Loading...
HomeMy WebLinkAbout20190554 Ver 2_MP-2 Dredge and Fill_20200615Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Area A - 36' Area B - 10' Length Area C - 22' Area D -.83' Area A - 46' Area B - 8' Width Area C - 16' Area D - 10' Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. clean earthen wetland soils C. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB EWL 1891 SF ❑None (ii) Describe the purpose of the excavation in these areas: The excavation is necessary to install a stormwater a 36' x 46' scour hole (Impact Area A) and two energy dissipators, one 10' x 8' (Impact Area B) and one 22' x 16' (Impact Area C) (see Supplemental Information for detials). d. High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL El This section not applicable a. Location of disposal area. b. Dimensions of disposal area. On -site C. (i) Do you claim title to disposal area? ®Yes [-]No ❑NA (ii) If no, attach a letter granting permission from the owner. The material will be spread out over the site d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ®NA (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), ❑Yes ®No ❑NA 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 3) or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of disposal in these areas: The material will be spread out across the site for planting trees and grass. (ii) If yes, how much water area is affected? 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 months? (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. h. Type of fill material. 4. OTHER FILL ACTIVITIES El This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brouqht to the site? ®Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or (ii) Amount of material to be placed in the water 0 other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (iii) Dimensions of fill area NA ❑CW ❑SAV ❑SB EWL 4241 SF ❑None (iv) Purpose of fill (ii) Describe the purpose of the fill in these areas: No fill is to be placed below MHW or NHW. Impact Area A - 36' x 46' (1437 SF / 0.033 AC) Impact Area B - 10' x 8' (80 SF / 0.002 AC) Impact Area D - Irregular (2372 SF / 0.054 AC) See attached Supplemental Information for details of these measures. 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Strict sediment and erosion control best management practices, An excavator, front-end loader, trackhoe and dump trucks will be such as silt fence and temporary sediment traps, will be in place used to complete the work. priro to performing any major land disturbing activities. 252-808-2808 :: 1-888-4RCOAST :: www.necoastaimananement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 3 of 3) C. (i) Will navigational aids be required as a result of the project? d O Will wetlands be crossed in transponing equipment to prcj= ❑Yes ®No ❑NA site? ®Yes ❑No ❑NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Logging mats will be used to transport heavy machinery to cross wetlands (see Supplemental Information for location of matting) 2/10/2020 (Rev 611512020) Date Preservation Point Project Name LW Investments, LLC Applicant Name Dana A. Lutheran for LW Invest ents LLC (see attached Agent Authorization) Applicant Signature 252.808.2808 :: 1.880-4RCOAST :: www.nccoast2tmana!lement.net revised: 12/26106