HomeMy WebLinkAboutNCG140158_MONITORING INFO_20150105SHE
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
/V C& / yu f 6
DOC TYPE
❑HISTORICAL FILE
ONITORING REPORTS
DOC DATE
❑ a,'� � S C) I 0 5
YYYYMMDD
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVER GE No. `NCG14,
FACILITY NAME: C
PERSON COLLECTING SAMPLES _ �' %-J. I%
CERTIFIED LABORATORY Lab #
Lab #
OPTIONAL INFO:
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: �-') ) y
SAMPLING PERIOD: [0 July -December
COUNTY Tc&Zj r�-,
❑ January -June
PHONE NO. ( )
ADD TO LISTSERVE? ❑YES NO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA VTrout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
PH
(Standard
Units]
TSS
(rng/L)
Event
Duration
(minutes]
Total 4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
H of Months in Tier
2 Sampling'
-
-
6-92
1002,1-
i�
JAN rz g5
I "L FILES
r
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 T55 benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)1
pH
(standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfall a
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling2
6-92
152
10oZ,3
HAS YOUR FACILITY HAD a OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO,[�
HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of Sample (or at end of monitoring, period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significa)yt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
L
—, J'
(Date!
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 O 1 El
FACILITY NAME: S'1i7j 4 e, , el-1,C rt
PERSON COLLECTING SAMPLES 4 kb /
CERTIFIED LABORATORY �5 Lab # i c?--)
Lab #
OPTIONAL INFO:
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: a"J 1 V
SAMPLING P RIOD: ❑ July -December Q January -June
COUNTY _A6 �_5,cS r
PHONE NO. (
ADD TO LISTSERVE? ❑YES EZNO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA Trout ❑Other,
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
PH
(Standard
Units)
TS5
(mg/L)
Event
Duration
[minutes)
Total a
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 SamplingZ
-
-
6-92
1002,3
-
-
-
l
�.P1
MAY 12-
GEC! T RAL
aB
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/i, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I.
For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Z 014
'ILES
)G
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part 13: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month —averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)i
pH
(Standard
Units)
TPH using method
1664A SGT HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfall ,
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling2
6-92
152
1002,5
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reoorts) within 30 days of receipt of samoie (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that re are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of a(Wttee) ( te)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2