Loading...
HomeMy WebLinkAboutNCS000575_MONITORING INFO_20191011STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. n/�s �O o -76 Y DOC TYPE ❑,/FINAL PERMIT CT MONITORING REPORTS ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ jol� / v t' YYYYMMDD DUKE ENERGY GarryGeneral anaget ® Plant General Manager PROGRESS Asheville Steam Electric Plant Duke Energy Progress October 7, 2019 ASVL PLT j 200 CP&L Dr Arden, NC 28704 Certified Mail: 7016 2140 0001 0231 1579 oi 828-687.5201 F. 828-687.5204 File Pt,: 12520-R garry.whisnant@cYuke-energy.com NCDEQ Division of Water Resources Attention: Central Files 1617 Mail Service Center R Raleigh, NC 27699-1617 �Ca RE: Duke Energy Progress, LLC. GIT®�� NPDES SDOMR Year 4 Period I I st Quarter Asheville Stcam Electric Plant- NCS000575 — Buncombe County Dear Sir or Madam: In accordance with Part III, Section E: l and E.2. of the above referenced stormwater permit, Duke Energy Progress, LLC respectfully Submits, an original and one copy of Year 4- Period I — Ist Quarter SDOMR for the facility stormwater outfalls. During the above referenced sampling period, there were no treasurable stormwater events during normal operating hours. Please note SW-7 and SW-8 have not been constructed and are not included in this submittal. Should you have any questions regarding this submittal or require additional information, please contact Teresa Williams at 828-687-5240 or Tina Woodward at 704-382-4585. "1 certify, tinder penalty of'law, that this rlor,ument and all attachments were prepared under my direction or supervision in accordance with a systein designed to assure that guolified personnel properly gather and evaluate the information submitted. Based on any inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information .submitted is, to the best of nay knowledge and belief, true, accurate, and complete. I ant aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. " Sincerely, A Garry A. Whisnant Asheville Plant Manager enclosure www.duke-energy.com STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS000575 SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 Year 4 Period 1 1st Qtr (This monitoring report shall be received by the Division no later than 30 clays from the date the facility receives the sampling results from the laboratory.) FACILITY NAME Asheville Steam Electric Plant COUNTY Buncombe PERSON COLLECTING SAMPLE(S) _ n1a PHONE NO. (_828_) 687-5201 LABORATORY(S) Na Lab # SIGNATURE OF PERMY17EE OR DESIGNEE REQUIRED ON LAST PAGE. Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected No Flow YhN' 50050 Total Flow if a Total Rainfall mo/dd/vr MC ; inches SW001 n'a Yes 1KN0 FLOW AT THIS OUTFALL DURING THE )'EAR 4 PERIOD l 1st Qtr NO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTED. n'a SWO03 nla YeS NO FLOW ATTHIS OUTFALL DURING THE YEAR 4 PERIOD 11st Qtr MNO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTED.NO F LOAV AT THIS OUTFALL n/a Outfall No. Date Sample Collected 00400 00530 - 01097;fi 01002 01012 01022 01027 01034 01042 01051 01067 01147 01092 01077 01059 71900 pH - Solids,,rotar Suspended _ Concentration Antimony, Total(am c Sb) ` Arsenic, ,Total as, (As) Beryllium, Total (as 'Be) -Boron„ 'Total (as,B) Cadmium, 'rotaI (as' Cd) Chromium, `Total (as Cr) Copper, Total - (asCu)- Lead,- Total (asl'b) Nickel, Total (as.Ni) Selenium, Total (as Se) Zinc, 'Total (as7.n) Silver, Total (as -Ag) Thallium, Total (as 71) Mercur)', Total, Method 1631 E mo/ddlyr, SU m /L m /L;+. m L m /L m L m /L m /L -m /L m /L m L m L' m L m /L m /L n IL SWOOI n1a SW003 n1a Outfall No. Date Sample Collected 00400: 00530 01097"1 01001 01012 01022 01027 01034 -01042 01051 01067 01147, 01092 01077 01059 71900 PH. j Solicls; Total Suspended Concentration Antimony', Total (as.: Sb) Arsenic, =Total as (Xs),::. Beryllium, 'Total (as Be) Boron, Total (as B) Cadmium, 'Ibtal (as Cd) Chromium, 'Total (as Cr) Copper, Total '(as Cu) Lead, Total `(as P,h) Nickel, Total '(as-Ni)- Selenium, Total (as Se) 'Line, Total (as Zn) Silver, Total (as 'Ag) Thallium, Total (as 'TI) Nlercurv, Total, Method 1631 E mo/dd/yr- SU mQ L m /L i'l m L m L m L m /L" m /L m /L mg_ /L -m L• mg IL m /L m IL• m IL n /L SWOOI n1a SN'003 n1a Based on Form SWU-247 Page 1 of 2 r, Does this facility perform Vehicle lvlaintenance Activities using more than 55 gallons of new motor oil per month? _ yes X no (if yes. complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected) •50050 :' - '`„ 00556 00530•- 00400 Total Flow (if applicableyq Total Rainfall Oil.& Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids PH".. New Motor Oil Usage . molddl •r MG F .inches mg/1 m Il' unit a[Imo STOR11 EVENT CHARACTERISTICS: Date n1a Total Event Precipitation (inches): Event Duration (hours): Wa (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. l am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature o0er mittee) (Date) Form SWU-247, last revised 21212012 Page 2 of 2