Loading...
HomeMy WebLinkAboutNCS000589_MONITORING INFO_20190201STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. I" DOC TYPE ❑FINAL PERMIT Q7, MONITORING REPORTS 0 APPLICATION ❑ COMPLIANCE 0 OTHER DOC DATE ❑ jo) 9 () a v I YYYYMMDD DUKE ENERGY® PROGRESS January 25, 2019 Certified Mail # 7017 2680 0000 1260 9072 (2 copies) NC DEQ—DWR, Central Files p 1` 1617 Mail Service Center R E C E I V E D Raleigh, North Carolina 27699-1617 FEB 01. 2019 Subject: Weatherspoon's 4th Quarter 2018 rENTRAL FILES Stormwater Discharge Monitoring Report (DMR) Submitt UWR SECTION) Dear Sir or Madam: W. H. Weatherspoon Plant 491 Power Plant Rd Lumberton. NC 28358 Mailing Address: Kent Tyndall L. V. Sutton Energy Complex 801 Sutton Steam Plant Rd Wilmington, NC;28401 o: 910.341-4775 f : 910.341-4790 Duke Energy Progress, LLC submits in duplicate the fourth quarter 2018 Stormwater Discharge Monitoring Report for W. H. Weatherspoon. This submission is made in accordance with Part III, Section E of our NPDES Stormwater Permit No. NCS000589. A summary of parameters reported at concentrations above permit benchmarks is provided below. If there are any questions, please contact either: • Mr. Kent Tyndall, Environmental Professional for the W. H. Weatherspoon Plant; phone (910) 341-4775 or e-mail Kent.Tyndall@duke-energy.com; or • Mr. Steve Cahoon, Environmental Specialist at our North Carolina Regional Headquarters, phone (919) 546-7457 or email Steve.Cahoon@duke-energy.com. Please direct all correspondence to Kent Tyndall via the mailing address shown above. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. l am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Sincere) ( 64 Jeffrey Flanagan Station Manager STORM WATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS000589 FACILITY NAME W. H. Weatherspoon Plant PERSON COLLECTING SAMPLE(S) Kent Tyndall CERTIFIED LABORATORY (S)3 healy Environmental Services, Inc. Lab # 329 Duke Power Company LLC d/b/a Duke Energy Carolinas. LLC Lab # 249 Duke Energy Progress -Sutton Steam Electric Plant Lab # 5056 Part A: Specific Monitoring Re uirements SAMPLES COLLECTED DURING CALENDAR YEAR: 2018 ('Phis monitoring report shall he received by the Division no later than 30 days from the date the facility receives the sampling results from the lahotatory.) COUNTY PHONE NO. Robeson Kent Tyndall. o: 910-341-4775 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PACE, 2. Outfall No. Date Sample Collected 50050 00406 00530 01097 Total Flow (if app.) Total Rainfall pH Precip pH (if taken) TSS Non -Polar Oil & Grease Antimony (Sb) mo/dd/yr MG inches Units Units mg/L mgfL mgtL SW -I No Discharge SW-2 12/14/2018 NIA 129 8,02 110 <4.8 <0.00I SW-3 No Dischar =e Benchmark Value 6-9; (IF precip pH is lower, THEN lower threshold is precip pH.) 100 15 0.09 Outfall No. 01002 01012 01027 01034 01042 01051 71900'' 01067 01.147' Arsenic . (As) Beryllium (Be) Cadmium (Cd) Chromium (Cr) Copper (Cu) Lead (Pb) Mercury (H) Nickel (Ni) Selenium (Se) mg1L mg/L mg1L mgtL rngIL mg/L n m mg/L SW-1 SW-2 0.0025 <0.001 <0.001 0.00515 0.00975 0.0163 8.59 0.00437 <0.001 SW-3 Benchmark Value 0.34 0.065 0.003 0.9 0.01 0.075 12 0.335 0.056 Outfall No. 01077 01092 01022 01059 Silver (A) Zinc (Zn) Boron (B) Thalliium (TI) m m mg1L mg/L SW -I SW-2 <0.0002 0.077 <0.05 <0.000205 SW-3 Benchmark Value 0.0003 0126 Form SWU-247, last revised 21212012 Page I of 2 Facility Name W. H. Weatherspoon Plant Permit Number NCS000589 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements r►m Outfall No. Date Sample Collected ' 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids pH New Motor Oil Usage moldd/ r MG inches m91L m unit al/mo STORM EVENT CHARACTERISTICS: Mail Original and one copy to: Division of Water Quality Date 12/14/2018 Attn: Central Files Total Event Precipitation 1.63 (inches) 1617 Mail Service Center Event Duration (hours) (only if applicatle - see permit.) Raleigh, North Carolina 27699-1617 (if more than one storm event was sampled) Date Total Event Precipitation (inches) Event Duration (hours) (only if applicatle - see permit.) "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathereing the information, the information submitted is, to the best of my knowledge and belief , true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Jeffrey Flana� (Signature of A� 12-,g (Date) Form SWU-247, last revised 21212012 IN Page 2 of 2 Permit Number NCS 0 d 0 4 9q L1 5-7/ STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT , �/ SAMPLES COLLECTED DURING CALENDAR YEAR: 7I t I — 31 18 /)loRiS (This monitoring report shall be received by the Division no Iater than 30 days fro the date the facility receives the sampling results from the laboratory.) FACILITY NAME E 4 1 e- W fir - I { e-_+ n )_ PERSON COLLECTING SAMPLE(S) _ CER17IFYED LABORATORY(S) Lab # Part A: Specific Monitoring Requirements e Se - I Q krra_ %'f2 FEB 0 4 2019 GGNJIt +L FILES PWR S-EXTION, COUNTY �0 LJPrN PHONE NO. (336 ) 9 o5_ I i i I SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. Outfall No. Date Sample Collected 50050 Total Flow if app.) Total Rainfall mo/dd/ r MG inches A iv Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? Oyes ®no (if yes, complete Part B) Part R: Vehicle Maintenance Activity Mouitorin2 Requirements Outfall No. Date Sample Collected - 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appI.) Non -polar O&G/TPH (Method 1664 SGT-HEiV1), if appl. Total Suspended Solids p1l New Motor Oil Usage mo/dd/ r MG inches m /l mg/1 unit al/mo Form SWU-247, last revised 611212015 Page 1 of 2 STOR-Ml EVENT CHARACTERISTICS: Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit_) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of8nergy Mineral and Land Resources Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of lines and imprisonment for knowing violations." (Signature of Permittee) V41]« (Date) Form SWU-247, last revised 611212015 Page 2 of 2 Edge Water Treating, LLC WWTP Permit Number: NC0004944 Salisbury, North Carolina Rowan County Class WW-4 Durafiber Technology Lab #200 Storm water Discharge Outfall: Semi -Annual Start Date: 7/1/2018—12/31/2018 Outfall Numbers: A/ B/ C /D and 5 Narrative: Durafiber Tech has been in Bankruptcy since Oct 1, 2017 and all of their operational lines in the plant were shutdown at the end of March 2018. Since April, the new owners have not added any processes to the WWTP, only maintaining current permit. There have been no significant rainfall events during working hours, therefore no permitted flows coming from any of the five sampling points and no samples were obtained during the last 6 months. Most rainfall events were during closing hours, nights or on weekends. The total rainfall for the last 6 months has been 23.75 inches. Wastewater ORC William McDonald 336-905-1717 rhoward1@northstate.net