Loading...
HomeMy WebLinkAboutNCGNE0019_COMPLETE FILE - HISTORICAL_20050420STORMWATER DIVISION CODING SHEET .NCG PERMITS PERMIT NO. NCGNE oo DOC TYPE HISTORICAL FILE DOC DATE ❑ � o vs o y YYYYMMDD \NAMichael F. Fasley,Govemor `O\� William G. Ross ,lr., Secretary North Carolina Department of Environment and Natural Resources c Alan W. Klimek, 11. F. Director >� [Division of Water Quality p ^� Coiecn 11. Sullins, IDcputy (Director Division of Water Quality April 20, 2005 R Wayne Stewart Ladd Furniture Inc PO Box 26777 Greensboro, NC 27417 Subject: No Exposure Certification NCGNE0019 Clayton Marcus Co. Inc- Plant 5 & 9 - 3030 Failling Creek Rd Catawba County Dear Permittee: The Division has reviewed your submittal of the No -Exposure Certification for Exclusion from NPDES Stormwater Permitting form, which we received on March 16, 2001. We apologize for the extended period it has taken us to get back to you on this request and we appreciate your patience as we have worked through this process. Based on your submittal and signed certification of no exposure at the above referenced facility the Division is granting your certification as provided for under 40 CFR 126.22(g) which is incorporated by reference in North Carolina regulations. Please note that by our acceptance of your no exposure certification, you are obligated to maintain no exposure conditions at your facility. If conditions change such that your facility can no longer qualify for a no - exposure exclusion, you are obligated to immediately obtain NPDES permit coverage for your stormwater discharge. Otherwise, the discharge becomes subject to enforcement as an un-permitted discharge. Your conditional no -exposure exclusion expires in five years (April 30, 2010). At that time you must re -certify with the Division, or obtain NPDES permit coverage for any stormwater discharges from your facility. Your certification of no exposure does not affect your facility's legal requirements to obtain environmental permits that may be required under other federal, state, or local regulations or ordinances. If you have any questions or need further information, please contact Jonathan Diggs at (919) 733-5083 ext. 537, or at jonathan.diggs@ncmail.net. Sincerely, for Alan W. Klimek, P.E. cc: Mooresville Regional Office = Central Files — wlattachments Stormwater Permitting Unit Files N- C. Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 733-7015 4MENR Customer Service 1-877-623-6748 Clayton Marcus P.O. Box 100 Phone: (828) 495-2200 Co. Inc. Hickory, NC FAX: (828) 495-2260 A Men of 1AD01lAnolstory 28603 email: steague@laddnet.com Thursday, May 10, 2001 Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Attn: Mr. Bill Mills M AY 16 2001 I QENR - WATER QUALiTY POINT SOURCE BRANCH Subject: No Exposure Certification For Storm Water Permitting Dear Mr. Mills, On April 10th, we had a conversation by phone about the "No Exposure Certification" form for exclusion from Storm Water permitting. If I recall correctly, you told me that North Carolina did not require such a form but that I could use the EPA form which you faxed to me. You said to mail the filled out form back to you, which I have enclosed with this letter. If I'm not correct in doing so, please let me know. Thanks for your help. Sincerely, 4%a-q Steve Teague Engineer Manager cc: Meaux Thornton Form Approved United States Environmental Protection Agency OMB No. ZXO.0211 NPDES' A Washington, DC 20460 FORM �`�� E�� NO EXPOSURE CERTIFICATION for Exclusion from a ss�1t NPDES Storm Water Permitting Submission of this No Exposure Certification constitutes notice that the entity identified in Section A does not require permit authorization for Its storm water discharges associated with industrial activity in the State identified in Section B under EPA's Storm Water Multi -Sector General Permit due to the existence of a condition of no exposure. A condition of no exposure exists at an Industrial facility when all industrial materials and activities are protected by a storm resistant shelter to prevent exposure to rain, snow, snowmelt, and/or runoff. Industrial materials or activities include, but are not limited to, material handling equipment or activities, Industrial machinery, raw materials, Intermediate products, by-products, final products, or waste products. Material handling activities include the storage, loading and unloading, transportation, or conveyance of any raw material, intermediate product, final product or waste product. A storm resistant shelter Is not required for the following Industrial materials and activities: - drums, barrels, tanks, and similar containers that are tightly sealed, provided those containers are not deteriorated and do not leak. "Sealed' means banded or otherwise secured and without operational taps or valves; - adequately maintained vehicles used in material handling; and final products, other than products that would be mobilized in storm water discharges (e.g., rock salt). A No Exposure Certification must be provided for each facility qualifying for the no exposure excluslon. In addition, the exclusion from NPDES permitting Is available on a facility -wide basis only, not for individual outfalis. If any industrial activities or materials are or will be exposed to precipitation, the facility is not eligible for the no exposure exclusion. By signing and submitting this No Exposure Certification form, the entity In Section A Is certifying that a condition of no exposure exists at its facility or site, and Is obligated to comply with the terms and conditions of 40 CFR 122.26(g). ALL INFORMATION MUST BE PROVIDED ON THIS FORM Detailed Instructions for completing thls form and obtaining the no exposure exclusion are provided on pages 3 and 4. A. Facility Operator Information 1. Name: 1LIAIDIDI iFMiL1t,iiMUiRif-i I I i N 4 1 ,I 1..1..1._.1 1 1 1 1� 1 2.Phone: 1313Al2.dA1&213131 3. Mailing Address: a. Street: IR10iD to 7 7 7 b. City G E S B D R D c. State: INIC] d. Zip Code: 1?j71"t'l 1 17i - i(oil,i7 j B. Facility/Site Location Information 1.FacilityName: KiL ANiTIQiNi AAiRICIUISi- 1CA iliNiCI RtLili iJi+A 2. a. Street Address: 1,31013101 tFALiL[iINl61 ARiEiEiKt, 19101AIDl INIEI, I I I I I^1 b. City: 1Hi 11CiKlQiRjY1 I I I I I i I I i I 1 i 1 i i 1 c.County: 1CiAMAIWIBih 11 1I d. State: 11V -C l e. Zip Code: 12-1 Ci 16 1011 1 - 3. Is the facility located on Indian Lands? Yes ❑ No 4. Is this a Federal facility? Yes ❑ No 5. a. Latitude: d151 o oia , f I10f b. Longitude: I 'is, i ` as 13 4 j " 6. a. Was the facility or site previously covered under an NPDES storm water permit? Yes ❑ No b. If yes. enter NPDES permit number: 7. SIC/Activity Codes: Primary: 1211ZI Secondary (if applicable): l -t I I 1 8. Total size of site associated with industrial activity: 8. S acres 9. a. Have you paved or roofed over a formerly exposed, pervious area In order to qualify for the no exposure exclusion? Yes ❑ No b. It yes, please indicate approximately how much area was paved or roofed over. Completing this question does not disqualify you for the no exposure exclusion. However, your permitting authority may use this information in considering whether storm water discharges from your site are likely to have an adverse impact an water quality, In which case you could be required to obtain permit coverage. Less than one acre ❑ One to five acres ❑ More than five acres ❑ EPA Form 3510-11 (10-99) Page 1 of 4 S � .. } r + 1 i i .. .\ � � Form Approved NPDES �iEPA NO EXPOSURE CERTIFICATION for Exclusion from PIDEFORM OMS No. 2Approv 1 3510.11 NPDES Storm Water Permitting C. Exposure Checklist Are any of the following materials or activities exposed to precipitation, now or in the foreseeable future? (Please check either 'Yes" or 'No' in the appropriate box.) ff you answer "Yes" to any of these questions (1) through (11), you are not eligible for the no exposure exclusion. Yes No 1. Using, staring or cleaning industrial machinery or equipment, and areas where residuals from using, storing or cleaning industrial machinery or equipment remain and are exposed to storm water 2. Materials or residuals on the ground or in storm water inlets from spills/leaks 3. Materials or products from past industrial activity 4. Material handling equipment (except adequately maintained vehicles) El 5. Materials or products during loadinglunloading or transporting activities 6. Materials or products stored outdoors (except flnat products Intended for outside use (e.g., new cars] where exposure to storm water does not result in the discharge of pollutants) 7. Materials con tamed in open, deteriorated or leaking storage drums, barrels, tanks, and similar containers 8. Materials or products handledlstored on roads or railways owned or maintained by the discharger 9. Waste material (except waste in covered, non -leaking containers le.g., dumpsters]) 10. Application or disposal of process wastewater (unless otherwise permitted) VN 11. Particulate matter or visible deposits of residuals from roof stacks andlor vents not otherwise regulated (i.e., under an air quality control permit) and evident in the storm water outflow D. Certification Statement I certify under penalty of law that I have read and understand the eligibility requirements for claiming a condition of 'no exposure' and obtaining an exclusion from NPDES storm water permitting. I certify under penalty of law that there are no discharges of storm water contaminated by exposure to industrial activities or materials from the industrial facility or site identified in this document (except as allowed under 40 CFR 122.26(g)(2)). I understand that I am obligated to submit a no exposure certification form once every five years to the NPDES permitting authority and, if requested, to the operator of the local municipal separate storm sewer system (MS4) into which the facility discharges (where applicable), I understand that I must allow the NPDES permitting authority, or MS4 operator where the discharge Is into the local MS4, to perform inspections to confirm the oonditlon of no exposure and to make such inspection reports publicly available upon request. I understand that I must obtain coverage under an NPDES permit prior to any point source discharge of storm water from the facility. Additionally, t certify under penalty of law that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted is to the best of my knowledge and belief true, accurate and complete. 1 am aware that there are significant penalties for submitting false Information, Including the possibi* of fine and imprisonment for knowing violations, Print Name. f 1..A1l IN,rI t�rlEt!r�f��]ZT I I I I I t .I,.,t I I I I I I I I I Print Title: Signature: Date: EPA Form 3510-11 (W99) Page 2 of 4 NPDES Instructions for the NO EXPOSURE CERTIFICATION for Form Approved FORM ,�E� OMB No. 204D-0211 3510.11 Exclusion from NPDES Storm Water Permitting Who May File a No Exposure Certification Section B. Facility/Site Location Information Federal law at 40 CFR Part 122.26 prohibits point source discharges of Storm water associated with industrial activity to waters of the U.S. without a National Pollutant Discharge Elimination System (NPDES) permit. However, NPDES permit coverage is not required for discharges of storm water associated with industrial activities identified at 40 CFR 122.26(b)(14)(i)- (ix) and (A) if the discharger can certify that a condition of "no exposure" exists at the industrial facility or site. Storm water discharges from construction activities identified in 40 CFR 122.26(b)(14)(x) and (b)(15) are not eligible for the no exposure exclusion. Obtaining and Maintaining the No Exposure Exclusion This form is used to certify that a condition of no exposure exists at the industrial facility or site described herein. This certification Is onl a Ida e in jurisdictions where EPA is the NPDES Rermitting authorily and must be re -submitted at least once every five years. The industrial facility operator must maintain a condition of no exposure at its facility or site in order for the no exposure exclusion to remain applicable. If conditions change resulting in the exposure of materials and activities to storm water, the facility operator must obtain coverage under an NPDES storm water permit immediately. Where to File the No Exposure Certification Form Mail the completed no exposure certification form to: Storm Water No Exposure Certification Form 1200 Pennsylvania Avenue, NW Mail Code 4203M Washington, D.C. 20460 Completing the Form You must type or print, using uppercase letters. In appropriate areas only. Enter only one character per space (i.e., between the marks). Abbreviate if necessary to stay within the number of characters allowed for each item. Use one space for breaks between words. One form must be completed for each facility or site for which you are seeking to certify a condition of no exposure. Additional guidance on completing this form can be accessed through EPA's web site at www.epa.gov/owmisw. Please make sure you have addressed all applicable questions and have made a photocopy for your records before sending the completed form to the above address. Section A. Facility Operator Information 1. Provide the legal name of the person, firm, public organization, or any other entity that operates the facility or site described in this certification. The name of the operator may or may not be the same as the name of the facility. The operator is the legal entity that controls the facility's operation, rather than the plant or site manager. 2. Provide the telephone number of the facility operator. 3. Provide the mailing address of the operator (P.O. Box numbers may be used). Include the city, state, and zip code. All correspondence will be sent to this address. 1. Enter the official or legal name of the facility or site. 2. Enter the complete street address (if no street address exists, provide a geographic description (e.g., Intersection of Routes 9 and 55% dty, count)4 state, and zip code. Do not use a P.O. Box number. 3. Indicate whether the facility is located on Indian Lands. •4. Indicate whether the industrial facility is operated by a department or agency of the Federal Government (see also Section 313 of the Clean Water Act). 5. Enter the latitude and longitude of the approximate center of the facility or site in degrees/minutes/seconds. Latitude and longitude can be obtained from United States Geological Survey (USGS) quadrangle or topographic maps, by calling 1-(888) ASK-USGS, or by accessing EPA's web site at http:/twww.eR2.gov/owrrLtsw/industlindex.htm and selecting Latitude and Longitude Finders under the Resources/Permit section. Latitude and longitude for a facility in decimal form must be converted to degrees (°), minutes ('), and seconds (") for proper entry on the certification form. To convert decimal latitude or longitude to degreeslminuteslseconds, follow the steps in the following example. Example: Convert decimal latitude 45.1234567 to degrees (°), minutes ('). and seconds C1). a) The numbers to the left of the decimal point are the degrees: 45°. b) To obtain minutes, multiply the first four numbers to the right of the decimal point by 0,006: 1234 x 0.006 = 7.404, c) The numbers to the left of the decimal point In the result obtained in (b) are the minutes: T. d) To obtain seconds, multiply the remaining three numbers to the right of the decimal from the result obtained in (b) by 0.06: 404 x 0.06 = 24.24. Since the numbers to the right of the decimal point are not used, the result is 24". e) The conversion for 45,1234567 = 451 7' 24". 6. Indicate whether the facility was previously covered under an NPDES storm water permit. If so, Include the permit number. 7. Enter the 4-digit SIC code which identifies the facility's primary activity, and second 4-digit SIC code identifying the facility's secondary activity. If applicable. SIC codes can be obtained from the Standard Industrial Classification Manual, 1987, 8. Enter the total size of the site associated with industrial activity in acres. Acreage may be determined by dividing square footage by 43.560. as demonstrated in the following example. Example: Convert 54,450 ft2 to acres Divide 54,450 ft2 by 43,560 square feet per acre: 54,450 ft2 + 43,560 ft2lacre - 1.25 acres. 9. Check "Yes' or "No' as appropriate to indicate whether you have paved or roofed over a formerly exposed, pervious area (i.e., lawn, meadow, dirt or gravel road/parking lot) in order to qualify for no exposure. If yes, also Indicate approximately how much area was paved or roofed over and is now impervious area. EPA Form 3510-11 (10-99) Page 3 of 4 i instructions uctions for the NO EXPOSURE CERTIFICATION for Farm Approved 35110 11 rr.EPA Exclusion from NPDES Storm Water Permitting oMs No.204aoz11 Section C. Exposure Checklist Chock'Yes' or'No' as appropriate to describe the exposure conditions at your facility. 9 you answer 'Yes' to ANY of the questions (1) through (11) in this section, a potential for exposure exists at your site and you cannot certify to a condition of no exposure. You must obtain (or already have) coverage under an NPDES storm water permit. After obtaining permit coverage, you can institute modifications 10 eliminate the potential for a discharge of storm water exposed to industrial activity, and then certify to a condition of no exposure. Section D. Certiflcation Statement Federal statutes provide for severe penalties for submitting false information on this application form. Federal regulations require this application to be signed as follows: For a corporation: by a responsible corporate officer, which means: (i) president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; For a partnership or sots proprietorship: by a general partner or the proprietor; or For a municipal, State, Federal, or other public facility: by either a principal executive or ranking elected official. Paperwork Reduction Act Notice Public reporting burden for this certiFcation is estimated to average 1.0 hour per certification, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose to provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Send comments regarding the burden estimate, any other aspect of the collection of information, or suggestions for improving this form, including any suggestions which may increase or reduce this burden to: Director, OPPE Regulatory Information Division (2137), USEPA, 401 M Street, SW, Washington, D.C. 20460, Include the OMB control number of this form on any correspondence. Do not send the completed No Exposure Certification form to this address. EPA Form 3510-11 (10-99) Page 4 of 4