HomeMy WebLinkAboutNCS000057_COMPLETE FILE - HISTORICAL_20190311-- --STORMWATER DIVISION GODINGSHEET , ..._ .
RESCISSIONS. �.
PERMIT NO.
NcS0000 J/
DOC'TYPE
COMPLETE FILE,- HISTORICAL
DATE OF
RESCISSION
YYYYMMDD
f
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
NCGNE
DOC TYPE
❑ HISTORICAL FILE
DOC DATE
❑
YYYYMMDD
STORMWATER DISCHARGE OUTFALL (SDO)
MONITORING REPORT
Permit Number-NCS000057 SAMPLES COLLECTED DURING CALENDAR YEAR: _2019____�
(This monitoring report shall be received by the Division no later than 30 days from
the date the facility receives the sampling results from the laboratory.)
FACILITY NAME Venator Chemicals, LLC
PERSON COLLECTING SAMPLE(S) Anc^ela Bak_e_r _
CERTIFIED LABORATORY(S) PACE Labs Lab U
Lab #
ry+AAf _ ? 2019
Part A: Specific Monitoring Requirements
CENTk/AL FILES
{D1f.tR S -_-T10;1
COUNTY Cabarrus
PHONE NO. (704) 455-4177
SIGNATURE OF PERMITTEE OR DESIGNEE
REQUIRED ON PAGE 2.
Outfall
Date
50050
tio.
Sample
Collected
Total
Flow if a
Total
Rainfall
Cu
Zn
TSS
COD
pH
moldd/yr
MC
inches
M /L
M /L
M /L
M /L
STD
001
2/20/2019
0.15
0.0152
0.101
4.2
ND
7.39
002
2/20/2019
0.15
0.0149
0.0616
3.2
ND
7.59
Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes _X no
(if yes, complete Part B)
Part S: Vehicle Maintenance Activity Monitoring Requirements
Outfall
No.
Date
Sample
Collected
50050
00556
00530
00400
Total Flow
(if applicable)
Total
Rainfall
Oil & Grease
(if appl.)
Non -polar
O&G/TPH
(Method 1664
SGT-HEM), if
appl.
Total
Suspended
Solids
pH
New Motor
Oil Usage
mo/dd/vr
MG
inches.
m /I
mg/1
unit
al/mo
Form SWU-247, last revised 21212012
Page I of 2
STORM EVENT CHARACTERISTICS:
Date 2/20/2019
Total Event Precipitation (inches): 0.15
Event Duration (hours): (only if applicable — see permit.)
(if more than one storm event was sampled)
Date
Total Event Precipitation (inches):
Event Duration (hours): (only if applicable — see permit.)
Mail Original and one cope to:
Division of Water Quality
Attn: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly, responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of tines and imprisonment for knowing violations."
(Signature of P�ittee)
-31-71
( 'ate)
Pone SWU-247, last revised 21212012
Page 2 of 2
i•
Environmental
Quality
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this form, please visit http5:,//deg.nc.gov/about/divisions/energy-tnineral -land -
resources /energy -mineral- land -perm its /stormwater-permits /npdes- industrial-sw#tab-4
Permit No.: N/C/A�/ O/4/ 0 / d/S /2/ or Certificate of Coverrag/e� No.:
Facility Name: LICAIA 70 A 1q/e4I S
County: 5.qx1eu-S Phone No.
Inspector: KCr-ey -9,410EIC
Date of Inspection:
Time of Inspection:
izaOlgolf
Total Event Precipitation (inches): a /r
All permits require qualitative monitoring to be performed during a "measurable storm event."
A "measurable storm event" is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DEMLR Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(Stghiiure of Permittee or Designee)
1. Outfall Description:
Outfall No�O U / Stru
Receiving Stream: n
Describe t e industrial activi ies
0 , 0 pv.-tt, - C IAAA(
7Il
re (pipe, ditch, etc.):
t occur within the Outfall drainage area:
SWU-242, Last modified 07/28/2017
Page 1 of 2
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors: 'ele%U/
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.): AJQAlt
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 0 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
0 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
L),
2 3 4 5
7. Is there any foam in the stormwater discharge? ®Yes O N
B. Is there an oil sheen in the stormwater discharge? o Yes ® No
9, Is there evidence of erosion or deposition at the outfall? o Yes ® No.
10. Other Obvious Indicators of Stormwater Pollution:
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last modified 07/28/2017
Environmental
Quality
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
Forguidance on filling out this form, please visit htt s: de .nc. v about divisions ner -mineral-land-
resources/energy-mitleral-land-permits/stormwater-permits/npdes-industrial-sw#tab-4
Permit No.: N/C/s/ O/4 / 0/U/2�/~%/ or Certificate of Coverage No.:
FacilityName: EAAA7Z% MI,644s GGG
County: 1}4-17 Phone No. 7o�I
Inspector:
Date of Inspection::U/
Time of Inspection:
Total Event Precipitation (inches): 6�1 J
All permits require qualitative monitoring to be performed during a "measurable storm event."
A "measurable storm event" is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DE Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(Sigjay6re of Permittee or Designee)
1. Outfall Description:
Outfall No.z& 40Stru
Receiving Stream:
Describe tht industrialtoctivitfes tha
V JUA,,.'tA- L 1114.,Vik
,3/7//
(pipe, ditch, etc.): ?
�=r2
ccur within the outfall drainage area:
SWU-242, Last modified 07/28/2017
Page 1 of 2
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors: e/�i9%L
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.): /l-d/`rE-
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
0 - 2 3 4 5
5. Floating Solids: Choose the number which best describes the amount of Floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
611;1 2 3 4 5
b. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? 0Yes ON
B. Is there an oil sheen in the stormwater discharge? ' O Yes ®No
9. Is there evidence of erosion or deposition at the outfall? O Yes ® No.
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last modified 07/28/2017