Loading...
HomeMy WebLinkAboutNC0000396_Compliance Evaluation Inspection_20200616DocuSign Envelope ID: E10EB967-20F9-4D58-A973-449FCCECCBF5 STA�44��� ROY COOPER Governor M[GHAEL 5_ REGAN Secretary S. DANIEL SMITH NORTH CAROLINA R[rector En vixonrnen tat Quality June 16, 2020 Teresa Williams, Lead Environmental Field Specialist Duke Energy Progress LLC 46 Duke Energy Lane Arden, NC 28704 SUBJECT: Compliance Inspection Report Asheville Steam Electric Power Plant NPDES WW Permit No. NC0000396 Buncombe County Dear Permittee: The North Carolina Division of Water Resources conducted an inspection of the Asheville Electric Power Plant on 6/11/2020. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0000396. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". There were no significant issues or findings noted during the inspection and therefore, a response to this inspection report is not required. If you should have any questions, please do not hesitate to contact me with the Water Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at tim.heim@ncdenr.gov. Sincerely, ocuSigned by: [�DKI a�uVA 82B1105A3CA418... Tim Heim, P.E., Environmental Engineer Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ ATTACHMENTS Ec: LF µ.. D�� Narth:aro:r.a Departrrrnt of Enwron rrerta �vai3y I Dmavnof Water Beeouro=--a -C, `���' Asheville Reg-10ff- 12090 U.S. 79lfth ay I Swanrtsrtoa, North Ca ;. 29778 V =-196-0500