Loading...
HomeMy WebLinkAboutNCG120101_MONITORING INFO_20200128ZIz 0 STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. v DOC TYPE ❑ HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ coyojJs YYYYMMDD it DUKE ENERGY® PROGRESS File: Mayo 12520-R Maya Steam Plant Duke Energy Progress 10660 Boston Road Roxboro, NC 27574 NC Division of Water Resources January 20, 2020 ATTENTION: Central Files 1617M ail Service Center Ralei h, North Carolina 27699-1617 JAN2g2020 Subject: 15A N. C. Admin. Code 2B .0506C-EN'Ti: ,, Mayo Electric Generating PlantDw-i P11_FS National Pollutant Discharge Elimination Systcma(NPDES) Number NCG 120101 Monofill Stormwater Discharge Outfall Monitoring Report Dear Sir or Madam: Please find enclosed the July through December, 2019 Mayo Monofill Stormwater Discharge Monitoring Report, with comments, for Permit Number NCG120101, SDO 002, for Duke Energy Progress, LLC, The Mayo Electric Generating Plant Monofill became operational November 7, 2014. 1 certify, nnler penalty of l(w, that this document and all attachments vrere prepared under- my direction or supervision in accordance tt,ith a sys7em designed to assure that qualified personnel properly gather and evaluate the inf )onation submitted. Based art my inquiry of the person or persons who manage the system, or- those persons directly responsible fur gathering the information, the information submitted is, to the hest of myknowledge rnrd belief, tare, accurate, and complete. 1 am a�t,are that there are significant penalties for.rubmitting f dse infrrrmation, including the possibilitY of fines and imprisonmentfor knotiring violations. Please contact Ms. Lori Tollie at (336) 554-4916, if there are any questions concerning the data in this submittal. Enclosures Sincerely, Tom Copolo - Manager Mayo Electric Generating Plant ' ! STORMWATER DISCHARGE OUTFALL (SDO) yMONITORING REPORT i Permit Number: NCS000580 SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratoy.)r FACILITY NAME Mayo Electric Steam Plant PERSON COLLECTING SAiMPLE(S) Heath Slade PHONE NO. CERTIFIED LABORATORY(S) Duke, Shealy Lab# 248 & 329 I _Mayo Plant Lab Lab #_5064_ i . Part A: Specific Monitoring Requir 1 ements COUNTY Person (336) 597-7398 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 3. Outfall No. 1 Date .Sample: Collected 1 t10400 39516 fl1119 00981 71901 01092 00530 Total Rainfall PH-" PCBs Copper' Total Selenium Total Mercury' Total Zinc' Total TSS 'Non -Polar Oil &Grease mo/dd/ r P% inches Standard RgA m m m m m m Benchmark 6-9 Detected 0.010 0.056 N/A' 0.126 100 15 002 No Flow t 010 12/17/19 @ 11:45 0.25 6.14 Not Tested 0.00253 <0.001 7.85 0.010 <2.5 ND <5.0 Outfall Additional Priority Pollutant Metals; 00999 01079 -00978 00998 01113 01118 01074 01114 01268 00982 No. Boron' !Ag' As Be Cd' Cr' Ni' Pb' Sb TV 0.00000 mg/l mg/1 mg/l mgll mg/l mg/l mgll mg/1 mgll mg/1 Benchmark N/A(monitor only) 0.0003 0.34 0.065 0.003 0.9 0.335 0.075 0.09 NIA (monitor only) i I 002 I 010 <0.05 <0.0002 <0.001 <0.001 <0.001 0.0017 0.00119 <0.001 <0.001 <0.0002 Form SWU-247, last revised 2212012 i Page 1 of 3 Footnotes: Permit # NCS000586 �Part Ii'Pa2e 7 of_l5) 4. For each sampled measureable storm event, the total precipitation must be recorded. An on -site rain gauge is required. Where isolated sites are unmanned for extended periods of time, a local rain gauge reading may be substituted for an on -site reading. r S. These parameters shall be monitored only if coal or coal ash is transported through the drainage areas of these outfalls during the semi-annual monitoring period in Table 2. s Footnotes: Permit # NCS000580 (. Part I1 Page 9 of 15 ) I 1. Hardness- dependent. Benchmark based on translation of dissolved value into total recoverable with an assumed hardness of 25 mg/I and a total suspended solids (TSS) concentration of 10 mg/l. t 2. Values above the North Carolina water quality standard for mercury (12 ng/1) should be noted on the DMR but do not trigger Tier responses. Concentrations infield blanks or method blanks associated with the sample may be subtracted from the results for that sample, as long as all documentation of the adjustment is provided with the DMR. 3. If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) r'rtust be documented to demonstrate background concentrations were below the benchmark pH range of 6- 9. Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month'? _yes _X_no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Re[Lirements Outfall Date 50050 00556 00530 00400 No. Sample,' Total Flow Total . Oil & Grease Non -polar • Total pH New Motor Collected (if.applicable) Rainfall (if appl.) O&G/TPH Suspended Oil Usage �i (Method 1.664 ' Solids t ,t SGT-HEM), if ( (' appl. ono/dd/ yr MG inches m m unit al/mo { r I Form SWU-247, last revised 21212012 Page 2 of 3 Comments: • Outfall 010: Tier One • Outfall 002: Tier Two STORM EVENT CHARACTERISTICS: I Date:12117119 i Total Event Precipitation (inches):0.25 Event Duration (hours): S hours 40 minutes (only if applicable - see permit.) k (if more than one storm event was sampled) i Date Total Event Precipitation (inches): Event Duration (hours): 1 (only if applicable - see permit.) s a ,Flail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." r, /-1 0 (Sig 0,164lot C. (Date) Form SWU-247, last revised 21212012 Page 3 of 3 Form SWU-247, lust revised 21212012 Pate 4 of 3 DUKE ENERGY. PROGRESS File: Nlavo 12520-R NC Division of Water Resources ATTENT1W Central Files 1617 Mail Service Center Raleigh. North Carolina 27699-1617 January 20, 2020 Mayo Steam Plant Duke Energy Progress 10660 Boston Road Roxbo(o, NC 27574 Subject: 15A N. C. Admin. Code 213.0506 Mayo Electric Generating Plant National Pollutant Discharge Elimination System (NPDES) Numher NCG 120101 Monofill Stormwater Discharge Outfall Monitoring Report Dear Sir or Madam: Please find enclosed the July through December, 2019 Mayo Monofill Stormwater Discharge Monitoring Report, with comments, for Permit Numher NCG120101, SDO 002. for Duke Energy Progress, LI-C. The Mayo Electric Generating Plant Monofill became operational November 7, 2014. 1 certif ' urrderpenalty of'law, that this document and till attachments were prepared under-nry direction or silper-vision in accordance with a system designed to assure that quctlifiecl personnel properly gather arrd evahuac the information submitted. Based on my inguirti• of the person or persons who manage the system, or those persons directly responsible forgathering the information, the itiformcttion submitted is, to the best of urr knowledge and belief tare, accurate, and complete. I am aware their !here are signific.'am penalties for submining false irr formation, irichuling the possibility of fines and imprisonment for knowing violations. Please contact Ms. Lori "Collie at (336) 854-4916, if there are any questions concerning the data in this submittal. Sincerely, Tom Copolo - Manager Mayo Electric Generating Plant Enclosures STORN-IWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number: NCS000580 SAIMPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME Mayo Electric Steam Plant COUNTY Person PERSON COLLECTING SANIPLE(S) Heath Slade PHONE NO. (336) 597-7398 CERTIFIED LABORATORY(S) Duke, Shealv Lab# 248 & 329 Nlavo Plant Lab Lab # 5064 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 3. Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected 410400 39516 01119 00981 71901 01092 00530 Total } Rainfal14 i pH PCBs Copper' Total Selenium Total Mercury' Total Zinc' Total TSS Non -Polar Oil & Grease mo/dd/ r inches Standard mo mo m m m m Benchmark 6-9 Detected 0.010 0.056 NIA'- 0.126 100 l5 002 No Flow 010 12/17/19 @ 11:45 0.25 6.14 Not Tested 0.00253 <11.001 7.85 O.Olo <2.5 ND <5.0 Outfall Additional Priority Pollutant Metals{ 00999 01079 00978 00998 01113 (11118 01074 01114 01268 00982 No. Boron Ag' As Be Cd' Cr' NO Pb' Sb TI' 0.00000 mg/1 ; mg/l mg/I mg/I mg/I mg/I mg/I mg/l mg/1 mg/I. Benchmark NIA(monitor only) 0.0003 0.34 0.065 0.003 0.9 0.335 1 0.075 0.09 NIA (monitor only) 002 010 <0.05 <0.0002 <0.001 <0.001 <0.001 0.0017 0.00119 <0.001 <0.001 <0.0002 Donn SWU-217, hest revised 2212012 Pace I cal, 3 Footnotes: Permit # NCS000580 Part Il Paee 7 of 15 4. For each sampled measureable storm event, the total precipitation must be recorded. An on -site rain gauge is required. Where isolated sites are unmanned for extended periods of time, a local rain gauge reading may be substituted for an on -site reading. S. These parameters shall be monitored only if coal or coal ash is transported through the drainage areas of these outfalls during the semi-annual monitoring period in Table 2. Footnotes: Permit # NCS000580 ( Part If Page 9 of 15 ) 1. Hardness- dependent. Benchmark based on translation of dissolved value into total recoverable with an assumed hardness of 25 mg/I and a total suspended solids (TSS) concentration of 10 mg/l. 2. Values above the North Carolina water quality standard for mercury (12 ng/l) should be noted on the DM R but do not trigger Tier responses. Concentrations infield blanks or method blanks associated with the sample may be subtracted from the results for that sample, as long as all documentation of the adjustment is provided with the DMR. 3. if pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6- 9. Does this facility perform Vehicle Maintenance Activities using more than 55 iTallons of new motor oil per month? _ yes _X_no (if yes. complete Part B) Part B: Vehicle iNlaintenance Activity Monitoring Requirements Outfall No. Date Sample Collected _ 50050 00556 00530 00400 Total Flow (iflapplicable) F Total Rainfall Oil &Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids pH New Motor Oil Usage mo/dd/ yr MG inches mgA m /l unit al/mo Form SWU-247, last revised 2/2/2012 Paee 2 ol' 3 Conlnlents: • Outfall 010: Tier One • Outfall I102: Tier Two STORM EVENT CHARACTFRISTICS: Date:12/17/19 Total Event Precipitation (inches):0.25 Event Duration (hours): 8 hours dU minutes (only il' applicable — see permit.) (if more than one storm event NA'as san)ple(l) Date Total Event Precipitation (inches): Event Duration (hours): (only i l' applicable — sec permit.) Nlail Original and one copy to: Division of Water Quality Aim: Central Files 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 "I certify, under penal", of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the hest of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature (Date) Form SWU-247, last revised 212/2012 Page 3of 3