Loading...
HomeMy WebLinkAboutNCS000546_MONITORING INFO_20190414STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. nl C� o o o 7 DOC TYPE ❑�/FINAL PERMIT CT MONITORING REPORTS 0 APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE I� V 1 I ❑� V YYYYMMDD ('DUKE ENERGY April 8, 2019 NC Department of Environmental Quality Attention: Central Files Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Duke Energy Carolinas, LLC NPDES Storm water Discharge Monitoring Report for: Allen Steam Station — NCS000546 — Gaston County Allen Steam Station Duke Energy 253 Plant Allen Rd. Belmont, NC 28012 APR � 4 2a19 CEN1 tZ t FILES In accordance with Part III, E(2) of the above referenced NPDES Storm water permit, the original and one copy of the quarterly monitoring reports for Year 4 — Period 3 are attached. The period for sampling ended on March 31, 2019. Outfails SW001A, SW002, SW003, SW005, SW008, SW013-7, SW013-8, SW013-9, SW013- 10, SW013-11, SW013-12, SW013-13, SW013-14, SW013-15 and SW015. are listed as "No Qualifying Flow" during the period. Samples were not collected from these outfalls due to night time rainfall events, inclement weather or lack of qualifying rainfall events during the period. Please direct any correspondence or questions concerning the Allen Steam Station NPDES Stormwater Program to Elizabeth Glenn at (980) 373-0530. Yours truly, Terry Tuck, General Manager II Allen Steam Station Fossil Hydro- Carolinas West Attachments bc: w/attachment Elizabeth Glenn Tina Woodward Steve Hodges UPS Tracking: 1Z X67 601 24 9417 3918 STOWMWATE R DISCHARGE OUTFALL (SDO) ,ti9ONITORING REPORT Permit Number NCS 000546 SA,),-IPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring; report shall be received by the Division no later than 30 days from the date the facility receives the sampling; results from the laboratory.) FACILITY NAME Allen Steam Station PERSON COLLECTING SAMPLE(S) StaffNendor CERTIFIED LABORATORY(S) Duke Enerpv of the Carolinas, LLC Lab #248 Shealv Environmental Services, NC_Lab #329 Part A: Specific Monitoring, Requirements COUNTY Gaston PHONE NO. (70 ) 829-2350 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 3. Outfall Date 50050 Total No. Sample Collected Flow (if app.) moldd/ r MG S11'OOIA NA NA NO QUALIFYING FLOW AT "THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH ,MARCH 31, 2019. SWOO2 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH ,iNIARCH 31, 2019. SNVO03 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH MARCH 31, 2019. SW005 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH MARCH 31, 2019. SWOO8 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH R7ARCH 31, 2019. SWO13-7 NA NA NO QUALIFYING FLOW,AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH MARCH 31, 2019. SW013-8 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH MARCH 31, 2019. SWO13-9 NA NA NO QUALIFYING FLO1Y AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH MARCH 31, 2019. SWO13-10 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH MARCH 31, 2019. SW013-11 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 21119 THROUGH MARCH 31, 2019. SWO13-12 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH MARCH 31, 2019. SWO13-13 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 21119 THROUGH NIARCH 31, 2019. Farm SWU-247. lust revised 212/2012 Paue I of 3 SWO13-14 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH MARCH 31, 2019. SWO13-15 NA NA NO QUALIFYING FLOW AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3, JANUARY 1, 2019 THROUGH MARCH 31, 2019. SW015 NA NA NO QUALIFYING FLONV AT THIS OUTFALL DURING THE YEAR 4 PERIOD 3. THIS OUTFALL WAS ADDED TO THE STORMWATER PERNIIT ON NIARCH 7, 2019. Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? ,yes x no (if yes, complete Part I3) Part 13: Vehicle it'laintenance Activity iMonitoring Requirements Outfall No. Date Sample Collected 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids pH New Motor Oil Usage moldd/ r MG inches m m unit al/mo STORM EVENT CHARACTERISTICS: Date NIA Total Event Precipitation (inches): N/A Event Duration (hours): N/A (only if applicable — sec permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicahle — sec permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1 b 17 Form SWU-247. lust revised 21212012 Pave 2 of 3 "l certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. f am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." /t/ - JZI�L (Signature of q1S Z/7 (Date) Form SWU-247, last revised 2/212012 Pave 3 43 IDUKE VENERGY. April 8, 2019 NC Department of Environmental Quality Attention: Central Files Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Duke Energy Carolinas, LLC NPDES Storm Water Discharge Monitoring Report for: Allen Steam Station — NCS000546 — Gaston County Allen Steam Station 253 Plant Allen Ret Belmont, NC 25012 704 829-2587 In accordance with Part III, E(2) of the above referenced NPDES Storm Water permit, the original and one copy of the monthly monitoring reports for the outfalls that have been classified as Tier 2 or Tier 3 and are now subject to monthly sampling, are attached. The period for sampling ended on March 31, 2019, Enclosed is the DMR for outfalls SW001, SW007, SW009, SW010, SW016, SW018 and SW020.There were no samples collected from these outfalls and are listed as "No Qualifying Flow" for the sampling period. This was due to either nighttime rainfall events or lack of qualifying rainfall events. Please direct any correspondence or questions concerning the Allen Steam Station NPDES Storm Water Program to Elizabeth Glenn at (980) 373-0530. Yours truly, Jf� W . 14,`c,- Terry W. Tuck, General Manager II Allen Steam Station Duke Energy Carolinas, LLC Attachments bc: w/attachment Elizabeth Glenn Steve Hodges Tina Woodward UPS Tracking: 1Z X67 601 24 9417 3918 STORMWATER DISCHARGE OUTFALL (SDO) i\MONITORING REPORT Permit Number NCS000546 SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME Allen Steam Station COUNTY Gaston PERSON COLLECTING SAMPLE(S) NA PHONE NO. (704) 829-2350 CERTIFIED LABORATORY(S) Duke Energy Carolinas, LLC NC Lab #248 Shealy Environmental Services, Inc. NC Lab #329 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 3. Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected 50050 00400 01077 01002 01022 (11012 01027 Total Flow (if app.) Total Rainfall pH Silver, Total (as Ag) Arsenic, Total (as As) Boron, Total (as B) Beryllium, Total (as Be) Cadmium, Total (as Cd) mo/dd/ r MG inches m L m L m L mgfL m L SWOOI N/A NIA NO QUALIFYING FLOW FOR THE INIONTH OF MARCH 2O19 SWO07 N/A N/A NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 SW009 NIA N/A NO QUALIFYING FLOW FOR THE INIONTH OF MARCH 2O19 SWO10 N/A N/A NO QUALIFYING. FLOW FOR THE MONTH OF MARCH 2019 SWO16 N/A N/A NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 SWOIS NIA N/A NO QUALIFYING FLOW FOR THE MONTH OFMARCH 2019 SW020 NIA N/A NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 Outfall No. Date Sample Collected 01034 01042 01067 01051 01097 01147 01059 01092 Chromium, Total (as Cr) Copper, Total (as Cu) Nickel, Total (as NO Lead, Total (as Pb) Antimony, Total (as Sb) Selenium, Total (as Se) Thallium, Total (As TO Zinc, Total (as Zn) mo/dd/vr m L m L m m L m m L m L m SWOOI N/A NO UALIFYING FLOW FOR THE MONTH OF MARCH 2O19 SWO07 NIA NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 SW009 N/A NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 SWO10 N/A NO QUALIFYING FLOW FOR THE `MONTH OF MARCH 2O19 SWO16 N/A NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 SW018 N/A NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 SW020 N/A NO QUALIFYING FLOW FOR THE NIONTH OF MARCH 2O19 Permit Number NCS000546 Form SWU-247, last revised 21212012 Page 1 of 3 Outfall No. Date Sample Collected 71900 C0530 00556 Mercury, Total, Method 1631E Solids, Total Suspended - Concentration Oil & Grease molddl r n m L m L SWOOI NIA NO QUALIFYING FLOW FOR THE iNIONTH OF MARCH 2019 SIVO07 NIA NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2019 SW009 NIA NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 SWO10 NIA NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 SWO16 NIA NO QUALIFYING. FLOW FOR THE MONTH OF MARCH 2O19 SWO18 NIA NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 SW020 NIA NO QUALIFYING FLOW FOR THE MONTH OF MARCH 2O19 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per tnonih'? _ yes X no (il' yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall Date 50050 00556 00530 00400 No. Sample Total Flow Total Oil & Grease Non -polar Total pH New Motor Collected (if applicable) Rainfall (if appl.) O&G/TPH Suspended Oil Usage (Method 1664 Solids SGT-HEM), if appl. molddlvr MG J inches m m unit al/mo NOTE: March 2019 samples not collected due to unqualified rain events or adverse weather conditions. STOWNI EVENT CHARACTERISTICS: Date NA Total Event Precipitation (inches): NA Event Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only il' applicablc — see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Permit Number NCS000546 Form SWU-247. lust revised 21212012 Page 2 of 3 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Jtic,— S 1 (Signature of ermittee) (Dat ) Permit Number NCS000546 Form SWU-247, last remised 22/2012 Page 3 of 3