HomeMy WebLinkAboutNCS000324_MONITORING INFO_20191230STORMWATER DIVISION CODING SHEET
NCS PERMITS
PERMIT NO.
DOC TYPE
❑FINAL PERMIT
MONITORING REPORTS
❑ APPLICATION
❑ COMPLIANCE
❑ OTHER
DOC DATE
❑ I C I � 3 ()
YYYYMMDD
w
STORMWATER DISCHARGE O , ALL (SDO)
MONITORING REP
GENERAL PERMIT NO. NCS000324 SAMPL J COLLECTED DURING CALENDAR YEAR: 2019
CERTIFICATE OF COVERAGE NO. NA (This monitoring report is due at the Division no later than 30 days from
the date the facility receives the sampling results from the laboratory.)
FACILITY NAME: Consolidated Metco Inc. —Patton Avenue ��� � -.'COUNTY:, Union
PERSON COLLECTING SAMPLES: J. Thurman Horne, P.E. �1 PHONE NO. (704)289-6491
CERTIFIED LABORATORY: K & W Laboratories Lab # 559
SEC 3 ��19 PLEASE SIGN ON THE REVERSE 4
Part A: Specific Monitoring Requirements
O utfall
No z
`•°'
Date
Sample Collected;
_., _.:molddl r . =
= 00530
00400,,
78141 "
Total Suspended Solids,
= iit IL. , w . ,
pH; r
Staiidariiunits
Aluminum; mg/L::
r
Total Tortc Or`ganZcs',
Benchmark i`r
w,
a ...` ;:100
;.:.Within 6.0_= 9 0:. _
Q:75`:
a r.
1 _
001
10/30/ 19
8.0
6.71
0.18
N.A.
Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier I or Tier 2 responses.
See General Permit text.
Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes X no
(if yes, complete Part B)
Part B: Vehicle Maintenance Activity Monitoring Requirements
Outfall' :
No
Date -
Sample:eCollected,
niio/dd/ r _
_.:. _- =00556
00530 _
= 00400._ i
Oil'and'Grease; -
'- : ' m' Lw .
'- Total Suspended Solids
m /L
" pH;
:.Standard units
New,Motor 0i1 Usage, ,^- ;
Annual aera e. aUriao .
Benchmark:-
-; = • - `_ .
r '_ is `: 30:. , _
_ 100,.
6.4
Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier I or Tier 2 responses.
See General Permit text.
STORM EVENT CHARACTERISTICS:
Date 10/30/19 (first event sampled)
Total Event Precipitation (inches):_ 0.1
Date (list each additional event sampled this reporting period, and rainfall amount)
Total Event Precipitation (inches):
Mail Original and one copy to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
S WU-245-031308
Page I of 2
Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or e
manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject
to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.1 I; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for
electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31).
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The
solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ
the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I
certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or storm water
runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management
plan included in the Stormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
(Signature)
(Date)
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief,
true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including
the possibility of fines and imprisonment for knowing violations."
(S
Z 7//�
(Date)
S W U-245-0313 08
Page 2 of 2