Loading...
HomeMy WebLinkAbout20131279 Ver 3_Hatteras Inlet - South Ferry Channel - Update_20200609From: Ken Willson To: Coats, Heather; Pelletier, Josh R CIV CESAW CESAD (US); Dunn. Maria T.; Spivey, Kelly; Scarbraugh, Anthony Cc: Brent Johnson (Brent.johnson(oldarenc.com); Brad Rosov; Winslow, Lancelot D Subject: [External] RE: Hatteras Inlet - South Ferry Channel - Update Date: Friday, June 12, 2020 1:47:57 PM Attachments: imaae001.Dna 18FANINIONPExternal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam(cDnc.eov ON I am providing another update on the SFC Dredge Maintenance Project for the end of the week. The State Dredge Manteo continues to battle through challenges with weather, strong tidal conditions, and furloughs, which have shortened the days. As of the start of this week, NC DOT had reported that they had progressed approximately 650 ft and had approximately the same amount of distance remaining. They are making progress across the most shoaled in area; however, they will not be completed by Monday (June 15). The USACE permit and associated coordination allows for relief through the end of June; however, the NC DCM has only granted relief through June 15. Dare County has requested additional relief from the NC DCM and we are awaiting word on a decision. Please reach out to me with any questions or comments. Kind Regards, Ken Willson Senior Project/Program Manager Main: 910-399-1905 Mobile: 910-443-4471 kwillson(@coastalprotectioneng.com Coastal Protection Engineering 4038 Masonboro Loop Road Wilmington, NC 28409 From: Ken Willson <kwillson@coastalprotectioneng.com> Sent: Tuesday, June 2, 2020 4:13 PM To: Heather Coats <Heather.coats@ncdenr.gov>; Pelletier, Josh R CIV CESAW CESAD (US) <Josh.R.Pelletier@usace.army.mil>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Spivey, Kelly <kelly.spivey@ncdenr.gov>; Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Cc: Brent Johnson (Brent.johnson@darenc.com) <Brent.johnson@darenc.com>; Brad Rosov <brosov@coastalprotectioneng.com>; Winslow, Lancelot D <Iwinslow@ncdot.gov> Subject: Re: Hatteras Inlet - South Ferry Channel - Update El Just providing a quick update on progress at South Ferry Channel (Hatteras Inlet). DOT continues to make progress with the Dredge Manteo. That said, State furloughs are going to impact dredge crews starting this week, which may slow the progress. We are working with NC DOT to get an update on progress, and projection of a completion date. If we believe additional time will be needed to achieve the required navigation connection, we will notify all of you as soon as we have some hard numbers on additional time needed. Kind Regards, Ken Willson Senior Project/Program Manager Main: 910-791-9494 Mobile: 910-443-4471 kwill son&coastalnrotectioneng. com [#]Coastal Protection Engineering 4038 Masonboro Loop Road Wilmington, NC 28409 From: Ken Willson Sent: Tuesday, May 26, 2020 11:11 AM To: Heather Coats <Heather.coatsPncdenr.gov>; Dunn, Maria T. <maria.dunn(@ncwildlife.org>; Spivey, Kelly <kelly.spivey(@ncdenr.gov>; Pelletier, Josh R CIV CESAW CESAD (US) <Josh.R.PelletierPusace.army.mil>; Scarbraugh, Anthony<anthony.scarbraugh(@ncdenr.gov> Cc: Brad Rosov <brosov(@coastalprotectioneng.com>; Brent Johnson (Brent.iohnson(@darenc.com) <Brent.johnson(@darenc.com>; Winslow, Lancelot D <Iwinslowl@ncdot.gov> Subject: RE: Hatteras Inlet - South Ferry Channel - Update om Please find attached the updated plans discussed on our pre -construction call on May 11. The updated plans show the survey data collected by DOT within the channel on May 6, 2020. The cross sections shown on sheet 4 of 4 also indicate that DOT intends to dig to the max depth allowed by the permit, which is -12.0 MLLW or -11.92 MLW. The total volume above the -12.0 MLLW within the channel has been computed to be approximately 141,000 cy. Please note that it is not the DOT's intention to remove all of the volume in the channel above the -12.0 MLLW, but rather to cut a channel across the most heavily shoaled areas of the channel. The dredge continued work throughout the weekend. We will provide another update at the end of the week. Please feel free to contact me with any questions. Kind Regards, Ken Willson Senior Project/Program Manager Main: 910-399-1905 Mobile: 910-443-4471 kwillson(@coastalprotectioneng.com Coastal Protection Engineering 4038 Masonboro Loop Road Wilmington, NC 28409 From: Ken Willson Sent: Friday, May 22, 2020 4:04 PM To: Heather Coats <Heather.coats(@ncdenr.gov>; 'Dunn, Maria T.' <maria.dunnna ncwildlife.org>; 'Spivey, Kelly' <kelly.spivey(@ncdenr.gov>; Pelletier, Josh R CIV CESAW CESAD (US) <Josh.R.Pelletier(@ usace.arm)t.mil>;'Scarbraugh, Anthony' <anthony.scarbraughl@ncdenr.gov> Cc: Brad Rosov<brosov(@coastalprotectioneng.com>; Brent Johnson (Brent.johnson(@darenc.com) <Brent.johnson(@darenc.com>; 'Winslow, Lancelot D' <Iwinslow(@ncdot.gov> Subject: RE: Hatteras Inlet - South Ferry Channel - Update 0 I'm writing to provide you an end of week update on the progress of the South Ferry Channel maintenance dredging. As previously stated, dredging began on May 15. The dredge was shut down on Monday for weather associated with Tropical Storm Arthur and on Weds and Thurs for maintenance. The dredge is back up and running today and is making progress. We will be able to provide the updated plan drawings on Tuesday of next week at which point, I'll provide another update. If you should have any questions, please feel free to reach out to any of the following: Ken Willson — (910) 443-4471 Brent Johnson — (757) 897-6625 Lance Winslow— (252) 333-7673 Kind Regards, Ken Willson Senior Project/Program Manager Main: 910-399-1905 Mobile: 910-443-4471 kwillson(@coastalprotectioneng.com Coastal Protection Engineering 4038 Masonboro Loop Road Wilmington, NC 28409 From: Ken Willson Sent: Monday, May 18, 2020 8:37 AM To: Heather Coats <Heather.coats(@ncdenr.gov>; Dunn, Maria T. <maria.dunn(@ncwildlife.org>; Spivey, Kelly <kelly.spivey(@ncdenr.gov>; Pelletier, Josh R CIV CESAW CESAD (US) <Josh.R.Pelletier(@usace.army.miI>; Scarbraugh, Anthony<anthony.scarbraugh(@ncdenr.gov> Cc: Brad Rosov<brosov(@coastalprotectioneng.com>; Brent Johnson (Brent. johnson(@darenc.com) <Brent.johnson(@darenc.com>; Winslow, Lancelot D <Iwinslow(@ncdot.gov> Subject: Hatteras Inlet - South Ferry Channel - Update ME I am writing to inform you that maintenance dredging operations of the South Ferry Channel near Hatteras Inlet began on Friday (May 15). Dredge operations are being conducted with the NC DOT pipeline Dredge Manteo. The work is being done under Dare County's Dept. of Army Permit SAW- 2016-02140 and CAMA Major Permit 129-16. We are waiting to receive pre -construction survey data from the NC DOT to update the plan drawings. We hope to be able to provide those updated plans this week. Please let me know if you have any questions. Ken Willson Senior Project/Program Manager Main: 910-399-1905 Mobile: 910-443-4471 kwillson(@coastalprotectioneng.com Coastal Protection Engineering 4038 Masonboro Loop Road Wilmington, NC 28409