 0.5 7.67 1.27 3 100.120.6 16.5 2 16 3.670.01 0.12 (ft)25 yr. 5 min.8-202 0.10 0.5 7.67 0.42 3 100.060.6 16.5 2 16 3.670.00 0.06 (ft)25 yr. 5 min.8-203 0.30 0.5 7.67 1.27 3 100.120.6 16.5 2 16 3.670.01 0.12 (ft)25 yr. 5 min.8-204 0.20 0.5 7.67 0.84 3 100.090.6 16.5 2 16 3.670.00 0.09 (ft)25 yr. 5 min.8-205 0.20 0.5 7.67 0.84 3 100.090.6 16.5 2 16 3.670.00 0.09 (ft)25 yr. 5 min.8-206 0.30 0.5 7.67 1.27 3 100.120.6 16.5 2 16 3.670.01 0.12 (ft)25 yr. 5 min.8-211 0.20 0.5 7.67 0.84 3 100.090.6 16.5 2 16 3.670.00 0.09 (ft)25 yr. 5 min.8-212 0.30 0.5 7.67 1.27 3 100.120.6 16.5 2 16 3.670.01 0.12 (ft)25 yr. 5 min.T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2 SD Inlet Drop GratePlotted 3/11/2020Sheet: 2 of 2 DPR ASSOCIATES Design of Slab Inlets Structure #:7-318 (slap type) NCDOT 840.04 Drainage Area (ac): 1.50 18" RCP Runoff Coefficient (c): 0.5 Rainfall Intensity (in/hr): 7.67 Q25 (cfs): 6.3 Weir Flow: Weir Coefficient (Cw): 3.0 (Cw=3.0 for free overfall) Length of Weir (ft): 11.5 (Length of Drop Inlet opening) Height of Water Buildup (ft): 0.32 Orifice Flow: Coefficient of Discharge (Cd): 0.6 (Cd=0.6 typical) Orifice opening height (in): 6.0 Area of Flow (sf): 5.75 Acceleration of Gravity: 32.2 Height of Water Buildup (ft): 0.05 Maximum Height of Water Buildup = 0.32 (ft) T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2 SD Inlet SlabPlotted 3/11/2020 Sheet: 1 of 1 Project: Granite Quarry DPR Job No.: 17031 Location: Granite Quarry, NC DPR ASSOCIATES Riser Basin Design Worksheet (per NCDEHNR Design Manual) Prepared by:MPB Checked by: HVN Date: 10-19-17 Riser Sediment Basin w/ Skimmer #7 (NCDENR- Erosion Control # 6.64) Pre-Development Drainage Area "A" (ac) = 5.5 Runoff Coefficient, Pre Dev (C) = 0.30 (After demoliation, Seeded condition) Rainfall Intensity "I" (in/hr) = 7.24 (for 5 min time of concentration) Flow "Q10" (cfs) =11.9 (Q10=C*I*A) Post-Development Drainage Area "A" (ac) = 26.0 Runoff Coefficient, Post Dev (C) = 0.60 Rainfall Intensity "I" (in/hr) = 7.24 (for 5 min time of concentration) Flow "Q10" (cfs) =112.9 (Q10=C*I*A) Designed Flow "Q10" =112.9 cfs Elevation Storage Required (cf) =46,800 (V = 1,800 sf per acre of drainage areas ) Storage Provided =50,000 720.0 (measured @ storage depth) Surface Area Required (sf) =36,707 (325 sf per cfs) Surface Area Provided =34,900 729.2 (measure @ spillway) Storage Dimensions: Basin Side Slopes ( x : 1 ) =2.0 Storage Depth "H" (ft) =6.0 Bottom Dimension =714.0 (See Erosion Control plan, Sediment Storage Dimension at "H" =for actual basin areas and storage provided) Top of Embankment Dimension =729.2 Use the larger of the two conditions Use Permanent BMP Outlet Structure and Spillway. See BMP Plans & Calcs T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2-EC Basins.xlsPlotted 8/16/2018 Sheet: 1 of 2 Project: Granite Quarry DPR Job No.: 17031 Location: Granite Quarry, NC DPR ASSOCIATES Riser Basin Design Worksheet (per NCDEHNR Design Manual) Prepared by:MPB Checked by: HVN Date: 10-19-17 Riser Sediment Basin w/ Skimmer #7 (NCDENR- Erosion Control # 6.64) Skimmer Max. Capacity Size w/out Orifice (cf)24 hrs 2 days 5 days 7 days 1 1/2" skimmer 1,728 3,456 8,640 12,096 2" skimmer 3,283 6,566 16,415 22,981 2 1/2" skimmer 6,234 12,468 31,170 43,638 3" skimmer 9,774 19,548 48,870 68,418 4" skimmer 20,109 40,218 100,545 140,763 5" skimmer 32,832 65,664 164,160 229,824 6" skimmer 51,840 103,680 259,200 362,880 Factors (CF of flow per square inch of opening through a round orifice for the draw down times shown) 24 hrs 2 days 5 days 7 days 1 1/2" skimmer 960 1,920 4,800 6,720 2" skimmer 1,123 2,246 5,615 7,861 2 1/2" skimmer 1,270 2,540 6,350 8,890 3" skimmer 1,382 2,764 6,910 9,674 4" skimmer 1,601 3,202 8,005 11,207 5" skimmer 1,642 3,284 8,210 11,494 6" skimmer 1,814 3,628 9,070 12,698 Draw down time:24 hr 2 days 5 days 7 days Volume Area (in^2)Area (in^2)Area (in^2)Area (in^2) A = pi x d^2 / 4 , d = sq.rt.(A*4/pi)10-yr (cf)Orifice Dia. (in)Orifice Dia. (in)Orifice Dia. (in)Orifice Dia. (in) Try 1 1/2" Skimmer 46,800 48.75 24.38 9.75 6.96 7.88 5.57 3.52 2.98 Try 2" Skimmer 46,800 41.67 20.84 8.33 5.95 7.28 5.15 3.26 2.75 Try 2 ½" Skimmer 46,800 36.85 18.43 7.37 5.26 6.85 4.84 3.06 2.59 Try 3" Skimmer 46,800 33.86 16.93 6.77 4.84 6.57 4.64 2.94 2.48 Try 4" Skimmer 46,800 29.23 14.62 5.85 4.18 Use 4.0" Skimmer w/ 4.0" Dia. Orifice 6.10 4.31 2.73 2.31 Try 5" Skimmer 46,800 28.50 14.25 5.70 4.07 6.02 4.26 2.69 2.28 Try 6" Skimmer 46,800 25.80 12.90 5.16 3.69 5.73 4.05 2.56 2.17 Faircloth Skimmer Orifice Design (Information taken from J. W. Faircloth & Son, Inc Literature, Revision November 2007 ) T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2-EC Basins.xlsPlotted 8/16/2018 Sheet: 2 of 2 Project: Granite Quarry DPR Job No.: 17031 Location: Granite Quarry, NC DPR ASSOCIATES Riser Basin Design Worksheet (per NCDEHNR Design Manual) Prepared by:MPB Checked by: HVN Date: 10-19-17 Riser Sediment Basin w/ Skimmer #8 (NCDENR- Erosion Control # 6.64) Pre-Development Drainage Area "A" (ac) = 3.0 Runoff Coefficient, Pre Dev (C) = 0.30 (After demoliation, Seeded condition) Rainfall Intensity "I" (in/hr) = 7.24 (for 5 min time of concentration) Flow "Q10" (cfs) =6.5 (Q10=C*I*A) Post-Development Drainage Area "A" (ac) = 6.5 Runoff Coefficient, Post Dev (C) = 0.60 Rainfall Intensity "I" (in/hr) = 7.24 (for 5 min time of concentration) Flow "Q10" (cfs) =28.2 (Q10=C*I*A) Designed Flow "Q10" =28.2 cfs Elevation Storage Required (cf) =11,700 (V = 1,800 sf per acre of drainage areas ) Storage Provided =20,750 734.0 (measured @ storage depth) Surface Area Required (sf) =9,177 (325 sf per cfs) Surface Area Provided =13,000 736.0 (measure @ spillway) Storage Dimensions: Basin Side Slopes ( x : 1 ) =3.0 Storage Depth "H" (ft) =3.0 Bottom Dimension =731.0 (See Erosion Control plan, Sediment Storage Dimension at "H" =for actual basin areas and storage provided) Top of Embankment Dimension =737.0 Use the larger of the two conditions Use Permanent BMP Outlet Structure and Spillway. See BMP Plans & Calcs T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2-EC Basins.xlsPlotted 8/16/2018 Sheet: 1 of 2 Project: Granite Quarry DPR Job No.: 17031 Location: Granite Quarry, NC DPR ASSOCIATES Riser Basin Design Worksheet (per NCDEHNR Design Manual) Prepared by:MPB Checked by: HVN Date: 10-19-17 Riser Sediment Basin w/ Skimmer #8 (NCDENR- Erosion Control # 6.64) Skimmer Max. Capacity Size w/out Orifice (cf)24 hrs 2 days 5 days 7 days 1 1/2" skimmer 1,728 3,456 8,640 12,096 2" skimmer 3,283 6,566 16,415 22,981 2 1/2" skimmer 6,234 12,468 31,170 43,638 3" skimmer 9,774 19,548 48,870 68,418 4" skimmer 20,109 40,218 100,545 140,763 5" skimmer 32,832 65,664 164,160 229,824 6" skimmer 51,840 103,680 259,200 362,880 Factors (CF of flow per square inch of opening through a round orifice for the draw down times shown) 24 hrs 2 days 5 days 7 days 1 1/2" skimmer 960 1,920 4,800 6,720 2" skimmer 1,123 2,246 5,615 7,861 2 1/2" skimmer 1,270 2,540 6,350 8,890 3" skimmer 1,382 2,764 6,910 9,674 4" skimmer 1,601 3,202 8,005 11,207 5" skimmer 1,642 3,284 8,210 11,494 6" skimmer 1,814 3,628 9,070 12,698 Draw down time:24 hr 2 days 5 days 7 days Volume Area (in^2)Area (in^2)Area (in^2)Area (in^2) A = pi x d^2 / 4 , d = sq.rt.(A*4/pi)10-yr (cf)Orifice Dia. (in)Orifice Dia. (in)Orifice Dia. (in)Orifice Dia. (in) Try 1 1/2" Skimmer 11,700 12.19 6.09 2.44 1.74 3.94 2.79 1.76 1.49 Try 2" Skimmer 11,700 10.42 5.21 2.08 1.49 Use 2.0" Skimmer w/ 2.0" Dia. Orifice 3.64 2.58 1.63 1.38 Try 2 ½" Skimmer 11,700 9.21 4.61 1.84 1.32 3.42 2.42 1.53 1.29 Try 3" Skimmer 11,700 8.47 4.23 1.69 1.21 3.28 2.32 1.47 1.24 Try 4" Skimmer 11,700 7.31 3.65 1.46 1.04 3.05 2.16 1.36 1.15 Try 5" Skimmer 11,700 7.13 3.56 1.43 1.02 3.01 2.13 1.35 1.14 Try 6" Skimmer 11,700 6.45 3.22 1.29 0.92 2.87 2.03 1.28 1.08 Faircloth Skimmer Orifice Design (Information taken from J. W. Faircloth & Son, Inc Literature, Revision November 2007 ) T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2-EC Basins.xlsPlotted 8/16/2018 Sheet: 2 of 2 Project: Granite Quarry DPR Job No.: 17031 Location: Granite Quarry, NC DPR ASSOCIATES Riser Basin Design Worksheet (per NCDEHNR Design Manual) Prepared by:MPB Checked by: HVN Date: 10-19-17 Temporary Sediment Trap #9 (NCDENR- Erosion Control # 6.60) Pre-Development Drainage Area "A" (ac) = 2.5 Runoff Coefficient, Pre Dev (C) = 0.30 (After demoliation, Seeded condition) Rainfall Intensity "I" (in/hr) = 7.24 (for 5 min time of concentration) Flow "Q10" (cfs) =5.4 (Q10=C*I*A) Elevation Storage Required (cf) =4,500 (V = 1,800 sf per acre of drainage areas ) Storage Provided =4,050 734.0 (measured @ storage depth) Surface Area Required (sf) =1,765 (325 sf per cfs) Surface Area Provided =2,000 734.5 (measure @ spillway) Storage Dimensions: Basin Side Slopes ( x : 1 ) =2.0 Storage Depth "H" (ft) =3.0 Bottom Dimension =731.0 (See Erosion Control plan, Sediment Storage Dimension at "H" =for actual basin areas and storage provided) Top of Embankment Dimension =736.0 Spillway Length "L" (ft) =5.0 (Cw=3.0) Spillway Crest Elevation "H" (ft) =3.5 734.5 (6" min. above storage depth) Design High Water Depth "D" (ft) =0.5 735.0 (0.5 ft maximum) Freeboard "F" (ft) =1.0 (1 ft minimum) Dam Depth (ft) =5.0 736.0 (Top of Basin Elevation) T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2-EC Basins.xlsPlotted 8/16/2018 Sheet: 1 of 1 Project: Granite Quarry DPR Job No.: 17031 Location: Granite Quarry, NC DPR ASSOCIATES Riser Basin Design Worksheet (per NCDEHNR Design Manual) Prepared by:MPB Checked by: HVN Date: 10-19-17 Temporary Sediment Trap #10 (NCDENR- Erosion Control # 6.60) Pre-Development Drainage Area "A" (ac) = 5.0 Runoff Coefficient, Pre Dev (C) = 0.30 (After demoliation, Seeded condition) Rainfall Intensity "I" (in/hr) = 7.24 (for 5 min time of concentration) Flow "Q10" (cfs) =10.9 (Q10=C*I*A) Elevation Storage Required (cf) =9,000 (V = 1,800 sf per acre of drainage areas ) Storage Provided =9,350 731.0 (measured @ storage depth) Surface Area Required (sf) =3,530 (325 sf per cfs) Surface Area Provided =4,100 731.0 (measure @ spillway) Storage Dimensions: Basin Side Slopes ( x : 1 ) =2.0 Storage Depth "H" (ft) =3.0 Bottom Dimension =728.0 (See Erosion Control plan, Sediment Storage Dimension at "H" =for actual basin areas and storage provided) Top of Embankment Dimension =733.0 Spillway Length "L" (ft) =10.0 (Cw=3.0) Spillway Crest Elevation "H" (ft) =3.5 731.5 (6" min. above storage depth) Design High Water Depth "D" (ft) =0.5 732.0 (0.5 ft maximum) Freeboard "F" (ft) =1.0 (1 ft minimum) Dam Depth (ft) =5.0 733.0 (Top of Basin Elevation) T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2-EC Basins.xlsPlotted 8/16/2018 Sheet: 1 of 1 Project: Granite Quarry DPR Job No.: 17031 Location: Granite Quarry, NC DPR ASSOCIATES Riser Basin Design Worksheet (per NCDEHNR Design Manual) Prepared by:MPB Checked by: HVN Date: 10-19-17 Temporary Sediment Trap #11 (NCDENR- Erosion Control # 6.60) Pre-Development Drainage Area "A" (ac) = 8.5 Runoff Coefficient, Pre Dev (C) = 0.30 (After demoliation, Seeded condition) Rainfall Intensity "I" (in/hr) = 7.24 (for 5 min time of concentration) Flow "Q10" (cfs) =18.5 (Q10=C*I*A) Elevation Storage Required (cf) =15,300 (V = 1,800 sf per acre of drainage areas ) Storage Provided =16,105 726.0 (measured @ storage depth) Surface Area Required (sf) =6,000 (325 sf per cfs) Surface Area Provided =6,600 726.5 (measure @ spillway) Storage Dimensions: Basin Side Slopes ( x : 1 ) =2.0 Storage Depth "H" (ft) =3.0 Bottom Dimension =723.0 (See Erosion Control plan, Sediment Storage Dimension at "H" =for actual basin areas and storage provided) Top of Embankment Dimension =728.0 Spillway Length "L" (ft) =16.0 (Cw=3.0) Spillway Crest Elevation "H" (ft) =3.5 726.5 (6" min. above storage depth) Design High Water Depth "D" (ft) =0.5 727.0 (0.5 ft maximum) Freeboard "F" (ft) =1.0 (1 ft minimum) Dam Depth (ft) =5.0 728.0 (Top of Basin Elevation) T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2-EC Basins.xlsPlotted 8/16/2018 Sheet: 1 of 1 Project: Granite Quarry DPR Job No.: 17031 Location: Granite Quarry, NC DPR ASSOCIATES Riser Basin Design Worksheet (per NCDEHNR Design Manual) Prepared by:MPB Checked by: HVN Date: 10-19-17 Temporary Sediment Trap #12 (NCDENR- Erosion Control # 6.60) Pre-Development Drainage Area "A" (ac) = 5.0 Runoff Coefficient, Pre Dev (C) = 0.30 (After demoliation, Seeded condition) Rainfall Intensity "I" (in/hr) = 7.24 (for 5 min time of concentration) Flow "Q10" (cfs) =10.9 (Q10=C*I*A) Elevation Storage Required (cf) =9,000 (V = 1,800 sf per acre of drainage areas ) Storage Provided =9,100 728.0 (measured @ storage depth) Surface Area Required (sf) =3,530 (325 sf per cfs) Surface Area Provided =3,900 728.5 (measure @ spillway) Storage Dimensions: Basin Side Slopes ( x : 1 ) =2.0 Storage Depth "H" (ft) =3.0 Bottom Dimension =725.0 (See Erosion Control plan, Sediment Storage Dimension at "H" =for actual basin areas and storage provided) Top of Embankment Dimension =730.0 Spillway Length "L" (ft) =10.0 (Cw=3.0) Spillway Crest Elevation "H" (ft) =3.5 728.5 (6" min. above storage depth) Design High Water Depth "D" (ft) =0.5 729.0 (0.5 ft maximum) Freeboard "F" (ft) =1.0 (1 ft minimum) Dam Depth (ft) =5.0 730.0 (Top of Basin Elevation) T:\PROJECTS\2017 PROJECTS\17031 The Village At Granite - LGI\PHASE 2\CALCS\STORM & EC\17031-PH2-EC Basins.xlsPlotted 8/16/2018 Sheet: 1 of 1