HomeMy WebLinkAboutNCS000575_MONITORING INFO_20191011STORMWATER DIVISION CODING SHEET
NCS PERMITS
PERMIT NO.
n/�s �O o -76
Y
DOC TYPE
❑,/FINAL PERMIT
CT MONITORING REPORTS
❑ APPLICATION
❑ COMPLIANCE
❑ OTHER
DOC DATE
❑ jol� / v t'
YYYYMMDD
DUKE
ENERGY GarryGeneral
anaget
® Plant General Manager
PROGRESS Asheville Steam Electric Plant
Duke Energy Progress
October 7, 2019 ASVL PLT j 200 CP&L Dr
Arden, NC 28704
Certified Mail: 7016 2140 0001 0231 1579
oi 828-687.5201
F. 828-687.5204
File Pt,: 12520-R garry.whisnant@cYuke-energy.com
NCDEQ
Division of Water Resources
Attention: Central Files
1617 Mail Service Center R
Raleigh, NC 27699-1617 �Ca
RE: Duke Energy Progress, LLC. GIT®��
NPDES SDOMR Year 4 Period I I st Quarter
Asheville Stcam Electric Plant- NCS000575 — Buncombe County
Dear Sir or Madam:
In accordance with Part III, Section E: l and E.2. of the above referenced stormwater
permit, Duke Energy Progress, LLC respectfully Submits, an original and one copy
of Year 4- Period I — Ist Quarter SDOMR for the facility stormwater outfalls.
During the above referenced sampling period, there were no treasurable stormwater events
during normal operating hours. Please note SW-7 and SW-8 have not been constructed and are
not included in this submittal.
Should you have any questions regarding this submittal or require additional information,
please contact Teresa Williams at 828-687-5240 or Tina Woodward at 704-382-4585.
"1 certify, tinder penalty of'law, that this rlor,ument and all attachments were prepared under my
direction or supervision in accordance with a systein designed to assure that guolified
personnel properly gather and evaluate the information submitted. Based on any inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information .submitted is, to the best of nay knowledge and belief,
true, accurate, and complete. I ant aware that there are significant penalties for submitting false
information, including the possibility of fines and imprisonment for knowing violations. "
Sincerely,
A
Garry A. Whisnant
Asheville Plant Manager
enclosure
www.duke-energy.com
STORMWATER DISCHARGE OUTFALL (SDO)
MONITORING REPORT
Permit Number NCS000575 SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 Year 4 Period 1 1st Qtr
(This monitoring report shall be received by the Division no later than 30 clays from
the date the facility receives the sampling results from the laboratory.)
FACILITY NAME Asheville Steam Electric Plant COUNTY Buncombe
PERSON COLLECTING SAMPLE(S) _ n1a PHONE NO. (_828_) 687-5201
LABORATORY(S) Na
Lab #
SIGNATURE OF PERMY17EE OR DESIGNEE
REQUIRED ON LAST PAGE.
Part A: Specific Monitoring Requirements
Outfall
No.
Date
Sample
Collected
No
Flow
YhN'
50050
Total
Flow if a
Total
Rainfall
mo/dd/vr
MC ;
inches
SW001
n'a
Yes
1KN0 FLOW AT THIS OUTFALL DURING THE )'EAR 4 PERIOD l 1st Qtr
NO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTED.
n'a
SWO03
nla
YeS
NO FLOW ATTHIS OUTFALL DURING THE YEAR 4 PERIOD 11st Qtr
MNO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTED.NO F LOAV AT THIS OUTFALL
n/a
Outfall
No.
Date
Sample
Collected
00400
00530 -
01097;fi
01002
01012
01022
01027
01034
01042
01051
01067
01147
01092
01077
01059
71900
pH -
Solids,,rotar
Suspended _
Concentration
Antimony,
Total(am c
Sb) `
Arsenic,
,Total as,
(As)
Beryllium,
Total (as
'Be)
-Boron„
'Total
(as,B)
Cadmium,
'rotaI (as'
Cd)
Chromium,
`Total (as
Cr)
Copper,
Total -
(asCu)-
Lead,-
Total
(asl'b)
Nickel,
Total
(as.Ni)
Selenium,
Total (as
Se)
Zinc,
'Total
(as7.n)
Silver,
Total (as
-Ag)
Thallium,
Total (as
71)
Mercur)',
Total,
Method
1631 E
mo/ddlyr,
SU
m /L
m /L;+.
m L
m /L
m L
m /L
m /L
-m /L
m /L
m L
m L'
m L
m /L
m /L
n IL
SWOOI
n1a
SW003
n1a
Outfall
No.
Date
Sample
Collected
00400:
00530
01097"1
01001
01012
01022
01027
01034
-01042
01051
01067
01147,
01092
01077
01059
71900
PH. j
Solicls; Total
Suspended
Concentration
Antimony',
Total (as.:
Sb)
Arsenic,
=Total as
(Xs),::.
Beryllium,
'Total (as
Be)
Boron,
Total
(as B)
Cadmium,
'Ibtal (as
Cd)
Chromium,
'Total (as
Cr)
Copper,
Total
'(as Cu)
Lead,
Total
`(as P,h)
Nickel,
Total
'(as-Ni)-
Selenium,
Total (as
Se)
'Line,
Total
(as Zn)
Silver,
Total (as
'Ag)
Thallium,
Total (as
'TI)
Nlercurv,
Total,
Method
1631 E
mo/dd/yr-
SU
mQ L
m /L i'l
m L
m L
m L
m /L"
m /L
m /L
mg_ /L
-m L•
mg IL
m /L
m IL•
m IL
n /L
SWOOI
n1a
SN'003
n1a
Based on Form SWU-247 Page 1 of 2
r,
Does this facility perform Vehicle lvlaintenance Activities using more than 55 gallons of new motor oil per month? _ yes X no
(if yes. complete Part B)
Part B: Vehicle Maintenance Activity Monitoring Requirements
Outfall
No.
Date
Sample
Collected)
•50050 :' - '`„
00556
00530•-
00400
Total Flow
(if applicableyq
Total
Rainfall
Oil.& Grease
(if appl.)
Non -polar
O&G/TPH
(Method 1664
SGT-HEM), if
appl.
Total
Suspended
Solids
PH"..
New Motor
Oil Usage .
molddl •r
MG F
.inches
mg/1
m Il'
unit
a[Imo
STOR11 EVENT CHARACTERISTICS:
Date n1a
Total Event Precipitation (inches):
Event Duration (hours): Wa (only if applicable — see permit.)
(if more than one storm event was sampled)
Date
Total Event Precipitation (inches):
Event Duration (hours): (only if applicable — see permit.)
Mail Original and one copy to:
Division of Water Quality
Attn: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of
my knowledge and belief, true, accurate, and complete. l am aware that there are significant penalties for submitting false information, including
the possibility of fines and imprisonment for knowing violations."
(Signature o0er mittee) (Date)
Form SWU-247, last revised 21212012
Page 2 of 2