HomeMy WebLinkAboutNCGNE0876_COMPLETE FILE - HISTORICAL_20120809-___------__-____--__.--'_--'-_---__--' __----_--_-____---___-'_--_-------
STORMWATER DIVISION CODING SHEET
.NCG PERMITS
PERMIT NO.
NCGNE
YYYYMMDD
1
4�f
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Chuck Wakild, PE
Governor
Mr. Andy Miller
Triangle Brewing Company
918 Pearl Street
Durham, North Carolina 27701
Dear Mr. Miller:
Director
August 9, 2012
Dee Freeman
Secretary
Subject: No -Exposure Certification NCGNE0876
Triangle Brewing Company
Durham County
The Division has reviewed your submittal of the No -Exposure Certification for Exclusion from NPDES
Stormwater Permitting form and made a site visit to assess the potential for stormwater pollution. Based on our
observations and your submittal and signed certification of no exposure at the above referenced facility, the
Division is granting your conditional exclusion from permitting as provided for under 40 CFR 126.22(g), which is
incorporated by reference in North Carolina regulations.
Please note that by our acceptance of your no -exposure certification, you are obligated to maintain no -
exposure conditions at your facility. If conditions change such that your facility can no longer qualify for a
no -exposure exclusion, you are obligated to immediately obtain NPDES permit coverage for your stormwater
discharge. Otherwise, the discharge becomes subject to enforcement as an un-permitted discharge (subject
to civil penalties of up to $25,000 per day). Your conditional no -exposure exclusion does not expire.
However, you must self re -certify annually using the enclosed form, or obtain NPDES permit coverage for
any stormwater discharges from your facility. Please store the completed re -certification forms in order to
have them available during future inspections by DWQ.
Your conditional exclusion from permitting does not affect your facility's legal requirements to obtain
environmental permits that may be required under other federal, state, or local regulations or ordinances.
If you have any questions or need further information, please contact Dave Parnell at (919) 791-4200 or at
david.parnell@ncdenr.gov.
Sin erely, 1
i
Chuck /W' PE
Attachment:
cc: RRO Durham County No Exposure File
Stormwater Permitting Unit No -Exposure Files
one
North Carolina Division of Water Quality 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer !`oiIhCarolina
Internet: www.newaterguatity.erg location: 3800 Barrett Drive Raleigh, NC 27609 Fax (919) 788-7159 1-877.62a AdUrtilly
An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper
tj
No -Exposure Self Re -Certification Information: .
You are obligated to maintain no -exposure* conditions at your facility. If conditions change such that
your facility can no longer qualify for a no -exposure exclusion, you are obligated to immediately obtain
NPDES permit coverage for your stormwater discharge. Otherwise, the discharge becomes subject to
enforcement as an un-permitted discharge. State statute provides for fines of up to $25,000 per day for
un-permitted discharges.
Your conditional no -exposure exclusion must be self re -certified at least annually as follows:
- Complete the re -certification at a minimum of once per year using the included Self Re -
Certification Form.
(additional copies can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-5 )
- Maintain a record of re -certifications on file at the facility. Do not submit the re -certification to
DWQ unless requested. If requested, submit a copy of the re -certification to the Division and/or
the municipality in which the facility is located.
-During an inspection by DWQ or local government, provide the re -certifications immediately
upon request.
- Notify the Division of any changes in ownership, significant facility and/or activity changes, or if
the facility can no longer maintain no -exposure.
-Allow the NPDES permitting authority or, if discharging into a municipal separate storm sewer
system, the operator of the system, to: (1) inspect the facility; and (2) make such inspection reports
publicly available upon request.
* "No exposure" means that all industrial materials and activities are protected by a storm resistant shelter to
prevent exposure to rain, snow, snowmelt, and/or runoff. Industrial materials or activities include, but are not
limited to, material handling equipment or activities, industrial machinery, raw materials, intermediate
products, by-products, final products, or waste products. Material handling activities include the storage,
loading and unloading, transportation, or conveyance of any raw material, intermediate product, final product
or waste product. (40 CFR 122.26(g))
Information and forms related No -Exposure Certifications can be accessed on the website at:
http://portal.ncdenr,org/web/wq/ws/su/npdessw#tab-5
I
Permit: NCGNE0876 Effective:
SOC: Effective:
County: Durham
Region: Raleigh
Contact Person: Andy Miller
Compliance Inspection Report
Expiration: Owner: Triangle Brewing Co
Expiration: Facility: Triangle Brewing Co
918 Pearl St
Title:
Durham NC 27701
Phone: 919-683-2337
Directions to Facility:
NC Hwy 147 - exit 12 - Fayetteville Rd - turn right - corss Main - Liberty & Holloway streets - rt on Gilbert - left on Pearl St
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 08/07/2012 Entry Time: 01:00 PM Exit Time: 02:00 PM
Primary Inspector: David R Parnell Phone: 919-791-4260
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stormwater Discharge, No Exposure Certificate
Facility Status: ■ Compliant Q Not Compliant
Question Areas:
Miscellaneous Questions M Misc
(See attachment summary)
Page: 1
Permit: NCGNE0876 Owner - Facility: Triangle Brewing Co
Inspection Date: 08/07/2012 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
No Expposure Certification inspection: Entire site was observed. No floor drains discharging to environment or roof
exhausts that would transport dust through roof. Docks were observed. No debris or grain was noted around the docks.
Containers of used grains were on one dock - under shelter. Stressed the need for tight fitting lids to the plastic
containers in order to avoid spilling when transporting to clients picking them up. Grain bin was observed, no grain was
seen on the ground. This and the open plastic grain containers are the only potential areas of concern. Stressed the
need for good housekeeping when/if there is any grain on the ground surface. Andy Miller stated that they keep the site
free of grain to avoid any rats and that is not a problem. No fuel or other liquids on the site. No Exposure Certification is
approved.
Misc
Is the facility compliant?
Comment:
Yes No NA NE
Page: 2