Loading...
HomeMy WebLinkAboutNCG140081_MONITORING INFO_20190203wSi'Z,,O STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V Cc, )LI 0v�I DOC TYPE El HISTORICAL FILE Q!, MONITORING REPORTS � � 1 � va o 3 DOC DATE ❑ YYYYMMDD STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 / Orig — State CERTIFICATE OF COVERAGE NO. NCG14 008 1 SAMPLE COLLECTION YEAR: 2019 0 Copy— State FACILITY NAME: Chandler Concrete Piedmont - Reidsville #104 SAMPLING PERIOD: ®July -December ❑ January -June 0 Copy— Plant PERSON COLLECTING SAMPLES: Philip Motsinger COUNTY Rockingham 0 Capy - File CERTIFIED LABORATORY:Pace Analytical Lab #633 PHONE NO. (336) 226-1181 OPTIONAL INFO: ADD TO LISTSERVE? DYES ®NO EMAIL: _ DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [--]Trout ®Other: WS-1111 NSW Part A: Stormwater Monitoring Requirements Date Sample Collected pH TS5 Total In Tier 2 # of Months in Outfall No. mm dd rOR ( / /Y (Standard Units) (mg/L] Rainfall a Monthly Monitoring? Tier 2 NO FLOW)' (in) IY/n) Sampling - - 6-9Z 1002,3 - - - 1 NO FLOW I N N/A No Discharge Observed during this period - 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles tRM), Mixing Drum Cleanout ( MD). Report more than one type if the waste -stream is commingled. 3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwater 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR, if the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. FEe o 3 2019 Permit Date: 8/1/2017-06/30/2022 D SECTlpA • Last Revised 07/27/17 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Non -Polar Oil & pH Grease using Total Suspended Event Total New Motor Oil In Tier 2 tt of Months in Outfall Date Sample {Standard method Solids Duration Rainfall' usage ' Monthly Tier 2 No. Collected Units) 1664{mg/L) EM (mg/L) (minutes) (in) {gal/month) Monitoring? Sampling2 jmo/dd/yr)1 (y/n) 6-92 1S2 1002,a N/A I— i1� *Vehicle Maintenance Not Performed at this Locatio zv HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO FTJ HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharge" resorts) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." re of Permittee) / Z 7 IZA (Date) / Permit Date: 8/1/2017- 6/30/2022 Last Revised 7/27/18 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE No. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete Piedmont - Reidsville Pit #104 PERSON COLLECTING SAMPLES: CERTIFIED LABORATORY:Pace Analytical Lab #633��; don LIMIT VIOLATIONS? YES ❑ NO ® FEB iV r� g 201g 3c, v J '" L F1 Part A: Wastewater Monitoring Requirements WR SEC7— n.S 4 QTR Orig — State 0 Copy - State 0 Copy - Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2019 SAMPLE QUARTER: ❑Jan -March ❑April -June ❑Jul -Sept ®Oct -Dec COUNTY: ROCKINGHAM PHONE NO. (336) 226-1181 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HOW ❑PNA ❑Trout ®Other: WS-III, NSW OPTIONAL INFO: Non -Polar Date Sample Type of Wastewater Total Suspended Settleable Oil & Grease Discharge Total Flow Outfall No. Collected' {VE, RM, MD) n (standard) Solids Solids using method Duration 7 {gallons/day} (mm/dd/yr) (mg/L) (mL/L) 16545GT--HEM6 {minutes) (mg/L) - - 6-93•4 303,5 53 (15)6 - - 2 10/17/19 VE RM MD 7.8 4.5 ND N/A 60 N/A 3 10/17/19 VE RM MD 8.1 2.6 ND N/A 45 N/A Discharge was result of rain event. - ' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 'if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gatherin the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties fg�ubmitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Pe Permit Date:8/1/2017-06/30/2022 1z-7 O (Da e) Last Revised 07/27/17 Page 2 of 2