Loading...
HomeMy WebLinkAboutNC0049867_Headworks Analysis_20200615 Town of Cleveland 302 East Main Street P.O. Box 429 Cleveland,NC 27013 (704)278-4777 June 10,2020 RECEIVED JUN 15 2020 Mr. Monti Hassan NCDEQ/DWRJNPDES NCDENR Division of Water Resources 1617 Mail Service Center Raleigh,NC 27669-1617 Subject: Revised STMP 2020 Dear Mr. Hassan: Enclosed please find a copy of the revised Short Term Monitoring Plan for the Town of Cleveland. The plan was revised to reflect current detection concentration changes as noted in the Practical Quantitation handout. Please contact myself or our pretreatment coordinator, Barbara Sifford, with any questions you may have. I can be reached at 704-278-4777 and Ms.Sifford can be reached at 704-279- 8252 or by email at legacy2007(a�windstream.net. Sincerely, Patrick Phifer Mayor Enc Town of Cleveland Headworks Short Term Monitoring Plan A. Sampling Points(Table 2) I -Influent-prior to mixing with side streams-using regular composite sample collected for NPDES monitoring and STMP sampling 2 -Effluent-after all treatment including dechlorination-use regular composite sample collected for NPDES monitoring and STMP sampling 3 -Activated Sludge Basin—garb samples taken from each of the two aeration basins 4 -Sludge to Disposal- sample sludge going to final disposal at land application site 5 - SIUs—locations described in IUPs,at present only one SIU is releasing to the Town B. Pollutants of Concern(POC): NPDES-POTW NPDES Permit limit Sludge-40 CFR 503 Sludge Land Application EPA-EPA Required IUP- SIU Industrial User Permit Limit Table I Parameter POC NPDES 40 CFR 503 Sludge EPA,NC SIU List Required Required Required Limitec Pollutants Pollutants Pollutants Pollutan with limits BOD X X X TSS X X X NH3N X X X X Cd X X X X Cr X X X X cu X X X X TCN X X X X X X X X X X X X X X X X X X X X X X P age Town of Cleveland Headworks Short Term Monitoring Plan Zn X X X X Flow X X X X X X X C.Flow The monitoring points are illustrated on table 1. The effluent flow is monitored and recorded during each sampling event and is used for all flow calculations in the Headworks Calculation. Flow for the sludge to disposal is determined from the sludge taken from the digestor basin to be land applied. These numbers are provided by the contract land application operator and are recorded in the annual land application report. D. S1U Monitoring Pollutant Influent Effluent Aeration Sludge SIUs Uncontrollable BOD TSS Cd Cr cu Pb Se P age Town of Cleveland Headworks Short Term Monitoring Plan Zn Flow %solids Significant Industrial User(ISU)Monitoring is conducted according to the permit issued to each SIU. Data collected by both the POTW and the SIU's self-monitoring samples is used. The frequency of the SIU sampling is conducted in accordance with the permit issued to the SIU. E. STMP Sampling Frequency: Table 2 Sam ling Point 18 Months Prior to HWA Due Date 1 .influent Quarterly on a Workday and per NPDES requirement 2 .Effluent Quarterly on a Workday and per NPDES requirement 3. Activated Sludge Basins Once per basin 4. Sludge to disposal Per Land Application Permit 5 -SIU s Quarterly Per SIU Permit And POC's once 6—Uncontrollable Determined Quarterly(Influent minus SIU) F. Sampling Plan G.Detection Level and Sample Method P.O.C. Detection Level mg/1 * Sample Method** BOD 2 24hr Composite TSS 2.5 24 hr Composite NH3 as N 0.1 24 hr Composite 0.01 Cd 0.0005 24 hr Composite Cr 0.010 24 hr Composite Cu 0.002 24 hr Composite CN 0.005 Grab P age Town of Cleveland Headworks Short Term Monitoring Plan H-effluent I n I(method 1631 Grab Hg-all other 0.0002 (method 24 hr Composite locations 245. Zn 0.01 24 hr Composite Oil&Grease 5 Grab Sampling,preservation,and analytical method must be from 40 CFR 136. * Graphite Furnace Determinations are required to attain the desired detection level for the metals.However,analysis of Aeration Basin and Sludge to Disposal samples often cannot meet these detection levels. In this case,analysis of these samples must obtain a detection level at least as stringent as the applicable inhibition criteria or sludge ceiling standard. ** All Aeration Basin and Sludge to Disposal samples will be grab. • *** Mercury for the Effluent will be analyzed by method 1631.All other sampling points will measure Mercury by method number 3112B. P age Town of Cleveland Headworks Short Term Monitoring Plan H. WWTP Diagram Uncontrollabl O Industrial O Infl entoigester '� Aerobic Supernatant Digester Bar Screen _ putter Box I ` Sludge o waste 3 AB 1 J p AB2 ' Clarifier 1 ► Clarifier 2 Chlorine-Dechlor J Sampling Points Parshal 1. Influent(prior to all Side streams!) Flume 2. Effluent(after d €h1I®fination) 3. Activated Sludge&il§Ins ABI &AB2 4. Sludge to Disposal 5. Industrial 6. Uncontrollable Sludge to Disnosal