Loading...
HomeMy WebLinkAboutWQ0041696_Application (FTSE)_20200511r1 ( State of North Caroline Department of Environmental Quality W Division of Water Resources -` --�- ` s 1SA NCAC 02T -0300 — FAST TRACK SEER SYSTEM EXTENSION APPLICATION 9DIVISlon of hiller Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number. L✓ (to be enmotted by MR) All Itsms must b"ompleted Or the a u e r red I. APPLICANT INFORMATION: 1. Applicanes name: cill Qf Sanford (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation 0 General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Weeks, E per I M NCAC 02T. I d Tide: it E ittctr M 4. Applicant's mailing address: 725 E. Wca&rsyooa Sueet o IF City: Unford State: iC Zip:t 3T.�Q _ 5. Applicant's contact information.. a o � Phone number. ice) 2U-$Q1R Email Address: Pa 1.W e f net El o 13. PROJECT INFORMATION: , I. Project came: T wa c> 2. Application/11mject status: ® Proposed (New Permit) Q Existing Permit/Project If a modification, provide the existing permit number. WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number. WQ00 3. County where project is located: Lee 4. Approximate Coordinates (Decimal Degrees): Latitude; 35.4388 Longitude:-7L2IM3 S. Parcel ID (if applicable): 2011I 29 M (or Parcel ID to closest downstream sewer) M. CONSULTANT INFORMATION: 1. Professional Engineer. ! fflfFFoster, P£ License Number. 028291 Firm: CEQMVpbr Mailing address; 301 010GEWd Read, u' 220 City: $atralr State: K Zip: 27603 Phone number. a 9} W7_M Email Address: Ieff(4cerinauninc.enm IV. WASTEWATER TREATMENT FACII,ITY (WWTF) INFORMATION: I. Facility Name: City gf SggfoW Permit Number NCO024147 Owner Name: gjty of Sanford V. RECEIVING DOWNSTREAM SEWER INFORMATION (if differeat than WWTF): 1. Permit Number(s): WQ— Downstream (Receiving) Sewer Size: $ inch SYSM Wt it 'u if gpRl cable): WQCs OwnerName(s): City of Sanford FORM. FTA 04-16 Pagel of 5 VL GENERAL REQUIItEMFNTS L If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attacbed? ❑ Yes ONO ®N A 2. If the Applicant is a Developer of lots to be sold, has a 12evelooer's Oaerst' a[ Aareemrnt fFOtZM L1EV) bean attached? ❑ Yes [:]No ON A 3. If the Applicant is a erati a been. attached? 0 Yes ONO [DNA 4. Origin of wastewater. (check all that apply): ❑ Residential Owned 0 Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ® Retail with food prepamdou/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical! dental; veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: Domestic Commercial W Commercial % Industrial(See 1 AC OI qA= --0,Is there a Pretreatment Program in of%ct7 ❑Yes ®No 6. Has a flow reduction been approved under I-5A N&AC 2 14 ? ❑ Yes ® No D lfves, provide 01,921 gw r uc.gon aoprgval setter 7. Summarize wastewater generated by project; Estabilshment Type (see 02T.Q 114 Retail Business Restaurant Full Service Daily Design Flow °-b No, of Uttlts Flow 100 gal/1000 sf 1 11.8 1 1200 GPD 40 gal/seat gal/ gall gall gal/ 24 Total 960 GPD GPD GPD GPD GPD 2160 GPD a See 1 A i l4 a e%J,)" for caveats to wastewater design flow rates (i.e., minimum flow r dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential prop" located south or cast of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42 . b Per 15A NCAC 02T .Ol 14(c), design flow rates for establishments not identified (in table 15.A NCA_Cshall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. Wastewater generated by project: 2,M GPD (per I LA KAQ OZT .0114) >a Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why; ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Perrait Number. ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain); FORM; FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (Ii Applicable) - 02T.0305 & NEDC (!Qtavirvwen : L Summarize gravitysewer to be permitted: Size (inches) Length (feet) Material 8 270 SDR 21 PVC D Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria D Section III contains information related to minimum slopes for gravity sewer(s) D Oversizing lines to meet minimum slope requirement Is not allowed and a vfalation or the MDC VE9. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .03U5 & om tati ore airy : CONTLUTE FOR EACH PUM STATION INCL IN THUS PRO,UECT i - Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: -� 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational points) of the pump(s): gallons per minute at feet total dynamic head [UD10 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T A305fh?f 11: El Standby power source orpuwith automatic wautomatic activation and telemetry - ISA NCAC 02T .0305(h)(1)(H): D Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily now less than 15,000 gallons per day ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): > It shall be demonstrated to the Division that the portable source is owned or contacted by the applicant (draft agreement) and is compatible with the station. D If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations, storage capacities and the rotation scbedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FfA 04-16 Page 3 of 5 DL SETBACKS & SEPARATIONS — (o2B .0200 & 15A NCAC 02T .0305(Q): 1. Does the project comply with AU separations found in 15A NCAQ 02T .0305 f1 & fat r contains alternatives where separations in 02T.0305( f) cannot be achieved. D •'Stream classifications can be identified using the Division's NC S Foo-Water Classifications w > If noncompliance with (12LMO(() Or W see Section X of this application ® Yes 0 No 2. Roes the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes > Seethe Division's draft aeparation requirements for situations where separation cannot be meet Cl N0 ®N A D No variance is required if the alternative design criteria specified is utilized io design and construction > As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15 0213.02097 ❑ Yes [:)No Z M A > 'This would include Trout Buffered Streams per I SA NCAC 2l3 202 4. Does the project require coverage authonzation under it 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? > Information cube obtained from the AM & Buffer Permittingpranch 5. Does project comply with 15A ZAC 02 LQJQ2_cM(additional permitvicertificstions)? ® Yes ❑ No Per 15A NCAC 02111=0502)(61,directly related environmental permits or certification applications are baing prepared, have been applied for, or have been obtained. issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plaits, etc.). 6• Does this project include any sewer collection lines that are deemed "high -priority?" Per ISA NCAC 02T.0402 "high -priority sewer" means "any eerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑Yes ❑No ®NA > If yes, include an attachment with details for each line, including type (aerial line, size, material, and location), iiilgh priority Imes shall be Inspected by the permlttee or Its repremtadve at least once every WI -months and Inspections documented per 15A NCAC 02T.0403(a)(5) or the permltee's Individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X CERTIFICATIONS: I. Does the submitted system comply with 15A NCAC 02T. the MinitnUrn Dastgn.Criteria for the P and F i t v i and the GnIvity w i C it t vgr3ionI as applicable? to yes ❑ No If No, complete and submit the Variance/Alterastive Design Request application (VADC 10-14) and supporting documents for review. Approval of theUrmuest Is rtgulred. 2ELor to sambatMal orthl Fast Tree...— 2. Professional Engineer's Certification: Engineer's name from 1.) that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the beat of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting Of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, ar certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000, as well as civil penalties up to $25,000 per violation. North Carolina Profenlonal Engineer's seal, signature, and date: ,.•''t`-i►'+ GARO ��'�., REAL 091 x • tt 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, J \1 L �`� attest that this application for (Signature Authority's Ka—d: title Emm An licatinn rem _I has been reviewed by me and is accurate and complete to the best of my knowledge, I understand that if all required parts of this application arc not completed and that if all required supporting documentation and attachments arc not included, this Application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge aystem to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package arc not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — Lo accordance with General Statutes 4 - I A and 143-215.0 any person who knowingly makes any false statement, representation, or certification is any application package shall be guilty of a Class 2 misdemeanor, which may include a fire not to exceed S 10,000 as wal et ' alties up to 525,000 per violation. FORM: FTA 04-16 Page 5 of 5 PROJECT NARRATIVE The proposed Tramway Commercial is located on a+/-1.73 acre portion of an overall +/- 4.98 acre tract within the within the City limits of Sanford. It is located near the northeast corner of the intersection of Jefferson Davis Highway (US Hwy. 1/15/501) and Tramway Road (NC Hwy 78) behind the existing Hardees and The Scrubbin' Board III. The proposed development will consist of approximately 12,000 square feet of retail commercial business with an overall flow rate of 2,160 gpd. The project will be constructed within a single phase and will be served via gravity flow. The remaining +/- 3.25 acres will be developed as a retail use, but the parcel will remain vacant for the present. Below is the calculation of the flow allocation required: Retail Business @ I00 gal / 1000 sf = 1,200 gpd Restaurant Full Service & 40 gal /_seat = 960 gpd Permitted Flow = 2,160 gpd There is an existing 8-inch sanitary sewer main located in the east side shoulder of Jefferson Davis Highway. This will be the proposed connection location. Dept of Enviconmertal Quality �C SJ P g�leigh Regional Office State of North Carolina Department of Environmental Quality Division of Water Resources Dlvtsion of Waier Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: City of Sanford _ Project Name for which flow is being requested: Tramway Commercial More than one FTSE may be required for a single projer! T ehe owner of the WTfTp is not responsible for all pump stations along the route of the proposed wastewater flow. z 1. Complete this section only if you are the owner of the wastewater treatment plant. v a. WWTP Facility Name: City of Sanford Big Buffalo WWTF b. WWTP Facility Permit #: NCO024147 All flows are in MGDg c. WWTP facility's permitted flow 12.00000 0 d. Estimated obligated flow not yet tributary to the WWTP 0.9450 e. WWTP facility's actual avg. flow 5.7330 _ p f. Total flow for this specific request .002160 g. Total actual and obligated flows to the facility 6.6780 ca h. Percent of permitted flow used 55.65% I1. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) ($) (C) (D)a(B+C) (E)-(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow* Current Tributary Flow Plus (Name or Permit Capacity, (Firm p0, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD flow, MGD MGD Flow Capacity'• * The Firm Capacity (design slow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pl) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): CLtX of Sanford Downstream Permit Number: 23960 Page 1 of 6 1~TfiF 10-1 R III. Certification Statement: I Paul M. Weeks Jr. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. to k. Signing Official Signature Date Title of fining OjjkZ Page 2 of 6 FTC F 1 fl_ ] R i eo CE GROUP 301 GLENWO00 AVE SUITE 720 RALEIGH NC 27603 PHONE. 919-367-8790 mvW cegmuoriccam TRAMWA Y COMMERCIAL LEE COUNTY, NC USGS OVERLAY EXHIBIT MA Y 8, 2020 ' 0 VAY RD C5 NORTH 2,000 1.000, 0 2,000, SCALE: 1" = 2,000' x 's X. co C ell L vxw a:• P, 14 i, Ir T V 71 A.- l�CENTER Ck ZLq C7 - lK -0 4 r C) xk LE DR % V 15p, 40 'rool k, rL�-L'THo USF RD eH"KORY r try j:;�%. D - 7- TRAMWAY COMMERCIAL LEE COUNTY, NC v -W--" VICINITYMAP CE GROUP MAY 8, 2020 NORTH 30f GLENMOU AVE SUITE 220 RALEIGH NC 27603 PHONE 919-367-6790 2,000 1,000' 0 2.000' w.v-.vcegmupr nc tom SCALE: 1 2,000' TO: NCDEQ -- DWQ Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 ATTENTION: Permitting — Fast Track Sewer CE GROUP 301 GLENWOOD AVENUE, SUITE 220 RALEIGH, NC 27603 Phone: (919) 367-8790 E-Mall: eff ce rou lnc.com Transmittal DATE. May 5, 2020 PROJECT No• 200-123 Tramway Commercial Sanford, NC REMARKS Please let us know if you require any additional information. CC: CE Group, Inc Signed WSULW11T ICES SINE 99