HomeMy WebLinkAboutNC0000396_Compliance Evaluation Inspection_20200616DocuSign Envelope ID: E10EB967-20F9-4D58-A973-449FCCECCBF5
STA�44���
ROY COOPER
Governor
M[GHAEL 5_ REGAN
Secretary
S. DANIEL SMITH
NORTH CAROLINA
R[rector
En vixonrnen tat Quality
June 16, 2020
Teresa Williams, Lead Environmental Field Specialist
Duke Energy Progress LLC
46 Duke Energy Lane
Arden, NC 28704
SUBJECT: Compliance Inspection Report
Asheville Steam Electric Power Plant
NPDES WW Permit No. NC0000396
Buncombe County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Asheville Electric
Power Plant on 6/11/2020. This inspection was conducted to verify that the facility is operating in
compliance with the conditions and limitations specified in NPDES WW Permit No. NC0000396. The
findings and comments noted during this inspection are provided in the enclosed copy of the inspection
report entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact me with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
tim.heim@ncdenr.gov.
Sincerely,
ocuSigned by:
[�DKI
a�uVA
82B1105A3CA418...
Tim Heim, P.E., Environmental Engineer
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS
Ec: LF
µ.. D�� Narth:aro:r.a Departrrrnt of Enwron rrerta �vai3y I Dmavnof Water Beeouro=--a
-C, `���' Asheville Reg-10ff- 12090 U.S. 79lfth ay I Swanrtsrtoa, North Ca ;. 29778
V =-196-0500