Loading...
HomeMy WebLinkAboutNCG140135_MONITORING INFO_20190224titiJ 'R o STORMWATER DIVISION CODING SHEEP NCG PERMITS PERMIT NO. IV Cc DOC TYPE El HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ )o' j � D ) y YYYYMMDD 9 0 9 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF CO ERAGE NO. NCG14Q I _a f FACILITY NAME: b " e PERSON COLLECTING AMPLES CERTIFIED LABORATORY g!5C&4 MAje. 1J 1 Lab # Zje Lab # OPTIONAL INFO: Part A. Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR:0�� SAMPLING PERIOD: July -December January -June COUNTY A091W3fo PHONE N0. (�j ADD TO LISTSERVE? ❑YES NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units} TSS (mg/L) Event Duration (minutes] Total d Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) It of Months in Tier 2 Samplingx - - 5-92 100 '3 - ! tip . •J 2. -7. ZgQ z.a ri 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfaI] here. Please make sure to mark the sample period above- 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range, 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ` For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. :CFI T 0 FHB 2 :N, RAt iVlp, Permit Date: 7/1/2011-60/30/2015 Date of last pH meter calibration: 1 Last Revised 7/13/11 Page 1 of 2 C Part R: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month —averaged over a calendar year. Outfall No. Date Sample p Collected (mo/dd/yr)' pH {Standard Units} TPH using method 1664ASGT-HEM (mg/L) Total Suspended Solids (mg/Lj Event Duration (minutes) Total Rainfall' (in) New Motor oil Usage (gal/month) In Tier 2 Monthly Monitoring? Wn) i # of Months in Tier 2 Samplingz 6-9 is 100 2,1 I HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEE CES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO� HAVE YOU CONTACTED THE REGION? YES ❑ NO� Q REGIONAL OFFICE CONTACT NAME: TTTTTri����� Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring oeriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that a]Ified per a properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those pe o di ctly o ible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aw a at r e i ificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Ct (Sign ture of Per ittee) ' (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2of2