Loading...
HomeMy WebLinkAbout20200518 Ver 1_Updated Impacts Maps_20200529From: Jeffrey McDermott To: Standridae. Billy W CIV USARMY CESAW (USA) Cc: Scarbraugh, Anthony Subject: [External] RE: SAW-2018-02357 - Albemarle Beach Solar Site - completeness items Date: Friday, May 29, 2020 11:18:52 AM Attachments: imaae001.ona Impacts Map 05292020.pdf Jurisdictional Impacts Drawinas A&A - 05282020.pdf Jurisdictional Impacts Report A&A - 05282020.pdf • External email. Do not click links or open attachments unless you verify. Send all suspicious email as an nt to reaort.spam Billy, Just submitted, but just in case here are the docs. Let me know if the online submission gets to you. Do we need to set up an on -site meeting to review this in the field? Thank You, Jeffrey McDermott I Senior Environmental Specialist 0: (704) 662-0375 C: (704) 618-3854 192 Raceway Drive, Mooresville, NC 28117 www.SunEnergyl.com [sunenergyl.comljeffrey.mcdermottPSunEnergyl.com 4EF41C>EFFr i" CQr ENE-1101L. #r From: Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.Standridge@usace.army.mil> Sent: Friday, May 29, 2020 8:36 AM To: Jeffrey McDermott <jeffrey.mcdermott@sunenergyl.com> Subject: RE: SAW-2018-02357 - Albemarle Beach Solar Site - completeness items Good Morning Jeff, I was going to check into that today to see. I'm assuming that any information submitted through the link he sent you would make it to me as well. Please let me know once you submit it so I can check to make sure I can access it. Thanks, ME Billy W. Standridge Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4595 From: Jeffrey McDermott <Jeffrey.mcdermott(@sunenergyl.com> Sent: Friday, May 29, 2020 8:27 AM To: Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.StandridgePusace.army.mil> Subject: [Non-DoD Source] RE: SAW-2018-02357 - Albemarle Beach Solar Site - completeness items Good Morning Billy, I hope you are doing well today. I have the supplemental information ready to submit for the Albemarle Beach impacts. Do you have a link to submit additional information, or does it go through the same link that Anthony sent to me? Thank You, Jeffrey McDermott Senior Environmental Specialist 0: (704) 662-0375 C: (704) 618-3854 192 Raceway Drive, Mooresville, NC 28117 Blockedwww.SunEnergyl.com Jeffrey.mcdermott(@SunEnerg)ll.com ERA" =" ESl From: Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.Standridge(@usace.army.mil> Sent: Monday, May 18, 2020 9:44 AM To: Jeffrey McDermott <Jeffrey.mcdermott(@sunenerg)ll.com> Cc: Scarbraugh, Anthony<anthony.scarbraugh(@ncdenr.gov>; Pullinger, Robert C <chris.pullinger(@ncdenr.gov> Subject: RE: SAW-2018-02357 - Albemarle Beach Solar Site - completeness items Hi Jeff, The mitigation would be required for the entire amount at a 2:1 ratio. If the project results in a loss of 0.12 acres of wetlands, the required mitigation would be 0.24 non -riparian wetland credits. Thanks, ME Billy W. Standridge Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4595 From: Jeffrey McDermott <Jeffrey.mcdermott(@sunenergyl.com> Sent: Friday, May 15, 2020 11:11 AM To: Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.StaInd ridge(@usace.army.mil> Cc: Scarbraugh, Anthony <anthony.scarbraugh(@ncdenr.gov>; Pullinger, Robert C <chris.pullinger(@ncdenr.gov> Subject: [Non-DoD Source] RE: SAW-2018-02357 - Albemarle Beach Solar Site - completeness items Good Morning Billy, I hope you are well today. I have been given the OK to pay into the mitigation bank, for the impacts at Albemarle Beach. I've minimized the impacts down to .12ac., but that might change slightly, as Mike Morway finishes up the details for the culverts, and road accesses. Does mitigation get paid on the entire impact, or just the impact above the threshold? I appreciate your time. Thank You, Jeffrey McDermott , Senior Environmental Specialist 0: (704) 662-0375 1 C: (704) 618-3854 192 Raceway Drive, Mooresville, NC 28117 Blocked Blockedwww.SunEnergyl.com ieffrey.mcdermott(@SunEnergyl.com From: Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.Standridge(@usace.army.mil> Sent: Monday, May 4, 2020 4:05 PM To: Jeffrey McDermott <ieffrey.mcdermott(@sunenergyl.com> Cc: Scarbraugh, Anthony <anthony.scarbraugh(@ncdenr.gov>; Pullinger, Robert C <chris.pullingerPncdenr.gov> Subject: RE: SAW-2018-02357 - Albemarle Beach Solar Site - completeness items Thanks for the additional information. I look forward to receiving the additional plans. Regarding item 4 (mitigation): I agree that you have done a good job of avoiding and minimizing impacts to waters and wetlands, and that is why I am not asking for additional avoidance. However, 0.1 acres of wetland loss is the threshold for requiring compensatory mitigation for the nationwide permits and it will be required for this project. Thank you, ME From: Jeffrey McDermott <ieffrey.mcdermott(@sunenergyl.com> Sent: Monday, May 4, 2020 2:49 PM To: Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.Standridge(@usace.army.mil> Cc: Scarbraugh, Anthony<anthony.scarbraugh(@ncdenr.gov>; Pullinger, Robert C <chris.pullinger(@ncdenr.gov> Subject: [Non-DoD Source] RE: SAW-2018-02357 - Albemarle Beach Solar Site - completeness items Good Afternoon Billy, I hope you had a great weekend. I have been trying to get back to the PCN form to double check the attachments and information included in the submittal. I contacted Bev Strickland to assist me. Otherwise, please see my answers and questions below. Thank You, Jeffrey McDermott I Senior Environmental Specialist 0: (704) 662-0375 1 C: (704) 618-3854 192 Raceway Drive, Mooresville, NC 28117 Blocked Blocked Blockedwww.SunEnergyl.com ieffrey.mcdermott(�SunEnergyl.com S "*naorm " CQrVI=MCrgI— an= .1 From: Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.Standridge(@usace.army.mil> Sent: Monday, May 4, 2020 11:29 AM To: Jeffrey McDermott <ieffrey.mcdermott(@sunenergyl.com> Cc: Scarbraugh, Anthony<anthony.scarbraugh(@ncdenr.gov>; Pullinger, Robert C <chris.pullinger(@ncdenr.gov> Subject: SAW-2018-02357 - Albemarle Beach Solar Site - completeness items Good Morning Jeff, I have completed my initial review of the PCN for the Albemarle Beach Solar site. Please address the following items: 1. All of the impacts to wetlands/waters associated with this project appear to be road crossings and culvert extensions. Are there any other impacts (including temporary) other than the road crossings? (If the impacts are only from road crossings then we will evaluate this project under NWP-14) The impacts to wetland/waters are all either culverts or short sections of access roads through the wetlands. Any temporary crossings that we utilize will be non - impact, as we will possibly use metal ramps to span certain sections of ditch. This doesn't seem likely at this time though. It looks like the NWP-14 and NWP-12 are essentially identical, as far as thresholds and general language. 2. 1 don't see any of the utility lines on the site plan. How will the electricity be transferred offsite? Will there be any wetland impacts associated with utility lines? There are utility lines shown on the plans. As soon as I have access to the PCN form, I will make sure that the correct plans are available. All of the road impacts are due to the utility lines between the arrays, and the substation located off of Mackey's Road. The transmission lines will then go from the substation to the grid, directly off -site. 3. Please provide a more detailed design of the wetland crossings A,B, & C (the drawing should include length and width of the road within the wetland). Please also provide a typical cross- section drawing of the ditch and wetland road crossings. We currently have our civil engineer working on the details of the crossings and typical cross -sections. We should have them by the end of the week, or very early next week at the latest. 4. Impacts A, B, & C will result in the loss of more than 0.1 acres of the same wetland. Mitigation will be required for these impacts at a 2:1 ratio. Please provide a mitigation plan to offset these impacts. I checked RIBITS and it appears that this project is within the service area of Great Dismal Swamp Restoration Bank. You can contact Ms. Beverly White at (757) 487-3441 Ext 105 gdsrb2(@Rmail.com to inquire about credit availability. I would like to entertain the possibility of receiving an activity -specific waiver of the mitigation in reference to the access road impacts. I feel like we have avoided and minimized our impacts to the greatest extent possible, and keeping under .5ac. of impacts on a site that is 1,328ac. seems very reasonable, and in no way excessive. In other types of development, the impacts that associated with a site this large could be much, much greater. 5. 1 will need to coordinate with the NC SHPO office regarding the cultural resources/historic properties survey. I will let you know if they require any additional information. I have attached the SPHO documentation associated with the project, which includes the submitted addendum to the Phase I Archaeological Survey, and the corresponding concurrence letter. Even though it's labelled addendum, it does include the entire project outline. Please address the above items at your earliest opportunity. The submittal will be considered incomplete until all of the items are adequately addressed. Please let me know if you have any questions. Thanks, Billy W. Standridge Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4595 CONFIDENTIALITY NOTICE: This email message and any attachments are intended only for the person or entity to which it is addressed and may contain confidential and/or privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient of this email, please contact the sender by reply email and delete the original and any copy of this email. If you are the intended recipient but do not wish to receive communications by email, please so advise the sender immediately. CONFIDENTIALITY NOTICE: This email message and any attachments are intended only for the person or entity to which it is addressed and may contain confidential and/or privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient of this email, please contact the sender by reply email and delete the original and any copy of this email. If you are the intended recipient but do not wish to receive communications by email, please so advise the sender immediately. CONFIDENTIALITY NOTICE: This email message and any attachments are intended only for the person or entity to which it is addressed and may contain confidential and/or privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient of this email, please contact the sender by reply email and delete the original and any copy of this email. If you are the intended recipient but do not wish to receive communications by email, please so advise the sender immediately. CONFIDENTIALITY NOTICE: This email message and any attachments are intended only for the person or entity to which it is addressed and may contain confidential and/or privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient of this email, please contact the sender by reply email and delete the original and any copy of this email. If you are the intended recipient but do not wish to receive communications by email, please so advise the sender immediately. 0 N 0 N 00 N 1-1 Ln iv 00 00 0 i i� 0 i Q 00 00 0 0 0 U m 0 Q) Q 00 00 0 U 0 a_ U Q ALBEIII SWOUND `von r •^• I ' . im J VICINITY MAP SCALE 1 "=4000' SITE NOTES- 1. DEVELOPER: SUN ENERGY 1, LLC 192 RACEWAY DRIVE MOORESVILLE, NC 28117-6509 2. SUN ENERGY 1, LLC INTENDS TO CONSTRUCT THIS ±1149 ACRE SOLAR ENERGY FARM IN WASHINGTON COUNTY. THE FACILITY IS BEING DESIGNED AND CONSTRUCTED BY ALBEMARLE BEACH SOLAR, LLC. 3. BOUNDARY AND TOPOGRAPHIC SURVEY PROVIDED BY ROANOKE LAND SURVEYING. 4. PROJECT LEASE AREA AND SOLAR PANEL LAYOUT PROVIDED BY SUN ENERGY 1, LLC. CONTRACTOR SHALL CONFIRM LEASE LINES AND SOLAR PANEL LAYOUTS PRIOR TO WORK IN EACH PHASE. 5. WETLANDS / JURISDICTIONAL WATER DELINEATION PERFORMED BY TIMMONS GROUP (DATED 12/12/2019. FIELD LOCATIONS FOR THIS INFORMATION HAS BEEN PROVIDED BY SUN ENERGY 1, LLC. INFORMATION SHOWN ON THIS PLAN IS BELIEVED TO BE ACCURATE, BUT HAS NOT RECEIVED FINAL APPROVAL AT TIME OF DRAWING RELEASE. CONTRACTOR SHALL VERIFY LIMITS OF APPROVED WETLAND DELINEATIONS AND OTHER JURISDICTIONAL FEATURES. 6. UPON COMPLETION OF SECTIONS OF INSTALLATION OF SOLAR PANEL ARRAYS, THE SITE SHALL BE PERMANENTLY VEGETATED. OWNERS AND PROPERTY INFORMATION: TRACT 1 -VL DIRECTOR LAND HOLDINGS, LLC 192 RACEWAY DRIVE, MOORESVILLE, NC 28117 PIN NO. 6799-10-7575, RECORDED IN D.B. 509, PG. 102 PROPERTY LOCATION: WOODLAWN ROAD / SR 133 TRACT 2 -VL DIRECTOR LAND HOLDINGS, LLC 192 RACEWAY DRIVE, MOORESVILLE, NC 28117 PIN NO. 6798-49-4445, RECORDED IN D.B. 509, PG. 102 PROPERTY LOCATION: WOODLAWN ROAD / SR 1331 TRACT 3 - ERIC M. STALLINGS 218 WASTHAVEN DRIVE, PLYMOUTH, NC 27962 PIN NO. 6799-50-3541, RECORDED IN D.B. 506, PG. 895 PROPERTY LOCATION: DAVIS ROAD / SR 1332 TRACT 4 -GRAY GOODWIN 801 MACEDONIA ROAD, EDENTON, NC 27932 PIN NO. 6798-79-8664, RECORDED IN 181, PG. 30 PROPERTY LOCATION: DAVIS ROAD / SR 1332 TRACT 5 -VL DIRECTOR LAND HOLDINGS, LLC 192 RACEWAY DRIVE, MOORESVILLE, NC 28117 PIN NO. 6799-83-1197, RECORDED IN D.B. 509, PG. 102 PROPERTY LOCATION: SAINTS DELIGHT ROAD / SR 1333 TRACT 6 - WANDRA L. WHITFORD 2734 ARMFIELD ROAD, HILLSBOROUGH, NC 27278 PIN NO. 6799-94-5574, RECORDED IN D.B. 506, PG. 877 PROPERTY LOCATION: HAS NOT BEEN ASSIGNED TRACT 7 - KAYE B. & W. MITCHELL DOTSON 2334 TAR LANDING ROAD, WILLIAMSTON, NCC 27892 PIN NO. 7709-14-7908, RECORDED IN D.B. 454, PG. 907 PROPERTY LOCATION: CROSS ROAD / BAKER SWAMP SEE SHEET C501 FOR IMPACT #2 \ SEE SHEET C501 \ FOR IMPACT #1-------------------------------- \\ TRACT 8 - FRANCIS SPENCER & KATHERINE PERDUE 2301 TRANT LAKE DRIVE, VIRGINIA BEACH, VA 23454 PIN NO. 7709-46-5690, RECORDED IN D.B. 477, PG. 944 PROPERTY LOCATION: 1836 CROSS ROAD TRACT 9 -VL DIRECTOR LAND HOLDINGS, LLC 192 RACEWAY DRIVE, MOORESVILLE, NC 28117 PIN NO. 6799-86-3225, RECORDED IN D.B. 509, PG. 102 PROPERTY LOCATION: MACKEYS ROAD TRACT 10 -VL DIRECTOR LAND HOLDINGS, LLC 192 RACEWAY DRIVE, MOORESVILLE, NC 28117 PIN NO. 7709-08-8607, RECORDED IN D.B. 509, PG. 102 PROPERTY LOCATION: MACKEYS ROAD / CROSS ROAD TRACT 11 -VL DIRECTOR LAND HOLDINGS, LLC 192 RACEWAY DRIVE, MOORESVILLE, NC 28117 PIN NO. 7709-49-9764, RECORDED IN D.B. 509, PG. 91 PROPERTY LOCATION: OFF MACKEYS ROAD BETWEEN RAILROADS SEE SHEET C503 FOR IMPACT AREA C ►--X x \ x ° cl-II ........................................ 11 13 SEE SHEET C5b2 L SEE SHEET C501 FOR IMPACT #4 FOR IMPACT #3 ° ° OVERALL MAP FOR REFERENCE ONL Y NOT FOR CONSTRUCTION �o5 s SEE SHEET C503 FOR IMPACT AREA A x J FOR IMPACT AREA B E /� i ?� ��"- •ye] r ° ° GRAPHIC SCALE 0 300 600 1200 (IN FEET) 1 INCH = 600 FT. 2400 Know what's below. Cal before you dig. m r z 0 � a U w 0 w a 0 f8® [J. Q z J O U z 3:: > 10co 00 1 vOZ 0 U .I cj) O Li ~ Z � V J � Z Q oc o0 W � -.-! N OO J J_ w w J LEGEND � 19cmf= CONCRETE MONUMENT FOUND qPF= IRON PIPE FOUND qf1F IRON ROD FOUND `�,KF PK NAIL FOUND ter's PK NAIL SET � O CALCULATED POINT w w O PROPERTY LINE/LEASE AREA � - - RIGHT OF WAY EXISTING POWER POLE N { EXISTING GUY WIRE � o � OVERHEAD ELECTRIC � w � Q � °M° EXISTING DITCH o w� cn Y � o EXISTING TREELINE w w w WATERS OF THE U.S. (OUTLINE) w � � � w w - - - - - - - - JURISDICTIONAL WETLANDS � N a a ----------- -- --] SURVEYED AND CONFIRMED SCALE: 1 "=600' C500 gmEsmm In c� 0 N 0 N 00 N Ln iv uo Q 00 00 0 i� 0 F iv Q Q0 00 00 0 0 0 U U m E Q) Q 0 00 V_� 00 0 0 0 G) U s \ \ 36" HDPE \ \ INV. = 6.00' LIMITS OF IMPACT AREA = 768 SF (0.017 AC) TOTAL \ \\\ \ \ (600 SF PERMANENT; 168 SF TEMPORARY) \ \ \ x 10.77 \ T \ \ INSTALL 50 LF \ OF 36" HDPE \'\ \ \\ \\ roki S \ � 70 s�\ � 788 � 4 \ \ \ 36" HDPE INV. = 6.05' TEMPORARY MUD PUMP GE TO _ND) 5.0 APPROXIN TOP OF EXIS i m�— DITCH BANK 12" MIN. 36" INV. 6.00' COVER TOP OF BANK t9.4' EX. DITCH \V' F7/. /� IMPACT AREA #1 TEMPORARY SANDBAG COFFER DAM FOR DEWATERING (TYP.) A - 5. 0' BOTTOM OF EXISTING DITCH ACCESS AISLE 2:1 OR FLATTER SIDE SLOPE 36" INV. 6.05' 36" HDPE CULVERT \\ (50' LENGTH) \ DITCH INVERT 'ED INSTALL CULVERT f7" LTEMPORARY BELOW EXISTING BOTTOM S'EC7M AA COFFER DAM OF DITCH NTS 64' TOTAL LIMITS OF DISTURBANCE SEEDING SCHEDULE IMPACT AREA #1 CULVERT INSTALLAT70N DETAIL NTS AFRL 1-MAY 15 P6RA4A6NT SPECIES alSED 3 RATE K-31 FESCUE 3 LB/1000 SF COMMON BERMUDAGRASS 1 LB/1000 SF WINTER RYE GRAIN 3 LB/1000 SF NOTE: DELETE RYE GRAIN IF OVERSEEDING ESTABLISHED RYE OR FESCUE. DELETE FESCUE IF OVERSEEDING ESTABLISHED FESCUE. MAY 15 - JE L Y 0 PEENAWE SEED 0 SPECIES RATE K-31 FESCUE 3 LB/1000 SF COMMON BERMUDAGRASS 1 LB/1000 SF GERMAN MILLET 3 LB/1000 SF NOTE: DELETE MILLET IF OVERSEEDING ESTABLISHED MILLET OR FESCUE. DELETE FESCUE IF OVERSEEDING ESTABLISHED FESCUE. AIK L6r 15 - APIs A TEWORARY SEED K? SPECIES RATE K-31 FESCUE 3 LB/1000 SF WINTER RYE GRAIN 5 LB/1000 SF SOIL AAd9WX4E NM APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 500 LB PER ACRE OF 10-10-10 FERTILIZER. Al LCH USE JUTE, EXCELSIOR MATTING OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER BOTTOM AND SIDES OF SWALES. ANCHOR MATTING PER MANUFACTURERS RECOMMENDATIONS. HYDROSEEDING IS ALSO AN ACCEPTABLE METHOD OF TEMPORARY STABILIZATION. A MINIMUM OF 3 WEEKS IS REQUIRED TO FOR ESTABLISHMENT. INSPECT AND REPAIR MULCH FREQUENTLY. FERTILIZE THE FOLLOWING SPRING WITH 50 LB/ ACRE NITROGEN. �,lillllj 31 1 1. UTILITIES: PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION, THE OWNER SHALL HAVE THE APPROPRIATE UNDERGROUND UTILITIES LOCATED. 2. LIMITS OF DISTURBANCE: THE CONTRACTOR SHALL ENSURE THAT AREAS OUTSIDE OF THE LIMITS OF LAND DISTURBING AS WELL AS EXISTING IMPROVEMENTS SPECIFICALLY NOTED FOR PROTECTION ARE NOT ADVERSELY IMPACTED BY ANY CLEARING ACTIVITIES. 3. STABILIZATION: EXPOSED SWALES, DITCHES, DIKES OR OTHER SLOPES STEPPER THAT 3(H):1(V) SHALL BE STABILIZED WITH A TEMPORARY OR PERMANENT GROUND COVER WITHIN 7 CALENDAR DAYS. ALL OTHER EXPOSED EARTHEN AREAS SHALL BE STABILIZED WITH A TEMPORARY OR PERMANENT GROUND COVER WITHIN 14 CALENDAR DAYS OF THE COMPLETION OF ANY PHASE OF GRADING. 4. EXCAVATION AND EMBANKMENT: ANY OFF -SITE MATERIAL BROUGHT ONTO TO THE SITE TO BE USED FOR GRADING FILL SHALL BE OBTAINED FROM A PERMITTED BORROW PIT. 5. EXISTING INFORMATION: THE EXISTING TOPOGRAPHY SHOWN ON THIS PLANS IS TAKEN FROM LiDAR DATA AND FIELD REVIEWED FOR RELATIVE COMPARISON. SITE STABILIZATION REOUIREMENTS SITE AREA DESCRIPTION STABILIZATION TIME STABILIZATION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES AND SLOPES ALL OTHER AREAS WITH NONE (EXCEPT FOR PERIMETER SLOPES FLATTER THAN 4:1 14 DAYS AND HQW ZONES) v v"<�K,051 \ \ \ \ 24" HDPE, \ \\ \INV. = 5.88' S\ S \ I \ REMOVE EX. 20' CULVERT AND REPLACE WITH 35 LF OF 24" HDPE Q ti .S S — S. 5.0 I S 24" HDPE INV. = 5.90' TEMPORARY SANDBAG FFER DAM FOR WATERING (TYP.) 5. 0' - APPROXI OF EXISTING DITCH 2:1 OR FLATTER ACCESS AISLE SIDE SLOPE \ 6/ _x 91 \ LIMITS OF IMPACT \ AREA = 153 SF (0.004 AC) TOTAL (85 SF PERMANENT; \ 68 SF TEMPORARY) \ x 9.63 x 9.26 IMPACT AREA #2 LIMITS OF IMPACT AREA = 84 SF (0.002 AC) (38 SF PERMANENT; 46 SF TEMPORARY) TEMPORARY MUD PUMP (DISCHARGE OUTLET E 12" MIN. x 3.49 5. 0' ROXIMATE ivr OF EXISTING DITCH BANK GRAPHIC SCALE 0 5 10 20 (IN FEET) 1 INCH = 10 FT. 24" INV. 5.90' COVER 24" INV. 5.88' % /\ \j TOP OF BANK t9.4' �24" HDPE CULVERT �;� Ex. DITCH DITCH INVERT (35' LENGTH) A INVERT f6.6' TEMPORARY INSTALL CULVERT f7" COFFER DAM REMOVE EXJ SECTION AA BELOW EXISTING BOTTOM CULVERT NTS OF DITCH 49' TOTAL LIMITS OF DISTURBANCE - IMPACT AREA #2 CULVERT INSTALLA770N DETAIL NTS FINAL DRAWING NOT FOR CONSTRUCTION \ \ \ \ LIMITS OF IMPACT \ \ \ \ \ AREA = 69 SF (0.002 AC) TOTAL \ \ \ V A (18 SF PERMANENT; \ \ 36" HDPE \ \ \ 51 SF TEMPORARY) \ I \ = 6.20' \ \ S. \ REMOVE EX. 20' CULVERT AND REPLACE WITH 30 LF OF 36" HDPE 9.00 \\\ \\ \\ \\\ \ \ \\\ `X V A \ 36" HDPE INV. = 6.25' LIMITS OF IMPACT AREA = 137 SF (0.003 AC) TOTAL _(80 SF PERMANENT; 57 SF TEMPORARY) IMPACT AREA #3 TEMPORARY SANDBAG FFER DAM FOR WATERING (TYP.) 5. 0' - APPROXI OF EXISTING DITCH 2:1 OR FLATTER ACCESS AISLE SIDE SLOPE TEMPORARY MUD PUMP (DISCHARGE OUTLET E 12" MIN. 5. 0' ROXIMATE ivr OF EXISTING DITCH BANK 36" INV. 6.25' COVER 36" INV. 6.20' TOP OF BANK t 9.4' x�Ay�A/ — i 36" HDPE CULVERT =; EX. SWALE SWALE INVERT �/� (30' LENGTH) INVERT f6.6' TEMPORARY INSTALL CULVERT f7" COFFER DAM REMOVE EXJ SECTION AA BELOW EXISTING BOTTOM CULVERT NTS OF DITCH 44' TOTAL LIMITS OF DISTURBANCE - IMPACT AREA #3 CULVERT INSTALLA71aV DETAIL NTS MOUND AS NEEDED TO PROVIDE 12" MIN. COVER 3 X O.D. CLEAN, SUITABLE BACKFILL (COMPACT IN 8" LIFTS) 10 1 SELECT BACKFILL EXISTING OR PROPOSED (NCDOT CLASS II OR III) SWALE OR DITCH I.D. / 6 SPRINGLINE (6" MIN.) jl\ NCDOT CLASS III OR CLASS II, TYPE 1 O.D. + 2' REMOVE MUCK, IF PRESENT. PLACE SELECT BACKFILL (NCDOT CLASS V OR VI) WRAPPED IN (COMPACT AFTER PIPE IS SET, PRIOR GEOTEXTILE, THICKNESS VARIES WITH FIELD TO PLACING ADDITIONAL FILL) CONDITIONS, CONSULT WITH ENGINEER. CULVERT INSTALLATION DETAIL NTS �p E �W Q co J i U � O � w N E N �Q O �0 > c W 4) Ru 00 U p N2 J o J N o 2 0. ui -0 (n N N - Z - "o -6 0 U N o a)(n M _ Lo U >_ N N x � Q C14J U E Y O co °' m ai ui VQ o °o rnz O o X 3 N. m Q ¢ m — c Q 0 YdLL $U H oQ c.N m Z � J � v O z O U .I cj) O O F- Z_ <J � W V JJ LLJ � w_ z�J= _ LQ pC z �CD o J W \ cn w J w J U � O N 57 00 O iC-4 00 f W 7) U 7) 0000 O (n Y O � � o }w w Li w z z Y 2 w V W J U) o U u- SCALE: 1 i oC501 PROD. NO.08386A Ln u 0 N 0 N co N Ln iv Q uo 00 00 0 / i� 0 F iv Q Q0 00 00 0 0 0 U U m E 0 Q 00 co 0 / u 0 0 U Q / \ \ \ \ \ x 14.97 \ \\\ \ \ \ \ LIMITS OF IMPACT \ y4 30" HDPE \ \ \ \ \ \ AREA = 768 SF (0.018 AC) TOTAL \ \ INV. = 7.10' \ \ \ \ (600 SF PERMANENT; \ \\ \ \ \ 168 SF TEMPORARY) \ x 13.27 OF x3.41 INSTALL 60 LF \\ 30" HDPEco \ \� \ 30" HDPE \ INV. = 7.10' IMPACT AREA #4 TEMPORARY SANDBAG COFFER DAM FOR DISCHARGEDEWATERING (TYP.) OUTLET A A 5.0' ATE APPROXIMATE BOTTOM TOP OF EXISTING OF EXISTING DITCH ACCESS AISLE 2:1 OR FLATTER 30" INV. 7.10' TOP OF BANK t11.4' EX. SWALE /�30" HDPE CULVERT v INVERT ±7.6' / (60' LENGTH) \ SWALE INVERT APPROXIMATE TEMPORARY MUD PUMP TO END) 5.0 DITCH BANK 12" MIN. COVER SIDE SLOPE 30" INV. 7.10' INSTALL CULVERT f6" ZTEMSEC770NA A COFPORARY BELOW EXISTING BOTTOM DAM OF DITCH NTS 74' TOTAL LIMITS OF DISTURBANCE SEEDING SCHEDULE �AICTA� 04 CULVERT INSTALLATION DETAIL NTS AFRL 1-MAY 15 P6�4A6NT SPECIES alSEDA 3 RATE K-31 FESCUE 3 LB/1000 SF COMMON BERMUDAGRASS 1 LB/1000 SF WINTER RYE GRAIN 3 LB/1000 SF NOTE: DELETE RYE GRAIN IF OVERSEEDING ESTABLISHED RYE OR FESCUE. DELETE FESCUE IF OVERSEEDING ESTABLISHED FESCUE. MAY 15 - JE L Y 0 PEENAWE SEED 0 SPECIES RATE K-31 FESCUE 3 LB/1000 SF COMMON BERMUDAGRASS 1 LB/1000 SF GERMAN MILLET 3 LB/1000 SF NOTE: DELETE MILLET IF OVERSEEDING ESTABLISHED MILLET OR FESCUE. DELETE FESCUE IF OVERSEEDING ESTABLISHED FESCUE. AIK L6r 15 - APIs TEL#VRW SEED111K? SPECIES RATE K-31 FESCUE 3 LB/1000 SF WINTER RYE GRAIN 5 LB/1000 SF SOL AAd9WX4E M APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 500 LB PER ACRE OF 10-10-10 FERTILIZER. Al LCH USE JUTE, EXCELSIOR MATTING OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER BOTTOM AND SIDES OF SWALES. ANCHOR MATTING PER MANUFACTURERS RECOMMENDATIONS. HYDROSEEDING IS ALSO AN ACCEPTABLE METHOD OF TEMPORARY STABILIZATION. A MINIMUM OF 3 WEEKS IS REQUIRED TO FOR ESTABLISHMENT. INSPECT AND REPAIR MULCH FREQUENTLY. FERTILIZE THE FOLLOWING SPRING WITH 50 LB/ ACRE NITROGEN. x / x / / x / 36" HDPE INV. = 1 1.10' / INSTALL 50 LF 36" HDPE / / S / / / / 36" HDPE INV. = 11.00' x f,S / 0, g / /x 1172 / / / / / x � S LIMITS OF IMPACT 30 AREA = 448 SF (0.010 AC) TOTAL (350 SF PERMANENT; 98 SF TEMPORARY) / S / x C�� X IMPACT AREA #5 TEMPORARY SANDBAG TEMPORARY MUD PUMP COFFER DAM FOR (DISCHARGE TO DEWATERING (TYP.) OUTLET END) A A 5.0' 5.0' APPROXIMATE APPROXIMATE BOTTOM TOP OF EXISTING OF EXISTING DITCH DITCH BANK ACCESS AISLE 2:1 OR FLATTER SIDE SLOPE 12" MIN. 36" INV. 11.00' COVER 36" INV. 11.10' TOP OF BANK t 12.9 \//i��%V EX. SWALE /�!36" HDPE CULVERT INVERT f11.6' /�� (50' LENGTH) SWALE INVERT M QO A Q GRAPHIC SCALE 0 5 10 20 (IN FEET) 1 INCH = 10 FT. 1. UTILITIES: PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION, THE OWNER SHALL HAVE THE APPROPRIATE UNDERGROUND UTILITIES LOCATED. 2. LIMITS OF DISTURBANCE: THE CONTRACTOR SHALL ENSURE THAT AREAS OUTSIDE OF THE LIMITS OF LAND DISTURBING AS WELL AS EXISTING IMPROVEMENTS SPECIFICALLY NOTED FOR PROTECTION ARE NOT ADVERSELY IMPACTED BY ANY CLEARING ACTIVITIES. 3. STABILIZATION: EXPOSED SWALES, DITCHES, DIKES OR OTHER SLOPES STEPPER THAT 3(H):1(V) SHALL BE STABILIZED WITH A TEMPORARY OR PERMANENT GROUND COVER WITHIN 7 CALENDAR DAYS. ALL OTHER EXPOSED EARTHEN AREAS SHALL BE STABILIZED WITH A TEMPORARY OR PERMANENT GROUND COVER WITHIN 14 CALENDAR DAYS OF THE COMPLETION OF ANY PHASE OF GRADING. 4. EXCAVATION AND EMBANKMENT: ANY OFF -SITE MATERIAL BROUGHT ONTO TO THE SITE TO BE USED FOR GRADING FILL SHALL BE OBTAINED FROM A PERMITTED BORROW PIT. 5. EXISTING INFORMATION: THE EXISTING TOPOGRAPHY SHOWN ON THIS PLANS IS TAKEN FROM LiDAR DATA AND FIELD REVIEWED FOR RELATIVE COMPARISON. SITE STABILIZATION REOUIREMENTS SITE AREA DESCRIPTION STABILIZATION TIME STABILIZATION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES AND SLOPES ALL OTHER AREAS WITH NONE (EXCEPT FOR PERIMETER SLOPES FLATTER THAN 4:1 14 DAYS AND HQW ZONES) ZT INSTALL CULVERT f7" SEC7A A CEM OFP�RA BELOW EXISTING BOTTOM 10NDAM OF DITCH NTS 64' TOTAL LIMITS OF DISTURBANCE IMPACT AREA #5 CULVERT INSTALLA770N DETAIL NTS MOUND AS NEEDED TO PROVIDE 12" MIN. COVER 3 X O.D. CLEAN, SUITABLE BACKFILL (COMPACT IN 8" LIFTS) 10 — , , :�_11'111 1,11, ..... . 1 SELECT BACKFILL EXISTING OR PROPOSED (NCDOT CLASS II OR III) SWALE OR DITCH mac- I.D. / 6 SPRINGLINE (6" MIN.) NCDOT CLASS III OR CLASS II, TYPE 1 O.D. + 2REMOVE MUCK, IF PRESENT. PLACE SELECT (COMPACT AFTER PIPE IS SET, PRIOR BACKFILL (NCDOT CLASS V OR VI) WRAPPED IN GEOTEXTILE, THICKNESS VARIES WITH FIELD TO PLACING ADDITIONAL FILL) CONDITIONS, CONSULT WITH ENGINEER. CULVERT /NSTALLAT/aV DETAIL NTS AL (2) 36" HOPE INV. = 4.40' TEMPORARY MUD PUMP (DISCHARGE TO OUTLET END) 5.0' APPROXIMATE TOP OF EXISTING DITCH BANK 12" MIN. 36" INV. 4.40'� —COVER TOP OF BANK f6.3 SWALE INVERT f 4.9' \ 4.95 k Gb1al 700 G.S � 723 LIMITS OF IMPACT AREA = 117 SF (0.003 AC) TOTAL (0 SF PERMANENT; 117 SF TEMPORARY) REMOVE EX. 20 LF CULVERT AND INSTALL (2) 50 LF 36" HDPE / 5 / 7. / I 5- / N / S co / \\ \ \ \ LIMITS OF IMPACT AREA = 469 SF (0.011 AC) TOTAL (385 SF PERMANENT; \\ \ \ 84 SF TEMPORARY) N N 8 1 N 1 N \ N (2) 36" HDPE INV. = 4.50' IMPACT AREA #6 TEMPORARY SANDBAG COFFER DAM FO DEWATERING (TYP. �A 5.0' APPROXIMATE BOTTOM OF EXISTING DITCH ACCESS AISLE 2:1 OR FLATTER SIDE SLOPE 36" INV. 4.50' r(2j 36* -HDPE CULVERT ��� (50'1 LENGTHS) ���� SWALE INVERT INSTALL CULVERTS 6" IA A COFFERDAM TEMPORARY J BELOW EXISTING BOTTOM J REMOVE EX. ] SEC7M OF DITCH (TYP.) CULVERT NTS 64' TOTAL LIMITS OF DISTURBANCE IMPACT AREA #6 CULVERT /V3TAL.LA7IAN DETAIL NTS FINAL DRAWING MOUND AS NEEDED TO PROVIDE 12" MIN. COVER SELECT BACKFILL (NCDOT CLASS II OR III)_ I.D. / 6 (6" MIN.) NCDOT CLASS III OR CLASS II, TYPE 1 (COMPACT AFTER PIPE IS SET, PRIOR TO PLACING ADDITIONAL FILL) NOT FOR CONSTRUCTION 6 X O.D. 1 12" �• O.D. + 2' CULVERT INSTALLATION DETAIL NTS CLEAN, SUITABLE BACKFILL (COMPACT IN 8" LIFTS) 10 � 1 EXISTING OR PROPOSED SWALE OR DITCH REMOVE MUCK, IF PRESENT. PLACE SELECT BACKFILL (NCDOT CLASS V OR VI) WRAPPED IN GEOTEXTILE, THICKNESS VARIES WITH FIELD CONDITIONS, CONSULT WITH ENGINEER. m Z � J Z � v O z O U .I cj) O O F � = z <J � W cn z�J= z �CD o J W \ co w J w J wmwwj U � O N 07 0 O iC4 00 f W 7) U 7) 11) 00 O (n Y O 0 0 0 }w w Lij w z z Y 2Lii w V J Q w _ (n o o U U- SCALE: 1 "= 10' C502 N 0 0 O N 0 N 00 N try 6 Q 0 00 00 0 cn i� 0 iv Q Q0 00 00 0 0 0 U U m Q 0 00 00 0 0 2 U Q / \ \ F / \ \ SF SF SF NSF SF SF SF SF S�' SF � SF NSF _ - �\9j0 / / 1- _ _ _ -� / '7 / \\ \_.rrr\rr♦ --- -- � _ rrr r ♦ ♦ - -1' x 67r1 i 510 _ i xh.3� 4 .rrr♦♦♦ \ �� x4.10 \ r r r ♦wD�M/ rTt� e ♦ � 115. E -- / x 4.3 r r♦♦♦♦ i J 5 tend/w62 r ♦ ♦ ♦ ♦ ♦ ♦ x4.67 \ / ♦♦♦ ♦♦♦ \ / III III x465 x 4.01 ♦ ♦ ♦ ♦ ♦ ♦ i / x3.79 � jr ` ♦ ♦ ♦ ♦ ♦ ♦ / x3.87 / a .rrrrrr 356 4.00 (5) 36" HDPE INV. = 2.78' \ x 3.70 \ x 3 64 x 3,75 \ r r x 4.22 \ � rrr rrr � , rrrrrr r rrr rrr (5) 36" HDPE x 3.53 INV. = 2.83' ` , 00 PROPOSED GRADE x 3,65 x \,91 (L OF GRAVEL ROAD ELEV. = 7.20' C x' \ r r r r r r -�-__-7�____ rrr rrr rrrrrr --� x3.9/ 1 ` rrr rrr 6 x385 rrr r _ x4J4 ` rrrrrr _ Irrr rrr x3.95 - rrrrrrr /\ Pff rrr rrr x3.74 / / PF .rrrrrr rrr rrr / l x4ol rrrrrr / \ rrr rrr / 4.13 .rrrrrr / x406 \ rrrrrr v rrrrrr � o x 4.25 rrr rrr \ \ rrr rrr \ .rrrrrr � / .rrr\rrr .rrrrrr x3.9� I / 4 � x 4.30 ,,--x 4.30 r r r r i t r / \ \ �1LLL / �1LLL rrr r r� i LIMITS OF IMPACT x 4.10 " " " ' xI I AREA = 8280 SF (0.190 AC) TOTAL / (7727 SF PERMANENT; / 553 SF TEMPORARY) X rrr rrr ` x4.14 \ rrr rrr � rrr rrr rrr rrr ` rrr rrr x3.95/ x400 I / rrrrrr ` x4.24 .rrrrrr xk.l5 .rrrrrr rrr rrr .rrrrrr I x4.25 rrr\•rr• .rrrrrr x4.16 rrr rrr I III . 11 11 r r r r \1I ILIL/L 4.25 rrr r r r x407 x4.19 ••••••• .rrrrrr rrr\rrr x4,97 .rrrrrr I rrr rrr / x4." x4.0 rrrrrr rrr rrr .rrrrrr .rrrrrr x4.52 • • • 1• x404 rrr rrr / x4.53 ' x 4A2.r r r i ,4. r r r r r r O$ .rrrrrr rrr rrr x5.15 a .rrrrrr rrrrrr y^ rrr rrr �1LLL �1�LX x wr r r r r x 5$6 rrr �- / x4. / rr rrr 5- i\ x5.20 r r r� r r r \\� x 74. SF- -- - - -- - - - - - - - - -----b--�►�---- SF �y x 6.24 _--7,37_ - - - - - SF SF SF SF/- SF- Sf SF NSF / SF NSF / o GRAPHIC SCALE 0 10 20 40 (IN FEET) 1 INCH = 20 FT. IMPACT AREA C FINAL DRAWING NOT FOR CONSTRUCTION PROPOSED GRADE 1 OF GRAVEL ROAD I ELEV. = 6.85' I I I x i 5 II III I NI I, ♦ r r r r r �s3ye�- 1 r♦ rV r r r 1 r r r Sc 3.74 x p ,n1IIII�/! Ix3.74 I II I \ I x .41 I I II I o on 18" NCDOT CLASS 1 RIP -RAP OVER GEOTEXTILE FABRIC (3) 30" HDPE INV. = 3.10' 5" NCDOT CLASS 1 RIP -RAP OVER GEOTEXTILE FABRIC INSTALL CULVERTS 8" MIN. BELOW EXISTING SURFACE (TYP.) �5�53 x 3.65 i x355 (3) 30" HDPE INV. = 3.10' (3) 30" HDPE INV. = 3.15' x 3.73 x 3.55 55.0' TOTAL LIMITS OF DISTURBANCE 30.0' 14.0' GRAVEL ACCESS ROAD 12" MIN. COVER (3) 30" HDPE CULVERTS (30' LENGTHS) K_' KY KY K_' MOUND AS NEEDED TO PROVIDE 12" MIN. COVER SELECT BACKFILL (NCDOT CLASS II OR 111)� I.D. / 6 (6" MIN.) NCDOT CLASS III OR CLASS II, TYPE 1 (COMPACT AFTER PIPE IS SET, PRIOR TO PLACING ADDITIONAL FILL) m on 18" NCDOT CLASS 1 RIP -RAP OVER GEOTEXTILE FABRIC (5) 36" HDPE INV. = 2.83' 5" NCDOT CLASS I RIP -RAP OVER GEOTEXTILE FABRIC INSTALL CULVERTS 8" MIN. BELOW EXISTING SURFACE (TYP.) MOUND AS NEEDED TO PROVIDE 12" MIN. COVER SELECT BACKFILL (NCDOT CLASS II OR III)-\ SECTION NTS LL PER GEOTECHNICAL ECOMMENDATIONS 2.0' END SECTION NTS WETLAND IMPACT 'B' CULVERT INSTALLATION DETAIL NTS - 55.0' TOTAL LIMITS OF DISTURBANCE 30.0' I.D. / 6 (6" MIN.) 2.0' NCDOT CLASS III OR CLASS 11, TYPE 1 (COMPACT AFTER PIPE IS SET, PRIOR TO PLACING ADDITIONAL FILL) 14.0' GRAVEL ACCESS ROAD 12" MIN. COVER (5) 36" HDPE CULVERTS (30' LENGTHS) C C C &D,C SECTION NTS FILL PER GEOTECHNICAL RECOMMENDATIONS END SECTION NTS WETLAND IMPACT 'C' CULVERT INSTALLATION DETAIL NTS x 4.60 x 7 I I / \� 1 x 5.59 x 3$1 x411 I I \ x9.43 1 x 3.55 \ x$5 x 3.55 \ s 5021 � ♦♦♦♦♦♦♦♦♦♦♦♦♦ 1\901 _ SNOW.- No r r r ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦IIII X,2� '2 \ /rrrrrr / . ♦ ♦ ♦ ♦ ♦♦ ♦ ♦ ///// I I I r r r//// r I I ♦♦♦♦ I I I I I I I ♦x'3.$5' I I I \ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ r ti . r ♦ ♦ ♦ r r r rr r♦♦♦♦♦♦♦♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ rrrr�l >t5� ♦♦ W\ \ N \ \ 1-r rrrrrrrrrrrrrrrrrr 8 � \ 3FiS r r r r r r r r r r r r r / ...rrrrrr 5 / \ x5 x 4.32 x 355 x 355 x 358 LIMITS OF IMPACT / / �9 405 AREA = 5908 SF (0.136 AC) TOTAL x 4.3 / �� 723 \ x 3.05 (5567 SF PERMANENT; 405 341 SF TEMPORARY) I \ x3.55� llL \ x 358 x 3.5,5 IMPACT AREA B "--SPRINGLINE 1 i e 2:1 OR FLATTER SIDE SLOPE (3) 30" HDPE INV. = 3.15' TEMPORARY COFFER DAM (IF NECESSARY) EXISTING GRADE f3.5' 15" NCDOT CLASS I RIP -RAP OVER GEOTEXTILE PROPOSED GRADE OF GRAVEL ROAD ELEV. = 6.85' EXISTING GRADE VARIES t3.6' REMOVE MUCK, IF PRESENT. PLACE SELECT BACKFILL (NCDOT CLASS V OR VI) WRAPPED IN GEOTEXTILE, THICKNESS VARIES WITH FIELD CONDITIONS, CONSULT WITH ENGINEER. 1 o l 2:1 OR FLATTER SIDE SLOPE (5) 36" HDPE INV. = 2.78' TEMPORARY COFFER DAM (IF NECESSARY) EXISTING GRADE f3.5' 15" NCDOT CLASS 1 RIP -RAP OVER GEOTEXTILE PROPOSED GRADE � OF GRAVEL ROAD ELEV. = 7.20' EXISTING GRADE VARIES f3.5-3.7 Ili=%11NIA[tllO12 REMOVE MUCK, IF PRESENT. PLACE SELECT BACKFILL (NCDOT CLASS V OR VI) WRAPPED IN GEOTEXTILE, THICKNESS VARIES WITH FIELD CONDITIONS, CONSULT WITH ENGINEER. I i e 18" NCDOT CLASS I RIP -RAP OVER GEOTEXTILE FABRIC (2) 24" HDPE INV. = 5.48' 5" NCDOT CLASS 1 RIP -RAP OVER GEOTEXTILE FABRIC INSTALL CULVERTS 8" MIN. BELOW EXISTING SURFACE (TYP.) x 606 -$7 5.45 \ \ \ 7' V A \ N \� x S.I3 \ \ \ \\ v I x \ / (2) 24" HDPE W \ x 7.57 \ \ \ x 5.65 INV. = 5.48' I \ I I xl� \ \ \ \ I UN x 5,57 \ l \ \ \ \ s ♦ ♦ / ♦ I I I I \ I I I / �� r O �%r 41j�' ♦ ♦ ♦ ♦ ♦ r r ♦ ♦ \ \ r ♦ ♦ 1p' . . ♦ � ♦ ♦ ♦ r ♦ ♦ ♦ I \ ♦ ♦ ♦ r r >\♦ r r �r ♦ ♦ ♦ ♦ ♦ � ♦ r r r r r r \ ♦ ♦ ♦� r r x 7.45 ♦ r ♦ ♦ ♦ ♦ ♦ ♦ \ r I ♦ ♦ ♦\♦ r ♦ r � PROPOSED GRADE \ w \ OF GRAVEL ROAD I x634 x1$2 ELEV. = 8.70' \ \ � \I x6A x5, 11 I LIMITS OF IMPACT 1 AREA = 1334 SF (0.031 AC) TOTAL \ 7.7511 l N (1121 SF PERMANENT; 213 SF TEMPORARY)\ I I I \ \ (2) 24" HDPE INV. = 5.53' I I I 1 I N x 5.36 I 1 \ x 6.23 x 6-3G 6.72 / 1 x1Q.I4 x7.7 / Lo �I � \ x 6.69 � 55.0' TOTAL LIMITS OF DISTURBANCE 30.0' 14.0' GRAVEL ACCESS ROAD 12" MIN. COVER (3) 30" HDPE CULVERTS (30' LENGTHS) SECTION A A NTS MOUND AS NEEDED TO PROVIDE 12" MIN. COVER SELECT BACKFILL (NCDOT CLASS II OR 111)� I.D. / 6 (6" MIN.) NCDOT CLASS III OR CLASS 11, TYPE 1 (COMPACT AFTER PIPE IS SET, PRIOR TO PLACING ADDITIONAL FILL) SEEDING SCHEDULE 2.0' END SECTION NTS IMPACT AREA A 1 2:1 OR FLATTER SIDE SLOPE (2) 24" HDPE INV. = 5.53' TEMPORARY COFFER DAM (IF NECESSARY) EXISTING GRADE f3.5' LL PER GEOTECHNICAL COMMENDATIONS WETLAND IMPACT 'A' CULVERT INSTALLATION DETAIL NTS APPAL f - MAY f ; P6RW4A61rf S®W SPECIES RATE K-31 FESCUE 3 LB/1000 SF COMMON BERMUDAGRASS 1 LB/1000 SF WINTER RYE GRAIN 3 LB/1000 SF NOTE: DELETE RYE GRAIN IF OVERSEEDING ESTABLISHED RYE OR FESCUE. DELETE FESCUE IF OVERSEEDING ESTABLISHED FESCUE. MAY 15 - AL Y 0 PEENAMW SEEDW SPECIES RATE K-31 FESCUE 3 LB/1000 SF COMMON BERMUDAGRASS 1 LB/1000 SF GERMAN MILLET 3 LB/1000 SF NOTE: DELETE MILLET IF OVERSEEDING ESTABLISHED MILLET OR FESCUE. DELETE FESCUE IF OVERSEEDING ESTABLISHED FESCUE. AMOT 15 - APP1L b TEWOM YSEEDW SPECIES RATE K-31 FESCUE 3 LB/1000 SF WINTER RYE GRAIN 5 LB/1000 SF SOIL AAM61A7149M APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 500 LB PER ACRE OF 10-10-10 FERTILIZER. A/ULQH USE JUTE, EXCELSIOR MATTING OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER BOTTOM AND SIDES OF SWALES. ANCHOR MATTING PER MANUFACTURERS RECOMMENDATIONS. HYDROSEEDING IS ALSO AN ACCEPTABLE METHOD OF TEMPORARY STABILIZATION. A MINIMUM OF 3 WEEKS IS REQUIRED TO FOR ESTABLISHMENT. INSPECT AND REPAIR MULCH FREQUENTLY. FERTILIZE THE FOLLOWING SPRING WITH 50 LB/ ACRE NITROGEN. PROPOSED GRADE OF GRAVEL ROAD ELEV. = 8.70' EXISTING GRADE f5.9' SPRINGLINE 15" NCDOT CLASS I RIP -RAP OVER GEOTEXTILE REMOVE MUCK, IF PRESENT. PLACE SELECT BACKFILL (NCDOT CLASS V OR VI) WRAPPED IN GEOTEXTILE, THICKNESS VARIES WITH FIELD CONDITIONS, CONSULT WITH ENGINEER. 1. UTILITIES: PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION, THE OWNER SHALL HAVE THE APPROPRIATE UNDERGROUND UTILITIES LOCATED. 2. LIMITS OF DISTURBANCE: THE CONTRACTOR SHALL ENSURE THAT AREAS OUTSIDE OF THE LIMITS OF LAND DISTURBING AS WELL AS EXISTING IMPROVEMENTS SPECIFICALLY NOTED FOR PROTECTION ARE NOT ADVERSELY IMPACTED BY ANY CLEARING ACTIVITIES. 3. STABILIZATION: EXPOSED SWALES, DITCHES, DIKES OR OTHER SLOPES STEPPER THAT 3(H):1(V) SHALL BE STABILIZED WITH A TEMPORARY OR PERMANENT GROUND COVER WITHIN 7 CALENDAR DAYS. ALL OTHER EXPOSED EARTHEN AREAS SHALL BE STABILIZED WITH A TEMPORARY OR PERMANENT GROUND COVER WITHIN 14 CALENDAR DAYS OF THE COMPLETION OF ANY PHASE OF GRADING. 4. EXCAVATION AND EMBANKMENT: ANY OFF -SITE MATERIAL BROUGHT ONTO TO THE SITE TO BE USED FOR GRADING FILL SHALL BE OBTAINED FROM A PERMITTED BORROW PIT. 5. EXISTING INFORMATION: THE EXISTING TOPOGRAPHY SHOWN ON THIS PLANS IS TAKEN FROM LiDAR DATA AND FIELD REVIEWED FOR RELATIVE COMPARISON. SITE STABILIZATION REOUIREMENTS SITE AREA DESCRIPTION STABILIZATION TIME STABILIZATION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES AND SLOPES ALL OTHER AREAS WITH NONE (EXCEPT FOR PERIMETER SLOPES FLATTER THAN 4:1 14 DAYS AND HQW ZONES) �p E vi a- �W Q � J i U u N 4) E �Q O - 06 i i Lu cn 0 c Lu 0 p U NO J o J N Q N N 02 N .0 L.-0 .- N 0 - V (n N N E N Z ' -6 O U)as zv9 < OQ (D N QUrn v w cxf L' U) M '6to 0 U E N N N N x v� Q J U E Y O E co a)m aa) ui V¢ o -00 rn� � p= o X 3 N¢. m Q s m 3 a) t - c Q�0 2ILLL $U H oQ'.N m O z 0 Lr_ a CE U U) W 0 w a O z O Nco 00 O cV 00 tf W 7) 0 7) 0000 O (/1 Y O o w w w z z Y 2I�i V Q w J U)o Q U U- SCALE: 1 "= 2 0' C503 J&7- lbemarle & ASSOCIATES, LTD. Albemarle Beach Solar Summary of Analysis of Jurisdictional Impacts May 28, 2020 Impact #1— 50' culvert: The existing ditch separating Phase G & F runs in a generally east / west direction with outfalls on each end. The ditch is a main collector for smaller lateral ditches in the area. It is fairly flat and therefore has the ability to flow either way depending on other conditions. The ditch is approximately 12' wide at the top of bank and just under 3' deep. Impact #1 is located towards the western end and appears to predominately flow to the west. Based upon topographic survey, field review and aerial photography, the contribution drainage area for Impact #1 under normal conditions is approximately 52.5 acres and the peak flow for a 10-year rainfall event is calculated to be 14.7 cfs. Tailwater elevations of the flat ditch cause the culvert to be outlet controlled. A 36" HDPE culvert has been chosen based upon the hydraulic analysis using HY- 8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 2.48 ft/sec and thus rip -rap should not be necessary for long term stabilization. The culvert invert is to be placed 7" below the bottom of the ditch, or approximately 20% of the culvert diameter. Impact #2 — culvert replacement/lengthening. The existing farm lateral in phase G discharges into the existing ditch separating Phase G & F (upstream of Impact #1) The ditch is approximately 8' wide at the top of bank and a little more than 2' deep. Impact #2 includes the replacement of an existing culvert located at the western end where it discharges into the main collector ditch. The 20' culvert will be replaced with 35' to allow for improved access. Based upon topographic survey, field review and aerial photography, the contribution drainage area for Impact #2 is approximately 6.5 acres and the peak flow for a 10-year rainfall event is calculated to be 6.7 cfs. Tailwater elevations of the flat ditch cause the culvert to be outlet controlled. A 24" HDPE culvert has been chosen based upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 2.66 ft/sec and thus rip -rap should not be necessary for long term stabilization. The culvert invert is to be placed 6" below the bottom of the ditch, or 25% of the culvert diameter. Impact #3 — culvert replacement/lengthening: The existing farm lateral in phase G discharges into the existing ditch separating Phase G & F (upstream of Impact #1) The ditch is approximately 8' wide at the top of bank and a little more than 2' deep. Impact #3 includes the replacement of an existing culvert located at the western end where it discharges into the main collector ditch. The 20' culvert will be replaced with 30' to allow for improved access. Based upon topographic survey, field review and aerial photography, the contribution drainage area for Impact #3 is approximately 14.6 acres and the peak flow for a 10-year rainfall event is calculated to be 13.9 cfs. Tailwater elevations of the flat ditch cause the culvert to be outlet controlled. A 36" HDPE culvert has been chosen based upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 2.37 ft/sec and thus rip -rap should not be necessary for long term stabilization. The culvert invert is to be placed 7" below the bottom of the ditch, or approximately 20% of the culvert diameter. Land Planning - Engineering - Surveying - Environmental - Construction Management P.O. Box 3989, 115 W. Saint Clair St., Kill Devil Hills, North Carolina 27948 Phone: 252-441-2113 www.AlbemarleAssociates.com Far: 252-441-0965 Albemarle Beach Solar Farm Summary of Analysis of Jurisdictional Impacts May 28, 2020 Page 2 of 3 Impact #4 — 60' culvert: The existing ditch separating Phase G & F runs in a generally east / west direction which has outfalls on each end. The ditch is a main collector for smaller lateral ditches in the area. It is fairly flat and therefore has the ability to flow either way depending on other conditions. The ditch is approximately 12' wide at the top of bank and about 3' deep. Impact #4 is located at the apparent / relative high point of this ditch. Due to this fact, there is very little upstream "drainage area" for the culvert, and the primary function for the culvert is to maintain the connection to allow for reverse flow when dictated by certain weather characteristics and / or maintenance issues. For this reason, hydraulic analysis of the culvert would be difficult to perform and a more practical approach is considered. A 30" HDPE culvert has been chosen based upon the ditch depth and maintaining a large of a opening as practical. The culvert invert is to be placed 6" below the bottom of the ditch, 20% of the culvert diameter. Impact #5 — 50' culvert: The existing ditch in Phase F collected runoff from the east and south and routes the runoff to the west. It is fairly flat, with only about 7" of fall in more than 1200 feet. For this reason, the ditch is hydraulically inadequate to carry the 10-year rainfall event within its banks. The ditch is approximately 6' wide at the top of bank and less than 2' deep at the east where Impact #5 is located. Based upon topographic survey, field review and aerial photography, the contribution drainage area for Impact #5 under normal conditions is approximately 19.1 acres and the peak flow for a 10-year rainfall event is calculated to be 19.6 cfs. Tailwater elevations of the flat ditch exceed the ditch banks. For this reason, out of bank / overland flow is inevitable without further modifications to the channel. A 36" HDPE culvert has been chosen based upon the ditch depth and maintaining a large of a opening as practical. The outlet velocity is calculated to be 0.32 ft/sec and thus rip -rap should not be necessary for long term stabilization. The culvert invert is to be placed 7" below the bottom of the ditch, or approximately 20% of the culvert diameter. Impact #6 — 50' culvert: The existing ditch at the north end of Phase E runs from the south to the north. The ditch is approximately 10' wide at the top of bank and about 2' deep. Impact #6 is near the outfall of this ditch, just upstream from the wood / swamp line to the north. Based upon topographic survey, field review and aerial photography, the contribution drainage area for Impact #6 is approximately 41.1 acres and the peak flow for a 10-year rainfall event is calculated to be 35 cfs. North of this location the ditch is flat and surrounding grades are lowering, so the ditch depth is getting more shallow and the 10-year flow is no longer maintained within the banks of the ditch. Due to the high flow and relatively shallow ditch depth, two 36" HDPE culverts has been chosen based upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 2.99 ft/sec and thus rip -rap should not be necessary for long term stabilization. The culvert invert is to be placed 7" below the bottom of the ditch, or approximately 20% of the culvert diameter. Impact A — Wetland Crossing: In order to facilitate overhead transmission lines and access between Phase C & D, a 14' wide access road is being installed that will need to cross two wetlands fingers. The crossings are being designed to minimize wetland impacts while maintaining drainage. Based upon topographic survey, LiDAR data and field review, the contribution drainage area for Impact A is approximately 16.6 acres and the peak flow for a 10-year rainfall event is calculated to be 7.1 cfs. Dual 24" HDPE culverts are being provided to allow for a hydraulic connection based Albemarle Beach Solar Farm Summary of Analysis of Jurisdictional Impacts May 28, 2020 Page 3 of 3 upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 3.86 ft/sec and thus rip -rap should not be necessary for long term stabilization. The culvert invert is to be placed 4" below the bottom of the ditch, or approximately 20% of the culvert diameter. Impact B — Wetland Crossing: In order to facilitate overhead transmission lines and access between Phase C & D, a 14' wide access road is being installed that will need to cross two wetlands fingers. The crossings are being designed to minimize wetland impacts while maintaining drainage. Based upon topographic survey and LiDAR data, field review and aerial photography, the contribution drainage area for Impact B is approximately 148.4 acres. Due to the large drainage area, the SCS TR-55 method was used to estimate the peak flow for a 10-year rainfall event which is calculated to be 45.3 cfs. This was calculated considering soil types and land uses to determine the curve number (CN=64) and is included within the attached calculations along with the soils maps for the approximate drainage area. Three 30" HDPE culverts are being provided to allow for a hydraulic connection based upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 5.49 ft/sec and thus rip -rap should be provided for long term stabilization. The culvert invert is to be placed 6" below the bottom of the ditch, or approximately 20% of the culvert diameter. Impact C — Wetland Crossing: In order to facilitate overhead transmission lines and access between Phase E & H, a 14' wide access road is being installed that will need to cross a low-lying swamp. The crossing has been designed to minimize wetland impacts while maintaining drainage. The swamp provides a hydraulic connection from a large portion of land to the west and southwest. Based upon topographic survey and LiDAR data, field review and aerial photography, the contribution drainage area for Impact C is approximately 400 acres. Due to the large drainage area, the SCS TR-55 method was used to estimate the peak flow for a 10-year rainfall event which is calculated to be 82 cfs. This was calculated considering soil types and land uses to determine the curve number (CN=73) and is included within the attached calculations along with the soils maps for the approximate drainage area. Five 36" HDPE culverts are being provided to allow for a hydraulic connection based upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 5.62 ft/sec and thus rip -rap should be provided for long term stabilization. The culvert invert is to be placed 7" below the bottom of the ditch, or approximately 20% of the culvert diameter. Attached to the summary are calculations for each crossing including time of concentration, peak discharge (10-yr rainfall event) and HY-8 analysis summary table. ALBEMARLE BEACH SOLAR FARM CULVERT DISCHARGE CALCULATIONS (10 YR EVENT) JURISDICTIONAL IMPACTS culvert c T (C) I added total c* A c* A c Q area area (incr) (sum) (cumm.) design (in/hr) (ac.) (ac.) (cfs) Impact #1 50' culvert 0.25 197 1.12 52.54 52.54 13.14 13.14 0.25 14.7 Impact #2 20' lengthen 0.25 29 4.1 6.51 6.51 1.63 1.63 0.25 6.7 Impact #3 10' lengthen 0.25 34 3.81 14.55 14.55 3.64 3.64 0.25 13.9 Impact #4 60' culvert 0.00 (high point in existing ditch) 0.0 Impact #5 50' culvert 0.25 29 4.1 19.10 19.10 4.78 4.78 0.25 19.6 Impact #6 50' culvert 0.25 43 3.4 41.13 41.13 10.28 10.28 0.25 35.0 WL Crossing #A 0.15 55 2.84 16.60 16.60 2.49 2.49 0.15 7.1 WL Crossing #B 115 148.40 (SCS TR-55 used due to drainage area size) 45.3 WL Crossing #C 321 400.00 (SCS TR-55 used due to drainage area size) 82.0 TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Impact #1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 125.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.70 0.00 0.00 Travel Time (min) = 16.49 + 0.00 + 0.00 = 16.49 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area ((sqft)) = 885.06 64.00 0.00 Wetted perimeter ((ft)) = 14.90 7.66 0.00 Channel slope (%) = 0.00 0.15 0.00 Manning's n-value = 0.025 0.025 0.015 Velocity (ft/s) = 0.16 2.38 0.00 Flow length (ft) = 1600.0 2500.0 0.0 Travel Time (min) = 162.54 + 17.53 + 0.00 = 180.07 Total Travel Time, Tc.............................................................................. 197.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Crossing Impact #1 (36" culvert — 50 LF) rge Total Culvert tftr Outlet erft/s lwater Names Discharge Discharge Elevation ft Depth P Velocity ft/s y Velocity Eel ation ft cfs cfs 10 yr 14.70 14.70 9.17 2.15 2.48 0.75 8.85 25 yr 17.90 15.33 9.58 2.40 2.53 0.79 9.10 TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Impact #2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 130.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.40 0.00 0.00 Travel Time (min) = 21.28 + 0.00 + 0.00 = 21.28 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area ((sqft)) = 162.82 0.00 0.00 Wetted perimeter ((ft)) = 9.82 0.00 0.00 Channel slope (%) = 0.20 0.00 0.00 Manning's n-value = 0.025 0.015 0.015 Velocity (ft/s) = 3.18 0.00 0.00 Flow length (ft) = 1400.0 0.0 0.0 Travel Time (min) = 7.35 + 0.00 + 0.00 = 7.35 Total Travel Time, Tc.............................................................................. 29.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Crossing Impact #2 (Replace 20 LF culvert with 35' LF of 24" HDPE) Discharge Total Culvert Headwater Tailwater Outlet Tailwater Tailwater Names Discharge Discharge Elevation (ft) Depth (ft) Velocity (ft/s) Velocity (ft/s) Elevation (ft) cfs cfs 10 yr 6.70 6.70 9.59 2.30 2.66 0.00 9.00 25 yr 7.70 6.99 9.63 2.30 2.78 0.00 9.00 TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Impact #3 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 125.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.70 0.00 0.00 Travel Time (min) = 16.49 + 0.00 + 0.00 = 16.49 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area ((sqft)) = 162.82 64.00 0.00 Wetted perimeter ((ft)) = 9.82 7.66 0.00 Channel slope (%) = 0.20 0.15 0.00 Manning's n-value = 0.025 0.025 0.015 Velocity (ft/s) = 3.18 2.38 0.00 Flow length (ft) = 0.0 2500.0 0.0 Travel Time (min) = 0.00 + 17.53 + 0.00 = 17.53 Total Travel Time, Tc.............................................................................. 34.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Crossing Impact #3 (Replace 20 LF culvert with 30 LF 36" HDPE) rge Total Culvert tftr Outlet erft/s lwater Names Discharge Discharge Elevation ft Depth P Velocity ft/s y Velocity Eel ation ft cfs cfs 10 yr 13.90 13.90 9.25 2.20 2.37 0.00 9.00 25 yr 16.00 16.00 9.32 2.20 2.72 0.00 9.00 TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Impact #5 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 175.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 1.00 0.00 0.00 Travel Time (min) = 18.71 + 0.00 + 0.00 = 18.71 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area ((sqft)) = 144.00 100.00 0.00 Wetted perimeter ((ft)) = 12.60 8.66 0.00 Channel slope (%) = 0.18 0.05 0.00 Manning's n-value = 0.025 0.025 0.015 Velocity (ft/s) = 2.45 1.47 0.00 Flow length (ft) = 970.0 360.0 0.0 Travel Time (min) = 6.61 + 4.09 + 0.00 = 10.69 Total Travel Time, Tc.............................................................................. 29.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Crossing Impact #5 (36" culvert — 50 LF) rge Total Culvert tftr Outlet erft/s lwater Names Discharge Discharge Elevation ft Depth P Velocity ft/s y Velocity Eel ation ft cfs cfs 10-yr 19.60 1.98 14.26 2.66 0.32 0.00 14.26 25-yr 22.40 2.12 14.27 2.66 0.34 0.00 14.26 TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Impact #6 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 190.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 1.00 0.00 0.00 Travel Time (min) = 19.98 + 0.00 + 0.00 = 19.98 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area ((sqft)) = 144.00 201.64 0.00 Wetted perimeter ((ft)) = 12.60 10.33 0.00 Channel slope (%) = 0.20 0.20 0.00 Manning's n-value = 0.025 0.025 0.015 Velocity (ft/s) = 2.58 3.30 0.00 Flow length (ft) = 2400.0 1500.0 0.0 Travel Time (min) = 15.51 + 7.58 + 0.00 = 23.08 Total Travel Time, Tc.............................................................................. 43.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Crossing Impact #6 ( Two 36" culverts — 50 LF) rge Total Culvert tftr Outlet erft/s lwater Names Discharge Discharge Elevation ft Depth P Velocity ft/s y Velocity Eel ation ft cfs cfs 10-yr 35.00 35.00 7.66 2.28 2.99 0.38 7.28 25-yr 40.50 40.50 7.75 2.35 3.41 0.39 7.35 TR55 Tc Worksheet Hydraflow Express by Intelisolve SCS Albemarle Beach - Wetland Crossing A Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.70 0.00 0.00 Travel Time (min) = 33.22 + 0.00 + 0.00 = 33.22 Shallow Concentrated Flow Flow length (ft) = 170.00 0.00 0.00 Watercourse slope (%) = 0.70 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.35 0.00 0.00 Travel Time (min) = 2.10 + 0.00 + 0.00 = 2.10 Channel Flow X sectional flow area ((sqft)) = 6400.00 189225.00 0.00 Wetted perimeter ((ft)) = 110.00 200.00 0.00 Channel slope (%) = 0.60 0.10 0.00 Manning's n-value = 0.100 0.100 0.015 Velocity (ft/s) = 0.93 0.79 0.00 Flow length (ft) = 1100.0 0.0 0.0 Travel Time (min) = 19.66 + 0.00 + 0.00 = 19.66 Total Travel Time, Tc.............................................................................. 55.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Wetland Crossing A (2 — 24" HDPE Culverts) rge Total Culvert tftr Outlet erft/s lwater Names Discharge Discharge Elevation ft Depth P Velocity ft/s y Velocity Eel ation ft cfs cfs 10-yr 7.10 7.10 6.95 0.12 3.86 1.10 5.02 25-yr 8.30 8.30 7.04 0.13 4.06 1.16 5.03 TR55 Tc Worksheet Hydraflow Express by Intelisolve SCS Albemarle Beach - Wetland Crossing B Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.80 0.00 0.00 Travel Time (min) = 31.49 + 0.00 + 0.00 = 31.49 Shallow Concentrated Flow Flow length (ft) = 425.00 0.00 0.00 Watercourse slope (%) = 0.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.44 0.00 0.00 Travel Time (min) = 4.91 + 0.00 + 0.00 = 4.91 Channel Flow X sectional flow area ((sqft)) = 144.00 189225.00 0.00 Wetted perimeter ((ft)) = 12.60 200.00 0.00 Channel slope (%) = 0.28 0.10 0.00 Manning's n-value = 0.026 0.100 0.015 Velocity (ft/s) = 2.93 0.79 0.00 Flow length (ft) = 600.0 3600.0 0.0 Travel Time (min) = 3.41 + 75.66 + 0.00 = 79.07 Total Travel Time, Tc.............................................................................. 115.00 min 3 N n 352000 35o 54' 54" N g 35' 53' 5T' N 352000 352200 352400 352600 352800 3 m Map Scale: 1:8,430 if printed on A porb-ait (8.5" x 11") sheet " Meters NN 0 10D 20D 40D 600 Feet k0 400 S00 1600 2400 Map projedion: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Soil Map —Washington County, North Carolina (Wetland Crossing C Drainage Area) 352200 352400 352600 352800 M3 M M n 3532M 35' 54' 54" N 8 35' 53' 5T' N 353200 3 F 5/22/2020 Page 1 of 3 Soil Map —Washington County, North Carolina Wetland Crossing C Drainage Area Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AaA At Altavista fine sandy loam, 0 to 2 percent slopes 19.5 7.8 14.9% 6.0% Augusta fine sandy loam BoA Bojac loamy fine sand, 0 to 3 percent slopes 1.9 1.4% Dr Dorovan mucky silt loam, overwash (Chowan) 7.0 5.3% Ds Dragston loamy fine sand 5.8 4.5% Ro Roanoke loam 28.2 21.6% To Tomotley fine sandy loam 9.2 7.0% Wa Wahee fine sandy loam 9.7 7.4% WkB Wickham loamy sand, 0 to 4 percent slopes 41.7 31.9% Totals for Area of Interest 130.9 100.0% USDA Natural Resources Web Soil Survey 5/22/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 Wetland Crossing B Drainage Area Curve Number total area 140 ac CN AaA C meadow 71 15% 10.65 At C woods 73 3% 2.19 C meadow 71 3% 2.13 BoA B meadow 58 2% 0.87 Ds C woods 73 0% 0 C meadow 71 5% 3.55 Dr D woods 79 5% 3.555 Ro D woods 79 17% 13.43 meadow 78 5% 3.9 To B meadow 58 7% Wa D meadow 78 7% 5.46 WkB B woods 60 5% 3 meadow 58 27% 15.66 100 % 64.395 Hydrology Report Hydraflow Express by Intelisolve Albemarle Beach - Wetland Crossing B Hydrograph type = SCS Storm frequency (yrs) = 10 Drainage area (ac) = 148.000 Basin Slope (%) = See Worksheet Tc method = TR55 Total precip. (in) = 5.74 Storm duration (hrs) = 24 Q (cfs) 50.00 40.00 i1 11 20.00 10.00 Runoff Hydrograph 10-yr frequency 3.0 6.0 9.0 12.0 15.0 Runoff Hyd - Qp = 45.32 (cfs) Thursday, May 28 2020, 11:36 AM Peak discharge (cfs) = 45.32 Time interval (min) = 1 Curve number (CN) = 64 Hydraulic length (ft) = See Worksheet Time of conc. (min) = 115 Storm Distribution = Type III Shape factor = 200 Hydrograph Volume = 1,117,848 (cuft); 25.662 (acft) Q (cfs) 50.00 40.00 !C 1 1 1 20.00 10.00 0.00 18.0 21.0 24.0 27.0 30.0 33.0 Time (hrs) HY-8 Analysis Results Customized Table Culvert Crossing: Crossing B — (3) 30" HDPE Culverts rge Total Culvert tftr Outlet erft/s lwater Names Discharge Discharge Elevation ft Depth P Velocity ft/s y Velocity Eel ation ft cfs cfs 10-yr 45.30 45.30 5.83 0.85 5.87 0.32 4.45 25-yr 68.90 68.90 6.90 1.10 7.02 0.38 4.70 TR55 Tc Worksheet Hydraflow Express by Intelisolve SCS Albemarle Beach - Wetland Crossing C Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.60 0.00 0.00 Travel Time (min) = 134.81 + 0.00 + 0.00 = 134.81 Shallow Concentrated Flow Flow length (ft) = 650.00 0.00 0.00 Watercourse slope (%) = 0.60 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 1.57 0.00 0.00 Travel Time (min) = 6.88 + 0.00 + 0.00 = 6.88 Channel Flow X sectional flow area ((sqft)) = 156025.00 0.00 0.00 Wetted perimeter ((ft)) = 295.00 0.00 0.00 Channel slope (%) = 0.12 0.00 0.00 Manning's n-value = 0.100 0.015 0.015 Velocity (ft/s) = 0.63 0.00 0.00 Flow length (ft) = 6750.0 0.0 0.0 Travel Time (min) = 179.24 + 0.00 + 0.00 = 179.24 Total Travel Time, Tc.............................................................................. 321.00 min 3 Soil Map —Washington County, North Carolina 3 M M 350500 350700 350900 351100 351300 351500 351700 351900 352100 350 55' 10" N 35' 55' 1Y' N MOE , r,- D o ! m g — r J 35o 53' 53" N 35' 53' 53" N 350500 350700 350900 351100 351300 351500 351700 351900 352100 3 3 Map Scale: 1:11,500 if printed on A portrait (8.5" x 11") sheet. M Meters N 0 15D 300 6D0 9D0 Feet 0 500 1000 2000 3000 Map projection: Web Mercator Comer coordinates: WG584 Edge tics: UTM Zone 18N WGS84 USDA Natural Resources Web Soil Survey 5/13/2020 Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map —Washington County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AaA At Altavista fine sandy loam, 0 to 2 percent slopes 17.4 9.9 4.4% 2.5% Augusta fine sandy loam CIA Conetoe loamy fine sand, 0 to 3 percent slopes 9.2 2.3% DgA Dogue fine sandy loam, 0 to 3 percent slopes 35.7 9.0% Dr Dorovan mucky silt loam, overwash (Chowan) 24.6 6.2% Ro Roanoke loam 214.4 54.0% Wa Wahee fine sandy loam 37.3 9.4% WkB Wickham loamy sand, 0 to 4 percent slopes 48.8 12.3% Totals for Area of Interest 397.3 100.0% USDA Natural Resources Web Soil Survey 5/13/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 Wetland Crossing C Drainage Area Curve Number total area 400 ac CN AaA C meadow 71 4% 2.84 At C meadow 71 2% 1.42 CtA A woods 36 3% 1.08 DgA C woods 73 2% 1.46 meadow 71 7% 4.97 Dr D woods 79 6% 4.74 Ro D woods 79 35% 27.65 meadow 78 19% 14.82 To B D Wa D meadow 78 9% 7.02 WkB B woods 60 4% 2.4 meadow 58 9% 5.22 100% 73.62 Hydrology Report Hydraflow Express by Intelisolve Albemarle Beach - Wetland Crossing C Hydrograph type = SCS Storm frequency (yrs) = 10 Drainage area (ac) = 400.000 Basin Slope (%) = See Worksheet Tc method = TR55 Total precip. (in) = 5.74 Storm duration (hrs) = 24 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.0 Runoff Hydrograph 10-yr frequency Monday, May 18 2020, 9:11 AM Peak discharge (cfs) = 82.04 Time interval (min) = 1 Curve number (CN) = 73 Hydraulic length (ft) = See Worksheet Time of conc. (min) = 321 Storm Distribution = Type III Shape factor = 200 Hydrograph Volume = 4,174,422 (cuft); 95.832 (acft) Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 4.0 8.0 12.0 16.0 20.0 24.0 28.0 32.0 36.0 40.0 44.0 Time (hrs) Runoff Hyd - Qp = 82.04 (cfs) TR55 Tc Worksheet Hydraflow Express by Intelisolve SCS Albemarle Beach - Wetland Crossing C Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.60 0.00 0.00 Travel Time (min) = 134.81 + 0.00 + 0.00 = 134.81 Shallow Concentrated Flow Flow length (ft) = 650.00 0.00 0.00 Watercourse slope (%) = 0.60 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 1.57 0.00 0.00 Travel Time (min) = 6.88 + 0.00 + 0.00 = 6.88 Channel Flow X sectional flow area ((sqft)) = 156025.00 0.00 0.00 Wetted perimeter ((ft)) = 295.00 0.00 0.00 Channel slope (%) = 0.12 0.00 0.00 Manning's n-value = 0.100 0.015 0.015 Velocity (ft/s) = 0.63 0.00 0.00 Flow length (ft) = 6750.0 0.0 0.0 Travel Time (min) = 179.24 + 0.00 + 0.00 = 179.24 Total Travel Time, Tc.............................................................................. 321.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Wetland Crossing C — (5) 36" Culverts rge Total Culvert tftr Outlet erft/s lwater Names Discharge Discharge Elevation ft Depth P Velocity ft/s y Velocity Eel ation ft cfs cfs 10 year 82.00 82.00 5.49 0.89 5.62 0.33 4.39 25 year 115.50 115.50 6.01 1.09 6.38 0.38 4.59