Loading...
HomeMy WebLinkAboutNCGNE0876_COMPLETE FILE - HISTORICAL_20120809-___------__-____--__.--'_--'-_---__--' __----_--_-____---___-'_--_------- STORMWATER DIVISION CODING SHEET .NCG PERMITS PERMIT NO. NCGNE YYYYMMDD 1 4�f NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Chuck Wakild, PE Governor Mr. Andy Miller Triangle Brewing Company 918 Pearl Street Durham, North Carolina 27701 Dear Mr. Miller: Director August 9, 2012 Dee Freeman Secretary Subject: No -Exposure Certification NCGNE0876 Triangle Brewing Company Durham County The Division has reviewed your submittal of the No -Exposure Certification for Exclusion from NPDES Stormwater Permitting form and made a site visit to assess the potential for stormwater pollution. Based on our observations and your submittal and signed certification of no exposure at the above referenced facility, the Division is granting your conditional exclusion from permitting as provided for under 40 CFR 126.22(g), which is incorporated by reference in North Carolina regulations. Please note that by our acceptance of your no -exposure certification, you are obligated to maintain no - exposure conditions at your facility. If conditions change such that your facility can no longer qualify for a no -exposure exclusion, you are obligated to immediately obtain NPDES permit coverage for your stormwater discharge. Otherwise, the discharge becomes subject to enforcement as an un-permitted discharge (subject to civil penalties of up to $25,000 per day). Your conditional no -exposure exclusion does not expire. However, you must self re -certify annually using the enclosed form, or obtain NPDES permit coverage for any stormwater discharges from your facility. Please store the completed re -certification forms in order to have them available during future inspections by DWQ. Your conditional exclusion from permitting does not affect your facility's legal requirements to obtain environmental permits that may be required under other federal, state, or local regulations or ordinances. If you have any questions or need further information, please contact Dave Parnell at (919) 791-4200 or at david.parnell@ncdenr.gov. Sin erely, 1 i Chuck /W' PE Attachment: cc: RRO Durham County No Exposure File Stormwater Permitting Unit No -Exposure Files one North Carolina Division of Water Quality 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer !`oiIhCarolina Internet: www.newaterguatity.erg location: 3800 Barrett Drive Raleigh, NC 27609 Fax (919) 788-7159 1-877.62a AdUrtilly An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper tj No -Exposure Self Re -Certification Information: . You are obligated to maintain no -exposure* conditions at your facility. If conditions change such that your facility can no longer qualify for a no -exposure exclusion, you are obligated to immediately obtain NPDES permit coverage for your stormwater discharge. Otherwise, the discharge becomes subject to enforcement as an un-permitted discharge. State statute provides for fines of up to $25,000 per day for un-permitted discharges. Your conditional no -exposure exclusion must be self re -certified at least annually as follows: - Complete the re -certification at a minimum of once per year using the included Self Re - Certification Form. (additional copies can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-5 ) - Maintain a record of re -certifications on file at the facility. Do not submit the re -certification to DWQ unless requested. If requested, submit a copy of the re -certification to the Division and/or the municipality in which the facility is located. -During an inspection by DWQ or local government, provide the re -certifications immediately upon request. - Notify the Division of any changes in ownership, significant facility and/or activity changes, or if the facility can no longer maintain no -exposure. -Allow the NPDES permitting authority or, if discharging into a municipal separate storm sewer system, the operator of the system, to: (1) inspect the facility; and (2) make such inspection reports publicly available upon request. * "No exposure" means that all industrial materials and activities are protected by a storm resistant shelter to prevent exposure to rain, snow, snowmelt, and/or runoff. Industrial materials or activities include, but are not limited to, material handling equipment or activities, industrial machinery, raw materials, intermediate products, by-products, final products, or waste products. Material handling activities include the storage, loading and unloading, transportation, or conveyance of any raw material, intermediate product, final product or waste product. (40 CFR 122.26(g)) Information and forms related No -Exposure Certifications can be accessed on the website at: http://portal.ncdenr,org/web/wq/ws/su/npdessw#tab-5 I Permit: NCGNE0876 Effective: SOC: Effective: County: Durham Region: Raleigh Contact Person: Andy Miller Compliance Inspection Report Expiration: Owner: Triangle Brewing Co Expiration: Facility: Triangle Brewing Co 918 Pearl St Title: Durham NC 27701 Phone: 919-683-2337 Directions to Facility: NC Hwy 147 - exit 12 - Fayetteville Rd - turn right - corss Main - Liberty & Holloway streets - rt on Gilbert - left on Pearl St System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/07/2012 Entry Time: 01:00 PM Exit Time: 02:00 PM Primary Inspector: David R Parnell Phone: 919-791-4260 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stormwater Discharge, No Exposure Certificate Facility Status: ■ Compliant Q Not Compliant Question Areas: Miscellaneous Questions M Misc (See attachment summary) Page: 1 Permit: NCGNE0876 Owner - Facility: Triangle Brewing Co Inspection Date: 08/07/2012 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: No Expposure Certification inspection: Entire site was observed. No floor drains discharging to environment or roof exhausts that would transport dust through roof. Docks were observed. No debris or grain was noted around the docks. Containers of used grains were on one dock - under shelter. Stressed the need for tight fitting lids to the plastic containers in order to avoid spilling when transporting to clients picking them up. Grain bin was observed, no grain was seen on the ground. This and the open plastic grain containers are the only potential areas of concern. Stressed the need for good housekeeping when/if there is any grain on the ground surface. Andy Miller stated that they keep the site free of grain to avoid any rats and that is not a problem. No fuel or other liquids on the site. No Exposure Certification is approved. Misc Is the facility compliant? Comment: Yes No NA NE Page: 2