Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCS000594_MONITORING INFO_20190604
STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. �r000 l57 r DOC TYPE ❑FINAL PERMIT MONITORING REPORTS ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ D V' � () w 0 11 YYYYMMDD ORIGINAL STORMWATER DISCHARGE OUTFALL (SDO) RECEIVSNORING REPORT Permit Number NCS 000594 JUN 04 2019 CENTRAL FILES DWR SECTION FACILITY NAME SePRO. Research & Technology -Campus PERSON COLLECTING SAMPLE(S) Ben Willis CERTIFIED LABORATORY(S)Meritech. Inc. Lab # 165 Lab # Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Nash PHONE NO. 2{ 52 ) 301-7891 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 5 Outfali - �' ` No.. 'Date_ Sample Collected ` _ �>H"low�if,,app. 50050 _. C0610_` 625. p,. , , ,940' 11Q5- Total N Total.. =Rainfall��..r-' TAN TKN N 2 03 o c I T 5 Total AI tttg L.>. 001 4/1 9 / 1 9 0.53 4.2 6,68 0.14 17.0 29 0.551 002 0.53 0.2 1.45 2.41 5.0 8 0.232 003 4/1 9/1 9 0,53 0.2 1 2.61 4.22 1 41.0 38 1.25 004 4 / 0.53 0.1 1 1.00 1,93 18.0 7 0,305 005 411 I 0.53- 0.3 1 1.01 2.00 20.0 5 0.260 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? Dyes (.)no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements OutfaII Date ;50050 0055ti ; - , .: 00530 - 00400- No: Samples Total -Flow Total OBI &Grease. Nodes` -polar `< Total pH =: New Matar -� Collected , . & . (if applicable) ' Rainfall (Ef appl y O&GPI PH Suspended 3 0�1 Usage x , t r �. {Method lbbd EM_ ,Soitds - r' r _ �.sn a 1 w *: .molddly> �� .rs` 1MG, �� _ �nches� _._,. . . m p°�� i '��_ m IL. � ��= -� rt�'�� "� _. s alltno`. Form SWU-247, last revised 611212015 Page I of 5 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 000594 SAMPLES COLLECTED DURING CALENDAR YEAR: 5 (phis monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME 5ePRO Research & Technology Campus PERSON COLLECTING SAMPLE(S) Ben Will is CERTIFIED LABORATORY(S) Meritech, Inc. Lab # 165 Lab #1 Part A: Specific Monitoring Requirements COUNTY Nash PHONE. NO. 2( 52 ) 30 1- -M -- -- SIGNATURE OF PERMITTEE OR DESIGNEE RFOUIRFD ON PAGE 5. Outfall 'Date No.. Sample Collected 50050 1002.: 10z7 _.- 916 ':-000g2.1051_ 1055- - -.. Total. Flow.: if a . .: Total Rainfall,:: Total As , Total Cd ° ' .. -Total Ca - .. Total Cu Total Pb Total Mn - _• :molddlyr _n MG ; .. ...... inches:. .. _ :aid ;.. m L_ b.o18 001 4 / 1 9 / 1 9 0.53 < .010 <0.002 8.02 <0.010 0.167 002 4/19/19 0,53 <0.010 <0.002 4.20 0.124 <0,010 0.015 003 4/1 9 / 1 9 0.53 <0.010 <0.002 21.1 0.007 <0.010 0.053 004 4 / 1 9 119 0.53 <0.010 <0.002 12.2 0.019 <0.010 0.069 005 4/1 9 / 1 9 0.53- <0.010 <0.002 13.7 0.005 <0.010 0.072 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? ©yes ( no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements 'Outfall. No. .Date ,Sample 'Collected 50050. .00556 :00530 00400.' Total Flow (if applicable). Total" ., Rainfall' - Oil &Grease (if appl) . - " 'Non -polar. -O&G/TPH. -. (Method 1654`., ,S -Total 'Suspended Solids pH New Motor Oil usage mo/dd/yr MG_ i �nclies' -'° _m�/1 _m�L lint# ` al/mo.. Form SWU-247, last revised 611212015 o � 11/1 v Page 2 of 5 7 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 000594 SAMPLES COLLECTED DURING CALENDAR YEAR: (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME SePRO Research & Technology Campus _ PERSON COLLECTING SAMPLE(S) BenWillis CERTIFIED LABORATORY(S) Meritech, Inc. Lab # 165 Lab #i Part A: Specific Monitoring Requirements COUNTY Nash PFIONE NO. 2l 52) 301-7891 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 5. No:> Dte Sample_;, Sample Collected.. 50050 1067 4&65 937Outfall : 1092 Total ;Flaw if a Totaf. ' Rainfall m Total Mg°, Total Ni Total�P Total K Total Na Total Zn .. molddvr. ..- 'MG inches.', mg C m m 001 4 / 1 9 / 1 9 0.53 2,52 <0.010 1.16 11.6 3.56 0,046 002 4/19/19 0.53 0,575 <0.010 0,189 8.11 5.83 <0.010 003 4 / 9/1 9 0.53 5,81 <0.010 0,282 3.91 4.58 0,013 004 4 / 1 9 11 9 0.53 3.16 <0.010 0.040 3.20 8.01 0.887 005 4 / 9 / 1 9 0.53- 3.80 <0.010 0.051 3.78 8.89 0.029 Does this facility perfonn Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? ©yes ono (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall ,.No., _ Date . Sample - Collected-.:- `. .50050.- _ 00556 .. 00530 00400 Total Flow '(if applicable) Total Rainfall-.: Oil & Grease ;: (if appl.). Non -polar O&G/TPH (Method 1664 SGT.-HEM), if' Total Suspended Solids ... pH New Motor.. Oil usage moldd/vr :" ' MG inches:- i M211 m l unit . ' aUmo -m Form SWU-247, last revised 611212015 Page 3 of 5 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 000594 FACILITY NAME SePRO Research & Technology Campus PERSON COLLECTING SAMPLE(S) Ben Willi s CERTIFIED LABORATORY(S) Meritech, Inc. Lab H 165 Lab 4 Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Nash PHONE NO. 2(„52 ) 301-7891 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGES ;Outfsll No. Date _ .'... Sample Collected,*- 50050 46529' : 900 Total Flow (if app.) :Total µ Rainfall " _Hardness P H molddtyr MG inches : " = m �. Standard:" 001 19119 0.53 32 6.56 002 4/ 1 9/ 1 9 0.53 12 6.72 003 4/ 1 911 9 0.53 72 6 0 004 4 / 1 9 /1 9 0.53 48 6.44 005 4/ 1 9/ 1 9 0.53 48 6.37 Does this facility perform Vehicle Maintenance !Activities using more than 55 gallons of new rotor oil per month? C)yes Ono (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements 'Outfallw" `Date 50050 00556 00530 :00400 Total Flow Total Oil & Grease_ 'Non -polar Total. pH'-. _ New Motor . `" ISo. Sample _ Collected -(if applicable) Rainfall. (ifappl.) O&G/TPH Suspended - Oil Usage (Metfiotl 1664, Solids P SGT-HEM), if .wfa - appl., �. .mo/dd/yr � .MG inches:. in" I._ e,, - the/l �.., unit. al/mo.:_ Form SWU-247, lasr revised 611212015 Page 4 of 5 STORM EVENT CHARACTERISTICS: Date 411 9/1 9 Total Event Precipitation (inches): 0_53 Event Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Energy Mineral and Land Resources Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for [snowing violations." re ofa S. .r (Date) Form SWU-247, last revised 611212015 Page 5 of 5