Loading...
HomeMy WebLinkAboutNCG030674_COMPLETE FILE - HISTORICAL_20190110STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V U& b?JI�IO� DOC TYPE O HISTORICAL FILE MONITORING REPORTS 0�0)j YYYYMMDD DOC DATE Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and and esources General Permit No. NCG030000 Date submitted CERTIFICATE OF COVERAPE NO. NCG03 0-r6--7 FACILITY NAME 14tL r10. COUNTY , e PERSON COLLECTING SAMPLES C o e C�� LABORATORY_ fec Er. vnLab Cert. # 6 s/i Comment n sample collection or analysis: � u t\ a k(L b ro rr{ c)- _ Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2 a% 1;--" SAMPLE PERIOD ❑ Jan -June [ziluly-Dec RECP 4\6 1:: e ) or ❑ Monthly' (month] DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA JAN 10 Z019 [_]Zero -flow ❑Water Supply []SA �C�tiler CEENT12AL FIL�:S _.� Lrl'YR ,., -.CTIC'N PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 � ❑ No discharge this period?2 Out -fall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics Benchmarks _ - 100 mg/L or 50 mg10 5.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/1_ 1 mg/L Parameter Code - 46529 C0530 00400. 01119 010511 01094 . _ 00552 ._L._ 78141 5 L 6.g 5 u �. I� u z el ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2.018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 J Facilities that incorporate a solvent management plan into the Stormwater Poliution Prevention Plan may so certify, and the requirement for TTO monitoring d" may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." .20 Name (print n-amo) Sa fe A.'A Title (Print it 117LX ure I to Note: Results must be reported in numerical format. _Do not report Below Detection Limit, BOL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format "<XX m L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Ctutfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches' New Motor Oil or Hydraulic Oil Usage Non -Polar 0&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code - 46529 NC OI L 00552 CO530 Footnotes from Part A also apply to Part B Note. if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS_ SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS_ SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: ^.^.oil an o•icira! copy of DMO intihuding o! TWO Within 3n dL7ys of receipt of the lob results (or at end of monitoring period in the case of "No Discharge" reports) to: ^' Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons direct) Bible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete_ am aware thpjA+f6r-e-AW1ignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." It Date Permit Date: 11/t/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DtR) 1 SPPP Annual Update DATA REVIEW FORM Calendar Year D RECCEIVED Individual NPDES Permit No. NCS❑❑❑❑❑❑ or JAN 10 M9 Certificate of Coverage (COC) No. NCG 9 3❑- ❑O ©0[q1 ;,EN"l RAL Fi! CnS +;y R c'-:CTIC", This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: 1"lAt U 6C County: LP_ (S:: _ Phone Number: t4L) 715- _3 & a Total no, of SDOs monitored Outfall No. Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other [] Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No i=:r `°µ x `,:.� �• s.;._yam: :'ararneter"(units)!` z ..,. C- i }A. -Total�� +e ��.\. -h r �'�A.� �•�•��` 1-'r4�P-'rJ ��?'i `- 'i-ip;. i�lC F.t'"S `•t � 7 '}'_{�,,(-t+�ysr Sf .. ia. { .��R� wY �"24,. �� 't `�� Y � a�.G ti' _� �Rairifa#I,"- �. �• �].�y Ts -r�, R,�`,�� ��` �t,'. :rR ;x`,y`'-�.- , ' �r� -:,�.'" �. •i, ��:•.r iq.�k': .., .'pry ..? _ � � i. }, ," .h - j�.: r '= t Y•.) .e- __- .:)�' �) >. '.. e• 1 .vpLM a"J Y..; " +_ -' y r!�*�� - k -Y"I �4",�i��.^.. � - •-i e1' ��1, F�'�_ �{M-4 r ���- Y " *ems" •R.' '� . ^- _}u. r'�• 'Y: ... . J " ! .• i �._ .{� ._ tv -. 1�Jt•• i' 'JG. 9`Fly'. +�' �3'xi T.., a-;w�iAow-.-�Tf�.1� �•.�. ��r1u r0..i±s cinches s Y �Irlie6 .31. � Benchmark NIA -tD'ate ple�� Vr'Callected �/ rr I x l6 rr �- SWU-264 - Generic Annual DMR Last revised 610112018 Additional Outfall Attachment Outfall No. _ '�2-- Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Rainfall �..L -- inches .hr . Parameter,junit"s) - ear ` �•��� -• +Y- W.wO: '�` '•�.. �;. •+F r..�,,. ,-.:�``.` _ ; Y -.-,• f•2i..'r�.- y ...Y r .,� at' 1 _.,• .i. - p � �'C' -i = ;� ..:• ..r- `' �L'`r _ i�r .. . +kM• - "94: �' .�� '[r ,�_ 4 ; '* '.,.cu.=' .��, �-� wf � - .;: 6.^...i•1�. :•. _. i.. •:'.L. _ Benchmark N/A .1,Dte'Sample •flColldcted, ^ lddlyy SWU-264 - Generic Annual DMR Last revised 6/01/2018 I certify, under penally of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signatu - Date l !771 For questions, contact your local Regional Office: ❑EIVILR Regional Office Contact Information- 225 Green Street 610 East Center Avenue/Suite 301 2090 US Highway 70 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville, NC 28115 (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 (910) 433-3300 3800 Barrett Drive 943 Washington Square Mall 127 Cardinal Drive Extension Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 (910) 796-7215 1617 Mail Service Center 450 Hanes Mill Rd, Suite 300 Winston-Salem, NC 27105 Raleigh, NC 27699-1617 I (336) 776-9800 (919) 807-6300 SWU-264 - Generic Annual DMR Last revised 6/0111018 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) Calendar Year 2018 RECEIVED Individual NPDES Permit No. NCS030676 or C ;ff C CQC N CG❑❑❑❑❑❑ JAPE 0 i 2019 tv icate a overage ( ) o. N CENTRAL FILESIt WSSECTION P TION This monitoring report summary of the calendar year should be kept on file on -site with the foci! y P Facility Name: Greenheck Fan Corporation — Kings Mountain County: Cleveland County Phone Number: ( 704 ) 476-3560 Total no. of SDOs monitored 2 Outfall No. 1 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No X Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No X If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No X Total Rainfall, inches Parameter, (units) Total Suspended Solids Standard pH, units Copper Lead Zinc Benchmark N/A Date Sample Collected, mmlddryy NMI= mmmmm� 3/1/2018 .34 10 mg/L 6.47 su ND 1.4 ug/L 20 ug/L 10/11/2018 1.28 18 mg/L 6.9 su ND 1.6 ug/L ND Additional Outfall Attachment SWU-264 - Generic Annual DMR Outfall No. 2 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No X Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No X If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No X Total Rainfall, inches Parameter, (units) Total Suspended Solids Standard units Copper Lead Zinc Benchmark N/A Date Sample Collected, mm/dd/yy 3/1/2018 .34 20 mg/L 6.53 su ND 1.3 ug/L ND 10/11/2018 1.28 8 mg/L 6.9 su ND ND 10 ug/L "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person SW U-264 - Generic Annual DMR or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature "4 Date 11- ?,fir 0+ 1, For questions, contact your local Regional Office: DWQ Regional Office Contact Information: E VILLE REGIONAL OFFIC 2090 US Highway 70 Swannanoa, NC 28778 (828) 296-4500 RALEIGH REGIONAL OFFICE 3800 Barrett Drive Raleigh, NC 27609 (919)791-4200 INSTON-SALENI REGIONAL OFF 585 Waughtown Street Winston-Salem, NC 27107 (336) 771-5000 FAYETTEVILLE REGIONAL OFFICE 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 (910) 433-3300 ,,WASIIINGTON REGIONAL OFFICE 943 Washington Square Mall Washington, NC 27889 (252) 946-6481 CENTRAL OFFICE 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 807-6300 dOORESVILLE REGIONAL OFFICI 610 East Center Avenue/Suite 301 Mooresville, NC 28115 (704)663-1699 1LMINGTON REGIONAL OFFIC 127 Cardinal Drive Extension Wilmington, NC 28405-2845 (910) 796-7215 "To preserve, prvtecl DUa and enhance North Cam ina's water._." SW t1-264 - Generic Annual DMR SHEALY ENVIRONMENTAL SERVICES, INC. Report of Analysis Greenheck Inc. P.O. Box 410 Schofield, WI 54476--0410 Attention- Doug Borre Project Name: Kings Mountain SW Lot Number:TJ12043 Date Completed:10/23/2018 10/23/2018 3:34 PM Approved and released by: Project Manager: Lucas Odom AAW The electronic signature above is the equivalent of a handwritten signature. This report shall not be reproduced, except in its entirety, without the written approval of Shealy Environmental Services, Inc. Shealy Environmental Services, Inc. 106 Vantage Point Drive West Columbia. SC 29172 (803) 791-9700 Fax (M) 791-9111 www.shealylab.com Page I of 10 SHEALY ENVIRONMENTAL SERVICES, INC. SC DHEC No: 32010001 NELAC No: E87653 NC DENR No: 329 NG Field Parameters No: 5639 Case Narrative Greenheck Inc. Lot Number: TJ12043 This Report of Analysis contains the analytical result(s) for the sample(s) listed on the Sample Summary following this Case Narrative. The sample receiving date is documented in the header information associated with each sample. All results listed in this report relate only to the samples that are contained within this report. Sample receipt, sample analysis, and data review have been performed in accordance with the most current approved NELAC standards, the Shealy Environmental Services, Inc. ("Shealy") Quality Assurance Management Plan (QAMP), standard operating procedures (SOPS), and Shealy policies. Any exceptions to the NELAC standards, the DAMP, SOPS or policies are qualified on the results page or discussed below. If you have any questions regarding this report please contact the Shealy Project Manager listed on the cover page. Shealy Environmental Services, Inc. 106 Vantage Point Onve West Columbia, SC 29172 (803) 791-9700 Fax (803) 791-9111 www.shealylab,com Page 2of10 SHEALY ENVIRONMENTAL SERVICES, INC. Sample Summary Greenheck Inc. Lot Number: TJ12043 Sample Number Sample ID Matrix Date Sampled Date Received 001 001 Aqueous 10111/20181100 10/12/2018 002 002 Aqueous 10111120181115 10/12/2018 (2 samples) Shealy Environmental Services, Inc. 106 Vantage Point Drive West Columbia, SC 29172 (803) 791-9700 Fax (803) 791-9111 www,shealylab.com Page 3 oI' 10 SHEALY ENVIRONMENTAL SERVICES, INC. Detection Summary Greenheck Inc. Lot Number: TJ12O43 Sample Sample ID Matrix Parameter Method Result R Units Page 001 001 Aqueous TSS SM 254013- 18 rng/L 5 001 .001 Aqueous Lead 200.8 1.6 ug1L 5 002 002 Aqueous TSS SM 2540D- 8.0 mglL 6 002 002 Aqueous Zinc 200.8 10 ugfL 6 (4 detect#ons) Shealy Environmental Services, Inc. 106 Vantage Point Drive Weal Columbia, SC 29172 (803} 791-9700 Fax (803) 791-9111 www.shealylab.com Page 4 of 10 Client:Greenheck Inc. Laboratory ID:TJ12043-001 Description: 001 Matrix: Aqueous Date Sampled:10111/2018 1100 )ate Received:10112/2018 Inorganic non-metals Run Prep Method Analytical Method Dilution Analysis Date Analyst Prep Date Batch 1 (pH - Field) SM 4500-H B-2011 1 1 (Temperature ) SM 255OB-2010 1 1 (TSS) SM 254OD-2011 1 10/17/2018 0102 KFE 86696 1 (SGT - HEM (n) 1664B 1 10117/2018 1005 ARP 86728 CAS Analytical Parameter Number Method Result Q Li Units Run pH - Field SM 4500-H B-2 6.9 su 1 Temperature - Field SM 2551 29.0 ° C 1 TSS SM 2541 18 8.3 mglL 1 SGT - HEM (non -polar material) 1664E ND 4.7 mg1L 1 ICP-MS Run Prep Method Analytical Method Dilution Analysis Date Analyst Prep Date Batch 1 200.2 200.8 1 10/2312018 0544 BNW 10/17/2018 1710 86829 CAS Analytical Parameter Number Method Result Q LOO Units Run Copper 7440-50-8 200.8 ND 5.0 ug1L 1 Lead 7439-92-1 200.8 1.6 1.0 uglL 1 Zinc 7440-66-6 200.8 ND 10 ug1L 1 L00 = Limit of Ouantltation B = Detected in the method blank E = Quanhtation of compound exceeded the calibration range NO = Not detected a1 or above the LOO N = Recovery is out of criteria P = The RPD between two GC columns exceeds 40 H = Out of holding time W = Reported on wet weight basis Shealy Environmental Services, Inc. 106 Vantage Point Drive West Columbia, SC 29172 (803) 791-9700 Fax (803) 791-9111 www.shealylab.corn Pugs 5 of 10 Client:Greenheck Inc. Laboratory tD:TJ12043-002 Descriplion: 002 Matrix: Aqueous Date Sampled:1011112018 1115 Date Received:1011212018 Inorganic non-metals Run Prep Method Analytical Method Dilution Analysis Date Analyst Prep Date Batch 1 (pH - Field) SM 4500-H B-201 1 1 1 (Temperature ) SM 255OB-2010 1 1 (TSS) SM 254OD-2011 1 10117/2018 0102 KFE 86696 1 (SGT - HEM (n) 1664B 1 10/17/2018 1005 ARP 86728 CAS Analytical Parameter Number Method Result Q LOQ Units Run pH - Field _ SM 4500-H B-2 6.9 su 1 Temperature - Field SM 25508- 29.0 ° C 1 TSS SM 25400- 8.0 3.6 mg1L 1 SGT - HEM (non -polar material) 1664E NO 5.0 mg1L 1 ICP-MS Run Prep Method Analytical Method Dilution Analysis Date Analyst Prep Date Batch 1 200.2 200.8 1 10/2312018 0602 BNW 10/17/2018 1710 86829 CAS Analytical Parameter Number Method Result Q LOQ Units Run Copper 7440-50-8 200.8 NO 5.0 ug1L 1 Lead 7439-92-1 2008 NO 1-0 ug/L 1 Zinc 7440.66-6 200.8 10 10 ug/L 1 WO - Limit of Quantitation 8 - Detected in the method blank E _ Quantitation of compound exceeded the Calibration range NO v Not detected at or above the LOQ N = Recovery is out of criteria P = The RPD between two GC coltimns exceeds 40% H = Out of nolding time W - Reported on wet weight basis Shealy Environmental Services. Inc. 106 Vantage Point Drive West Columbia, SC 29172 (803) 791.9700 Fax (803) 791-9111 www.shealylab,com Page 6 oft0 Chain of Custody and Miscellaneous Documents Shealy Environmental Services, Inc. 106 Vantage Point Drive West Columbia. SC 29172 (803) 791-9700 Fax (803) 701-9111 www,shealylab.com Page 7 of 10 GC 44�LChain of Custody Record Shealy Environmental` Services, Inc. 106 Vantage Point Drive West Colwroia, South Carding 29172 Telephone No. (8©3) 781-9700 Fax Ida. (8G3) 791-8111 v,ww,shealylab.00rn Number Client Greenhedt Report 10 Contact Doug 9orre Senarpltr (Printed ttsme) '; 1 NS,s.F,-. I- QL%Ye No. lg?54 flot3rC3e3 TedrphDne END. f F1ar No. I [mill Waybill No. P;tpv Doug. Hun greerha*.com 1 nl t Cry 89te ZIP Code Preserv2live 1 I NR NA NA 1 NurntwafCm4oinum Shofield 141 1. Lj.vc . 4. HNO3 T. NaC»9 2. Nawzm 5. HCt 3. H2SO4 B. No TWo. _ tR, J ❑ aatuo prejest 14111171111 n S 4 pp !ii TJ12I143 uo r4 �? _+ a E A Proied Humtar P.o r:wlit)Cr 5� Matrix Sample It)! D--crlptlon (Ccnlainers tar escl E 3ntple may be CCvnhined m cne one Data Tirnw, bN' DVV ti4SS 5 001 ♦ t f L+ (, p! Ca X� 1,4 i X X X X X x X XX x X C a �.ti i• 2-5 002 , G X Fy r� r� U-nr. d R7wrej (Prig �n av wal rrwtrrred rrs expedited TAI) P"—", RuO Pbase ee ( 5; tYi Sample Gi&poaal Return la Client LUlnpCr al by Lob ❑ ! '' QIC 11epuimmenls (Please W-lify) pC " Hazard l ryukatl6n ❑ -HazaN ❑Flsmrrat �5kin Initent polfon nlJnknorm 1, Raiinqul b + Ganvikr Cate rr Tune ff 1. Rvuw d by Gate .'Ime 2. Rulin*i red ' Daly Thee 2. Received ey L'OIN Tlrre 3 Rr hTbVkUhefl by Elate Tme 1. Recrivcd Cy Oale Tine 4. Re31rqui"J ty Date Virile 4. Lehcrstory i2CxivCd bV Cr4 !p /� Tme 17l >SiCiw, All samples are retained for six weeks from rareipt unir:ss other arrangements are made LR': USE 3my raetelvstl cn ka ;Cieck) N Iw Fuck RaciEip: Iemp, % . o C 102 To np. Blank r N Crtedive Lisle o8-'l%.mil z T I� SHEALY ENVIRONMENTAL SERVICES INC. 4euly i±.r.�•mnw,lq Rtr..,r:. 1 .. h4 I K I 0.v,ncy Na,i.r �SIL'.t]pP �.� fffevli.. u.• VL±uit I FWld Analysis Record - (Vorrh Carolina Colnpliau Ic � I Gl;e+l:P-!— Y rY1-;l �N Date: Itll hg clf t�lM1H" li.2nlU; Temper:tlwr by tih1 2�r0 R-lallf � l'hed krre if Fei 11uk1 uvl nitldiry hfr; 6irkr ID Sant Inhhntlttrd ID p Nnulitlal Sta�dRPo f;tsaa. h111 Anal�K 7'tme Meaxared Tcugn. (qQ 1letrr Itei,6e,e {tiV) ; 54endtnt CDAL al Meuauml Trap.- ISU) i}C' PUS! ai!', (prri t.u.r,eata NA Itr. " I NA NA NA NA NA NA I Nn NA yy f,r NA N•4 NA rl NA I NA NA M NA MA NA I NA NA NA { NA NA Rtu-A�ah•�isC'hrl• 5Limi�rd: ��- �Z� ?.'1 � I}7 �„ �-� 'Ira'Jfalii it ij'= i iekm,C1 �..,t. �I:IN`ll RA' yvlai.:TII.iLn• Ot bp�l$Ylili srllfA_-:.AVM n•hYs Slti. a.M roril LM�::wfut.. lllp4.tnm Ruul�NEn3t:�I pq'•al�'.r•.!•it.0-61x-firs V.Ilhr.Slll �'i Yst.,gli: r, lk.„�sU'M I[rfQntllc ' Total kcsid"l Ubluiri.e K$Ikf4%qC1Ca•:A1d f Check heal If avttivlt n.l mptdlrvhle, Mew ID 5wnpler',Gtnnd#1'd IU Tssi�ttd $1:tpdard I C:nnr. (yl#1L} An#Tytb Tine Uuttar lU ItYU 111 ;NeirrAelldtn� i j2iy'LI I 1 p#aylrldl Ip' F) fonrtc#ts I -Aiwlv.n Chmk 51,andlud: NA NA N;, I N4 NA NA A NA NA NA NA ; NA N4 NA NA I NA NA HA Pi:7t,AnalySisChw:,;=IANRi NA NA 1w,3..A—+drmia 6-4,jil',r,V:115':nt#lily l: mhllin l,r:.}{rr AnI1rlf,t :1.Wne'awInr Iotub IMti—mmr�dno0ia. •n.,4 . url rw �J•a ir! I.x.1iNi Iw,i ,d1 �.ti 1.1'j pros of Icyri .tnai� •rw•trlfTMlr. i DISaolred ffeyZra 47 SM 41lt0U (;-Ze1 Clrclr here if nrsSna nut d7rpisrm j hTrttr IiY tiumpV:.tiltandard I) .1nnhos 7'i.le I 'Lfealurcd Tel.p. j"f 1 'flizerveirisl DO 11 hfn rmred Temp. tngllk,j I Mclet v4zdiorl � � (mpriLl 4C f at4Falla IF;Fy Camnrnt>< A } NA NA i NR NA NA NA NA Plr:t-Anuk,9u Cal ltit3tioti 4 arf. I Hit,' Sat. Air): l II tiPVl^-.Y•k ll � iNFnRfd w111u r.,xm..l'HM1-. SLSYyk .1,l�:Iln :rIS aim �I,rlf.�r'rh Qfrgl:4 .r,•1•,ie tin. I -Il.fw u, 00tru-,t.+r,s Tn4uwr•;Ilucur[u HuvSu Munn. nl, 'IYtI-+niyiis tH.taar.,. .r.fe qar. inu: P161 .n1Ars it:..,rL rriL ILe...ani tM Shealy Environmental Services, tnc. 106 Vantage Point Drive West Columbia, SC 29172 (803) 791-9700 Fax (803) 791-9111 www.shealylab.Com Pugr 9 0l 10 SHEALY ENVIRONMENTAL SERVICES, INC. hrnly Envlramrmtal Seraicc:, Jrc. PW 1 of L Uk me,.l 1,'uaitwr. MEOW SC.14 Eneckivr -A)wc .&2 291a Sample Receipt Checklist (SRC) i Cli�rtr 1 S�'1_ii°[�i`l�£"C� CQuI� lrvtiPcxncd bvldatt:: ��! (�� ^ �.�- t rS Eft IcAns of receipt: SES1 LJ Clicru U UPS IrrdK-X Gl Other; t — 0 yCS1 0 Nn • 1_ Wera custody sali pru; vnt on the crwler? L !-"I Vesl No ZNA12. If custod X seals were prescra,were they int:n[t rued unbrukesl? PH Strip lit: ChImine Strip 0- Tested by - Original temperanrre upon receipt! J)csivcd (Corrected) te:rnPerttture upon rtxcipt %n nlid Snap -Cup ID: Z-C . aC. " . -C . ; '-4 - Method: ZTempe iiwrt Blank- OAgainst Bottles IR prat ID: t,2 IR Gun Correction Facttw: hiLthod ofcoolanc !2f Wct Icc ❑ ice Packs ❑ DFJ Ice ❑ None Yes ❑ No + ;`fA 3. Il temperWarc of any cwler exceeded 6.01C, wus Projcct Manager Notified? Phi was , luiificd by, phone ! email ! faae-to-facc (cirl:le ane j. (_� Y� [j No Nr1 4_ is die cornmcrciaJ courier's packing Slip aam-hcd 10 this form? Yes ❑ No 5_ '<'v"em proper custody preceduras (±l uishcdlreccived) fol[awed? Yes 0 No 6. Were sample IDs listed. on tlw COO Yes Q No 7. Werc surnplc ID-; listed nn all sample eatiWine,7 .yC5 ❑ No 8. yt'as collection date & time listed on the COC? i Yea No 9. Was co@ecticn date & time listed on all sattt le cootuincts7 Yes D N 10. Did all container label tnfortmition (ID. date, time) "a vvitli tht; Cl7i'_'f Ye 5 [] No 11 _ Were trsla to hr p1 rtormed listed on (lts COCI ' 5"cs 12. Did all samples arrive in the proper containers for each wNLI und/nr in good condition l mbrokeet, lids nn, eir.. j? Nn 1.3. Was adequate sturJple volume available`; U No I4. Were all samp)cs receivaii within,4 the holdinZ time or 48 hours, whichever comas firm? rtyycs No 'IS."%--reany sumptcs rotttainensmissing/LKcess (circle one) saLn le:s Not Barad❑nCOC?16. ❑ No NA For VOA anti RSK-175 samples, wtsre bubbles present>"a-Fim" (W'or 6mm in diumerer) u1 any ofthe VOA viols" Yes ' I No U NAI 17, V11cre all DRO.en talslntttrient sampics received at a PN of < 2. ❑ Yes 0 No 0 NA I I S. Were all cyanide sarnplaq rcacivod at a pK = 12 and sulhde crimples received ut a pH .- 91 ❑ Yes ❑ No ONA 19. Were all WI.icable NRy !cy'atridr-VhennV(2S (= 0.5rng! sm. pie; free of rostdual chkirinG? Lj Yes Lj Nu O1tiA 20. iWer- client reinarkslreyuc=(Le. requested dihrtiom, 1~IS{MSD designatinri% etc..,) correedv imnscribed from the COC alto the comment section in I11175? t Yes t No 21. Was die uolc nurnher listed oC 0to cuntalttcr level? If . Qk3ote Y nmplc Prvscrvadon (Mist be completed fur uqy samples) incorrectly preserved rx' with headspace.) -amplets) .-, _were received incorrectly prc"T ed and were adjusted ar, xtlin°ly in sumplc receiving with mL of circle onc: H2SO4, HN01, HCl, NaOH using SR 0 uric of pnacrvation If n1um than one pne-,mmtive is needed, phase note inithe colmnenls belt,v,, amplg3). wane received W ht bobbles - 6 mrrt in diameter. Sara ples(s) _. were received with TRC > 0,5 rit, L (lf u 19 is aa) aM were dju5tcd uecordin ly in sunple receiving with soditun thirvsalfate (Na,5,01) with Sheay lD: I 5K baectade IdbCb applied by: 17ate: U - — Shealy Environmental Services, Inc. 106 Vantage Point Drive West Columbia, SC 29172 (803) 791-9700 Fax (803) 791-9111 www.shealylab.com Page 10 of 10 Semi-annual Stormwater Discharge Monitoring Rego for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted %I2. G / 1 9 —r— -7-_ CERTIFICATE OF COVERAGE NO. NCG03 © 6 ` H FACILITY NAME . K0,1k n U A 1}IJn C_L COUNTY Lee y PERSON COLLECTING SAMPLES t-0 `] L'Tf_ C LABORATORY Car-P-fol\ tZ0- r`l Lab Cert. fi ( �_ Comments on sample collection or analysis: Part A; Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR V 1 ; SAMPLE PERIOD [/Jan -June ❑ July -Dec or ❑ Monthly' (month) RECEIVED RtSCHiRGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA JUL 3 0 2018 QOther CENTR4L FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -a DWR SECTION No discharge this period?' Outfall No. Date Sample Collected' jmo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons . Total Toxic Organics Benchmarks =__> - 100 mg/L or 50 mg/L° 6.0 -- 9.0 0.007 mg/L 0.033 mg/L . 0.067 mg/L 15 mg/La' ;,.1 mg/L o 33 $ d, o 1 p, 14 c'�, -7 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfail. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469,31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) -712 1 Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L' where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. if you report a somple value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall , amount, Inches; Non -polar O&G/TPH by EPA 166415GT-HEM) Total Suspended Solids pH Benchmarks 15 rng/L 100 mg/L or 50 mg/L• 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B ' See General Permit -text, Table-5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/112012-10/31/201) SWU-245, iaSL leviSe6 iu/25%23i2 Page 2 of 3 ` V`114 ENCO Laboratories Acaffate. Timely. Responsive. Innovative. 102-A Woodwinds Industrial Court Cary NC, 27511 Phone: 919.467.3090 FAX: 919.467.3515 Thursday, May 10, 2018 Cameron Testing Services, Inc. (CA039) Attn: Maryanne Sims 219 South Steele Street Sanford, NC 27330 RE: Laboratory Results for Project Number: 180696/ Stormwater, Project Name/Desc: Misc Waste Water ENCO Workorder(s): CB06222 Dear Maryanne Sims, Enclosed is a copy of your laboratory report for test samples received by our laboratory on Friday, April 27, 2018. Unless otherwise noted in an attached project narrative, all samples were received in acceptable condition and processed in accordance with the referenced methods/procedures. Results for these procedures apply only to the samples as submitted. The analytical results contained in this report are in compliance with NELAC standards, except as noted in the project narrative if applicable. This report shall not be reproduced except in full, without the written approval of the Laboratory. This report contains only those analyses performed by Environmental Conservation Laboratories. Unless otherwise noted, all analyses were performed at ENCO Cary. Data from outside organizations will be reported under separate cover. If you have any questions or require further information, please do not hesitate to contact me. Sincerely, Stephanie Franz Project Manager Enclosure(s) FINAL This report relates of to the sample as received by the laboratory, and may only be reproduced in full. Page 1 of 8 www.encolabs.com SAMPLE SUMMARY/ LABORATORY CHRONICLE Client ID: Outfall #1 Lab ID: C806222-01 Sampled: 04/24/18 11:30 Received: 04/27/13 12:40 Parameter Prer 2aration Hold Dateffime(s) Prep DatelTime(s) Analysis Date/Time(s) EPA 6010D EPA 3005A 10/21/18 05/08/18 12:08 05/10/18 1104 FINAL This report relates only to the sample as received by the laboratory, and may only be reproduced in full. I Page 2 of S www.encolabs.com SAMPLE DETECTION SUMMARY Client ID: Outfall 1t1 Lab ID: C906222-01 Anajyje FLesults Elan nu L" Urdu Method Notes Copper• Total 33.8 1.60 10.0 ug/L EPA 6010D QB-01 Lead - Total 14.0 3.10 10.0 ug/L EPA 6010D Zinc - Total 112 4.40 10.0 ug/L EPA 6010D FINAL This report relates only to the sample as received by the laboratory, and may Dnly be reproduced in full. I Page 3 Of S www.encolabs.com ANALYTICAL RESULTS Description: Outfall #1 Lab Sample ID:CB06222-01 Received: 04/27/18 12:40 Matrix: Waste Water Sampled:04/24/18 11:30 Work Order: CB06222 Project: Misc Waste Water Sampled By: CLIENT (Metals (total recoverable) by EPA 6000/7000 Series Methods ^ - EAICO Cary cemtw amlyte INC 591] Analyte [CAS Numbed Result aag Unju DF MdL PQL Batch Method Analyzed By Notes Copper [7440-50-8]^ 33.8 uglL 1 1.60 10.0 8EO8023 EPA 6010D 05/10/18 13:04 ]DH QB-01 Lead [7439-92-1]^ 19.0 ug/L 1 3.10 10.0 8E08023 EPA 6010D 05/10/18 13704 ]DH Zinc[7440-66-6]^ 142 ug/L 1 4.40 10.0 BE08023 EPA 6010D 05/10/18 13:04 ]DH FINAL This report relates on}y to the sample as received by the laboratory, and may only be reproduced in full. I Page 4 www.encolabs.com QUALITY CONTROL DATA Metals (total recoverable) by EPA 6000/7000 Series Methods - Quality Control Batch 8F08013 - EPA 3005A Blank (SE08023-BLK1) Prepared: 05/0812018 12:08 Analyzed: 05/10/2018 11:15 Spike Source °/nREC RPD .Analyte Result Rau P-OL Units Level Result %REC Limits RPD Limit Notes Copper 2.46 1 10.0 ug/L Lead 3.10 U 10.0 ug/L 2imc 4.40 U 10.0 ug/L LCS (8E08023-BS1) Prepared: 05/08/2018 12:08 Analyzed: 05/10/2018 11:21 Spike Source %REC RPD .Analyte Result E7aa P-OL Units Level Result %REC Limits RPD Limit Notes Copper 204 10.0 ug/L 200 102 RD-120 Lead 206 10.0 ug/L 200 103 80-120 Zinc 210 10.0 ug/L 200 105 80-120 Matrix Spike (8EO8023-MS1) Prepared: 05/08/2018 12:08 Analyzed: 05/10/2018 11:24 Source: CB06209-01 Spike Source %REC RPD _Analyte Result Flan POL Units Level Result GAREC Limits RPD Limit Notes Copper 206 10.0 ug/L 200 2.31 102 75-125 Lead 210 10.0 ug/L 200 3.10 U 105 75-125 Zinc 206 10.0 ug/L 200 4.40 U 103 75-125 Matrix Spike Dup (8E08023-MSD1) Prepared: 05/08/2018 12:08 Analyzed: 05/10/2018 11:34 Source:CB06209-01 Spike Source %REC RPD Analv.te Result Flag ROL Units Level 13C5![lt %REC Lim RPD Limit des Copper 206 10.0 ug/L 200 2.31 102 75-125 0.4 20 Lead 209 10.0 ug/L 200 3.10 U 104 75-125 0.8 20 Zinc 213 10.0 ug/L 200 4.40 U 106 75-125 3 20 Post Spike (8E08023-PS1) Prepared: 05/08/2018 12:08 Analyzed: OS/10/2018 11:36 Source: CB06209-01 Spike Source %REC RPD .Analyle Result Flag ROL Units Level Result %REC Limi RPD Limit Notes Copper 0,201 0.0100 mg/L 0.200 0,00231 99 80.120 Lead 0.207 0,0100 mg/L 0.200 -0,00222 103 80-170 Zinc 0.211 0.0100 mg/L 0.200 0.00104 105 60-120 FINAL This report relates only to the sample aS received by the laboratory, and may only be reproduced in full. I Page 5 pf S Q E- 0. www.encolabs.com FLAGS/NOTES AND DEFINITIONS B The analyte was detected in the associated method blank. D The sample was analyzed at dilution. 7 The reported value is between the laboratory method detection limit (MDQ and the laboratory method reporting limit (MRL), adjusted for actual sample preparation data and moisture content, where applicable. U The analyte was analyzed for but not detected to the level shown, adjusted for actual sample preparation data and moisture content, where applicable. E The concentration indicated for this analyte is an estimated value above the calibration range of the instrument. This value is considered an estimate. MRL Method Reporting Limit. The MRL is roughly equivalent to the practical quantitation limit (PQL) and is based on the low point of the calibration curve, when applicable, sample preparation factor, dilution factor, and, in the case of soil samples, moisture content. PQL PQL: Practical Quantitation Limit. N The analysis indicates the presence of an analyte for which there is presumptive evidence (85% or greater confidence) to make a "tentative identification". P Greater than 25% concentration difference was observed between the primary and secondary GC column. The lower concentration is reported. QB-01 The method blank had a positive result for the analyte; however, the concentration in the method blank is less than 10% of the sample result. There is minimal impact to the data. FINAL This report relates only to the sample as received by the laboratory, and may only be reproduced in hill. I Page 6 Of S , 0775 Ceroal Port Dr- - - - • -- _ ..' —<E k0 E xecut" Par- Court. Suits 111 102-A MOU-xm ln.`uWaf Court Orlando. FL 32824 ,k-rrksa e, FL 32215-6069 Cary, NC 27511 Q9NG:tt:—aj(407) 8265314 Fax (407) 850-6945 {9U) 295-3007 Fax (904) 225-6210 (919) 467-400 Far (919) 467—!1515 Page of :Xent Nate Cameron Testing Services Pro)ed Number 180696 Requested Andyses I Requested Tvmaround Times Note: Rush requests srttred to acceptance try deetacky Standard Expedited Due _I I c N " Address 219 S. Steele Street "ect wwneoesc Stormwater UIyrSTTLrp Sanford, NC 27330 PO rt ! 8," Info Tel Fax RoportingContaU tef f Samp4) Name, Atfiliation (Print) 3" Comact samger(s) Signature FwAty 1t (d required) Lab Workorder Preservation (Sce s) JUDMUne as rledessary) Flrxn# Sample10(Fieldlderrtdir�Einn) CoBectunDate �Ti C,crnpIGrab atrn see rades) ToLa) it or CAMU'rers SampleCommenls Outfall #1 04124/1 B 1130 Grab SW 1 X e- Total # of Containers rs� 3ampte Nd Prepared By Datanww Datenime Received -'Time Corry b Datdii y fiat me Dam`rime Received By DaWTrme Cover ps Z. rerr:ps a!t ReMpt and11 ReCeV _p ACCeptable Unacceptable Matrix GIN-Groundwatef SO -Sod SESedrmem SWSurfate Water WW-VYastewa:er A -Air O-Mer )detml In commems) preurvation: Hce H-HCI NJ*403 S-H25C4 N"apH o-Other (detail in cgrnments) Note All samplei subm.tted to ENCO Labs ere in amui dwice *rth pea fermi and conditions haled on the teveme of Uws ferret, t/lless pimoc wririen agreements exist Co I.- 0 r` W CD m CL Li Sample Preservation Verification ENCO Cary Work Order: C606222 Project: Misc Waste Water Client: Cameron Testing Services, Inc. (CA039) Project #: 180696/ Stormwater Logged In; 27-Apr-18 1101 Logged By: John C King Preservation Check Performed By: C)"5 — Date/Time: C-1:2 low, /-&JCS CB06222.01 Conga;T� �22 RI? P (.Q H10h6cke'dM gnC &o d1tP 1"" 41 w g VA6 gage ed/,omm t A 1LP+HNO3 <2 Y I N / NA I Y I 1 NA Reaqent Name ID 1 2 pHStrip ID: Reagent Name ID 3 4 Reagent Name ID 5 6 C:\ELMN'nPrint\wko—PreservationCheck.rpt I Page 8 of ;rajge 1 ( Cameron Testing Services, Inc. Laboratory Report NC DENR OSS4 NC PHHS #37799 ry � r�Cntr'` US EPA#NC01918 Hallman Foundry C 180696 Poject: April 2018 Stormwater Regulatory Yes Sample Information ySampled� a C, Heckle i3a Q 04124/1 S Recel ed J. Zubeck bale. 04124I18 = .. Analyses and Results 180696 01 Outfall #1 WW Gr pH 6.40 S. U. 0 04/26/18 4500 H B;- pH M Gr TSS 53.0 mo�. so 04/26/18 2540 D - TSS M Gr O&G-W 7.22 n*q- 6 05t03/18 EPA 1664A ww Gr Metals Attached Metals (Cu, Pb, Zn) analyzed by ENCO, Cary, NC; report attached. Report Review Project Manager 219 S. Steele Str. Sanford NC 27330 Date -- 919-721-4067 919-208-4240 clerk Camer0ntesting.crnn 219S. Steele Sir. Cameron Testing Services, Inc. Chain of Custody Sanford, NC 27330 Phone: 919-208-4240 NC VtisrdlGlJCert. 654 NC PHHS Cent k 37799 US EPA NG0191$ Page r Of I_ ECOrrt �r° ' WSACity HaiIman Foundry - — -- Cod Heckle Eme#I: s' ? °,.� -= Sample Tem R: X , oucTS;iiab,use only, a- Val i Amve: j StateyZ�p1 .�y7p.,• ',r f�iotes' - -- — - s �` 'ti" '"+"�`.•jlJiie't _ �ReguI tnry —��RusEt °je 5tormwater # 'ir�} �ollected Name: A 9 e Signature: Y`.•,yeri �'ir'Lc'�c -• . �Z4i.�sii':•e-�i��S}yr"a•�.�iisa � plInformation;':`F�hlumberof�`bo#tlesReque9tedrAna[ysl5�=- c,.. ' ��i "�'�' meµ'—'-��'„�,p�'�`""`��-�y„�p.—rt. .,,y �h� `+��'..'�yJy�w u'�' :_. f�"� -•�' ?CTSM'Rb x ar ua i Q �[[ ! — o� rn +� k pre"servatives it fs reserved H C ! � z�. �� p��" ,_ { } r v Sample ID m I 1= I E if U o c9 a ; : m H2(S)04!�H(N)03 (Na)T uliaie' Na(D)F!� �D , I � o r a i •� e u�Qthe�(X)�inilcat'`,'i � W # -.s. i'i`..�� `L�»,:vi�c.h � ..��h.��. C s r _ t1h r��1i��•. pH, TSS, OG, Cu, Pb, Zn 1 3 1 I i I ! L .--- { t I l I 1 l Refill uisliecE' t a-r�Received•.-.-���� W.= Coil/z5/Ig IbtS ----------.. _... .�.—_----------- — ---- --•--- _ _ _ �� Rush work will require prior approval Additional charges will apply Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality eneral Permit No. NCG030000 Date submitted 1 R, I I 1 7 CERTIFICATE OF COVERAPE NO. NCG03 D 6 7 Lt FACILITY NAMEQ� COUNTY Lee - PERSON COLLECTING SAMPLES COAtsG � LABORATORYC-dMP-r o A Te 51 (%- Lab Cert. Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results RECEIVED DEC 21 2017 1 'SI�NR-L4ND QUALITY SAMPLE COLLECTION YEAR �ST�►iDD _M4WATERpERM)nIN SAMPLE PERIOD ❑ Jan -June [�Gly-Dec G � - i f 1� !'1 or ❑ Monthly (month] REC 6DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA '� Z��1 ❑Zero -flow [:]water Supply []SA,.1 [a6ther i-l"TRAL r PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 Er -No discharge this period?2 Outfall No. Gate Sample Collected) (mo/dd/yr) 24-haur rainfall amount, Inche$3 Total Suspended Solids pH, Standard units Copper - Lead Zinc Non -Polar O&GJ Total Petroleum Hydrocarbons . Tote! Toxic Organics' Benchmarks .1 L ar 50 mg/O 6.0 - 9.0 0.007 mg/L 0,033, _ 0.067 mg/L 15 mg/L 1 mg/L ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement_ See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22, and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU•245,last revised 10J25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the'fTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." C od Name (Print na e) Title (Print ) } l? (Sign a (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, SDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Y Note., If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses_ See General Permit text. Part B: Vehicle Maintenance Area. Monitoring Results: only for facilities averaging > 55 gal of new oil per month. �Ilo discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall . amount, Inches Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 Su Footnotes from Part A also apply to this Part S ' See General Permit text, Table S, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/201? jWU-�45, i3yt ievneu i6i�5/2312 Page 2 of 3 Note: ff you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AND PARTS MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B_ • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALLTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case o "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person.or persons who manage the system, or q , (hose persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, inciuding the possibility of fines and imprisonment for knowing violations." 1/1-7 (Si ure of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina -Division of Water Quality i3enetal Permit -No. NCG030000 Date submitted 0)7 CERTIFICATE OF COVERAGE NO. rNCG03 06 7 SAMPLE COLLECTION YEAR d FACILITY NAME HOL11rnctn FOundr�l _ I 11,ISAMPLEPERIOD Jan -June ❑July -Dec COUNTY L2 R LC E I V F�,{ARGING T � Ss Mont❑dRW []HC W ❑Trout thLPNA PERSON COLLECTING SAMPLES � � ❑Zero -flow ❑Water Supply []SA er n -V Sin Lab Cert.9 G .��{ MAY 2 4 2017 ®Other Comments on sample collection or an lysis: CENTRAL FILES -' DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results ❑ No discharge this period?z Outfall No. Date Sample Collected' '(mo/dd/yr) 24-hour rainfall amount, Inches; Total Suspended Solids pH, Standard units Copper lead Zinc Non -Polar 0&6/ Tots! Petroleum Hydrocarbons . Total Toxic Organicss Benchmarks -_ - 100 mg/L or 50 mg/L` 6.0 — 9.0 0.007 mg/L t.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L • 3 r 6.'70 0.0350n p.0,31 in 0,115 M C .04M �- 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the.rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications wherethe more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which -perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition, as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31)_ Permit Date: 11/l/2012-10/31/2017 SWLI-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. for those facilities electing -to employ the TTO monitoring waiver, the discharger -shall signthefollowing certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics MO), i certify that to the best of my knowledge and belief, no dumping of concentrated toxic organic into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. l further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." C 6 � A Name (Prin name) Title (Print titl 'MA 7 nat Date Note: Results must be reported in numerical format. Do not report_ Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When -results are below the applicable limits, they must be reported in the format, "<XX m L", where XX is the numerical value of the detection limit, reporting.limit, etc. in mg/L. Note: If you report o somple value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit. text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?Z t7utfaii No, Date Sample Collected' (mo/dd/yr) 24-hour rainfall , amount, inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks ==> 15 mg/L 100 mg/L or SO. mg/L' 6.0 — 9.0 SU Footnotes -from : Part AAlso apply.to.this;Part 8'..,_ • See General Permit text, Table 5, identifying the especially sensitive receiving water Classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SVvu-245, iast revised iu/25r2312 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. FOR-PARTA-AND'PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an.original and one copy of this DMR including all "No Discharge" re arts within 30 days of receipt of the lab results or at end of monitoring eriod in the case of "No Discharge" reports) to: Division of Water Quality Attn: DW Q Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assu-re that qualified personnel. properly gather and evaluate the information submitted. Based on.my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is,.to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Sign Permit Date: 11/1/2012-10/31/2017 ,5/ (1t 7 (Date) SWU-245, last revised 10/25/2012 Page 3of3 5em..1-annual Stormwatter Discharge Monitoring Report for North Carolina Division of Water Qu lity Genera! Permit No. MCGO30000 Date submitted i 6 CERTIFICATE OF COIVFRA NO. NCG03 0 6 7`7 FACILITY NAME (`r K ll(Ma tl �Cly_ /Id r�l _ COUNTY L- -_ e, PERSON COLLECTING SAMPLES C LABORATORY 1 /1 4 ^ Lab Cert. # _._6 5 Comments on sample collection or ana ysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR. SAMPLE PERIOD O Jan -June KC July -Dec or O Monthly' (month) QISCHARGFNG TO CLASS ❑ORW OHQW OTrout OPNA RECEIVEu Zero-flow�OWater Supply []SA NOV 14 2016 Rother CENTRAL FILE PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics s Benchmarks ==s _ 100 mg/L or 50 mg/0 6.0 — 9.0 " 0-007 rng/L 0.033.mg/L - 0.067, mg/L . 15 mg/L 1 mg/L i s �rr a e 0.038ng 0-10 mq < .0d (1 l 5 3 6 -0 100 Ay 0.06'5, 0-/6S Ai 6.70M f ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark Mere. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing Operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22: and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/112012-10/31/2017 J-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO moni,oring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTD), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." C,C)�d.,-, 4 tC14f 1 Name (Print nam ) Title (Pr' le) 5i re} ( ate} Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier.1, Tier2, orTier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?z Outfall No. Date Sample Collected (mo/dd/yr) 24=hour rainfall amount, lnches3 Nan -polar O&G/TPH by . EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9-0 5U Footnotes from Part A also apply to this Part B . See General Permit text. Table 5, identifying the especially sensitive receiving water clan ificarinns where the more protective benchmark applies. Permit Date: 1I/1/2012-10/31/2ti1/ Swu-145, Last revG,26 LOIC5I1ilti Page 2 of 3 Nate: ff you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 £XCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALLTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B, • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES I=OR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO Pf IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES M NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this OMR, includinq all "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitorinq period in the Lose of "No Discharge" reportsf ta: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and beliet, true, accurate, and complete. I am aware thatsherE significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 0 Cameron Testing Services, Inc. Laboratory Report NCDEN R0654 NC PHHS #37799 r; US EPANNCO1918 <Cltent Hallmon Foundry xCfSn rogi 161359 ' r Project �P�n"'s�i�Jv :•' Stormwater #2 - 2016 Re i i I a i 6 r Yes � Sample Information Sampled C. Cameron a ,Date . 09/02/16 Received; A. Simmonds pater 09102/16 Analyses and Results 161359 01 Outlet #1 vvw Gr TSS 262 mgi. 25 09/06/16 2540 D - TSS O&G-W <5.00 mtyl 5 09/08116 EPA 1664A pH 6.0 S. U. 0 091021t6 4500 H 8 - pH Metals Report Review 02 Outlet #2 wW Gr TSS 346 mr/t. 37.3 09/06/16 O&G-W 6,70 mqt 6 09/08/16 pH 6.0 S. u, 0 09/02/16 Metals Metals (Cu, Pb, Zn) analyzed by First Analytical Labs, Durham, NC-. report attached. RECEIVED NOV 14 2016 CENTRAL FILES DWR SECTION Lab Director Date 2540 D - TSS EPA1664A 4500 H 4 - pH 219 S. Steele Sir. 919-2084240 Sariford NC 27330 chris®camewntesting.eom FIRST ANALYTICAL LABORATORIES f, 17-11 i-& flhl - PC ,,- 110372 - Pn etedrtF -m�gv 't Purl. Ni .17105 rT7 Lilt 472,3:nJ-iwy Lime. Sw.ia 6- Du,,3m Nt: ?-71 1 AJI FAL Project # Client Client Project ID Sample Name: Analyte Copper (Cu) Lead (Pb) Zinc (Zn) EPA Method 200 Analysis Report 1609027.2 Cameron Testing Services 161359 161359-02 - Outfall N2 Report Date: 9/16/2016 Date Received: 9/7/2016 Concentration in Original Sarnple Cone. RL (mg/L) (rng/L) 0,063 0.001. 0.063 0.001 0-185 0.005 Approved by: Matt Loftis, Laboratory Manager Ni�,;, FIRST ANALYTICAL LA.80JX*'AGI' T%'JES IT, Cll FG i3cm 11,3�72 - Rese a Fci, ',*r,ar%gij Pirk, 11-: 2770S 4620 industry 4ane. Susie (jut -.*m. N,. 27113 Ir WE.—Alt—WWA BMW FAL Project # Client Client Project ID Sample Name: Analyte Copper (Cu) Lead (Pb) Zinc (Zn) EPA Method 200 Analysis Report 1609027.1 Cameron Testing Services 161359 161359-01 - Outfali 41 Report Date: 9/16/2016 Date Received: 9/7/2016 Concentration in Original Sample Conc. RL (rng/L) (mg/L) 0,038 0,001 0Y039 0001. 0.186 0.005 Approved by: Matt Loftis, Laboratory Manager 219 S. Steeie Str, Sanford, NC 27330 Phnnw All- en-Aaen Cameron Testing Services, Inc. NC VWYIGW Cert_ #654 NC PHHS Cert # 37799 US EPA NCO1918 Chain of Custody Page of 61parnr : +'t �, r Emutr , CT3�la6 ti at=rt tSemplecTe[np Mallm'i ,�,,-� „ �%�ro , LI :Naies: .tc;U;. r=��+�+i: ���Regtrlatory� �.�. i- a !tJ t�.� --uColl :,rl Name: t Signature: r — : �„,._: s. -fit., _ t ' v:4 _ :Sam 1e Infot•mailon F �t.- .1+ rfc. � 7!''r� +Number of bottles „4, _t• .::i, `-rtysy,S',r�d.�„'�rlu,_„uy� '.K, i� _ �[tested no r..y .:.-�:�� �-. r V , �.�.,_.�,�,��,r;��:+•r a.��>,... :•• _.::, .._...,P , ::�;...::�.1,: ,_.:.. �.... P�4 ..3 - �:.., _ bt�tiA..r��i�r- Fu „R` ,e rtY..,,��. •:;a.. � �b�� i {� i x z `° Preservatives (tl)npr :-. , . HiCll; ' " ACTS l.ab a Sample ID ua to �� M E o LEro } �, o C7 a N o eserved H2(S)04; H(N)d3 (Na)Thiosulfate ;Na(4)H,` ; = m o Other -(X). IndipatE tlD o - J 1 i i r i 1 Reline uish k: - eiveii: =a = DatefTlme Rush work will require prior approval. Additional charges will apply tormwaae.r Dischairge OU,tfaIl (SDO) Qliialitative Moiritoring Report Forlguidonce on filling out this form, please visit ://oor.isil.ncdenr.or2/web/wglwslCk(npde,5sw,4tab-4 Permit No.: N/C/6/ bo / 2/ 9/ TY or Certificate of Coverage No.: N /G/n/�/�&z/_Y Facilityi Name: _�{ [ t; W� f,Tcy,•f, Courity: { Phone No. 4 �� O. Total{ _ _L ,�/ Event Precipitation (inches): Waslithis a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See! information below.) ErYes ❑ No Plea' e verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Quaiitative monitoring requirements vary. Most permits require qualitative monitoring to be perfbrmed during a "representative storm event" or during a "measureable storm event." however, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1. inches of rainfall and that is preceded- by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 ii ches has occurred. A single storm event may contain up to 10 Consecutive hours of no preetpitation. A "rrl easurable storm event" is a storm event that results in an-acivai discharge From the permitted site outfall. The previous ineasurable storm event must have been at -least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storrn events during the sampling period, and the permittee ob ins approval from the local DWQ Regional Office. By this signature, I ce that this report is accura omplete to the best of my knowledge: (Signature o rmittee or Designee) i i Page 1 of 2 SWU-242. Last madlAed 10/25/2012 1. 1 OutfaJ] Desctiption: Outfill No. 5truc a (Pi. Rece ving Stream:M-4 Desc-ibhindustrialact:Mties , 4hb '6 C the � 4:-�,_) 4,, ditCh,eitc.) WROM,0equLfall dirzeYiage area: r. . t, 16 L-1 I I Color- Describe the col6r of t�,e,discbayge -6cing basic colors (red, brown, blue, etc.) and tint (lighi, medium, dar . k)14,&eScrJpt,6rs. ` 7', (A, Ii 3. Odor: Describe any distinct-oC ers that th 'discharge y have (i.e., smells strongly of oil, weal chlorine odor, etcT M-C, J 4. Clniriity: Choose. the numbevwhich best describes the clarity:of -thediscbarZ6j where I is clear;and 5 is very cloudy: 1 2 3* 4 S. FloatifigSOMS": Choo . se :the rrUrnber wh . i 6h . best describes the amount of floadrlg.sofids in the siormwater discharge, wher . ejjs'.h.o. 9.olids and.5 is . the surface -cover . ed with floi-ding".'sotids: 2 3.! - 4 5 6. Su-spe-nded'Solids-.Cho6se,the-ri6mbe� .:hich best -describes the amount of:suspended solids in the s6morr6w:Ta I is'416`sbli&,and 5 is extrOrn-ely'Muddy'. 1. .2 3:. 4 7. Is there any foam in the stor water di-schar'ge? Yes B. Is there an oil sheen in the storn water discharge? Yes No 9. Is there evidence of erosion'br deposit i6iiat the out -fall? Yes 10. Other Obvious ludkatbisiot a rmwg te, Pollution: List alnd describe Netel Low clarity, hig.ksolids, "dJor;the'pKeS@ilee Of 1156aM; O''O.'s,heen, o.r erosion/deposition may Peindicative-of pollutant '.,"tDnditi-o-n-swa'r'tarit-'fu'it.h'erinvi'stig5ti6n. 5WU-20, Last mod5fied 10/25/2012 t. raY 1RDENR Stormwate:r Discha-rge..Outfall ($DO) Qualitative Monitoring Report For yuidance on filling outthisll�form, please visit httn:////p rtaLncdenr re/wepfwq/yIs/su/nndessw##tal Permit No.: �I/�/� �/� / i!/ v/ -Q/ U/ or Certificate of Coverage No.: Facil ty Name: i Cou Lee Phione No. `1 9 �- Insp .ctor: 14P 1ti Date �of Inspection:-,1 Timoof Inspection: n� D r� Total; Event Precipitation (inches): 5/9. Was this a 'Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) D-f es ❑ No Pleas e verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureubleform event" (requirements vary, depending on the permit). Me� 0 bG Qual tative monitoring requirements vary. Most permits require qualitative monitoring to be pert rmed during a "representative storm event" br during a "measureable storm event." However, sorn permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfa-i and tihat is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. I A "tz�ieasurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prio i. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interlva) is representative for local storm events during the sampling period, and the permittee obtains approval from the local DV411egional Offte. ' By this signal, rta4f -that-thls--reprart•is•accurate 1 (Sig, a of Permittee or Designee) I Page 1 of 2 SWU•i42, Last modified 10/25/2012 ete to the best of my knowledge: 1, i Outfall Description: Outfall No. _ Structure_(pipe, dit-c#1; etc.) Receiving Stream: _ r Describe the industrial activities' at q,CCU withih iiae-outfall:dra fi-age an --a : _ n C nCV C 2. Color: Describe the color of the di charge using basic colors (red, brown, blue, etc.) and tint (ILght medium, dark) as d.escriptq s: _ 3. i Odor: Describe any distib.ct.odars that the discharge may hav (i.e., smells strongly ofoil; weakichlgrine odor, etc): 4. Clarity: Choose the n_umbe_r which best des ribes the clarity of the discharge, where i is clear nd S is very cloudy: i 1 2 3 4 S.� Floating Solids: Choose th@ numbe•r'which.best describes the amount of floadng.solids in the s rmwater discharge,'where 1 is rio.solids'and 5 is the surfaee:cove"red with floaiting'-solids: I 6, Suspended 5611'iids: Choose'thi dumber which best describes the amount of suspended 5odid in the stormwater discharge, where' I is no solids and 5 is extremely muddy: i 1 2 3.' 4 7. i Is there any foam in the stormwater discharge? Yes ti'o 8. is there an oil sheen in the stormwater discharge? Yes Nc 7 10. Is there evidence oFerosion or deposition, at the out -fall? Yes No Other Obvious Indicators o(Sto.rm'water.No!llution: List and describe Nole f Low clarity, high sal.ids,_aud/p'r khe-,pgesetice.of foahi, oil sheen, or erosion/deposition tray a indicative of pollutant ei06$ �re;.ThB e:coridltions warranC Fi riper investigation. SWU-2 f 2, Last modified 10/25/2012 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qp city fieneral Permit No. NCG030000 Date submitted 1 CERTIFICATE OF COVER GE NO. NCG03 0 C FACILITYNAME I O'VkA FQunArq_ COUNTY La PERSON COLLECTING SAMPLES LABORATORY e t'u n P f Z r Lab Cert. ti Comments on sample coil ction or ana sis: una 0C 10 cc1- tic V-C tc !( s Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR, a SAMPLE PERIOD ❑ Jan -June July -Dec or ❑ Monthly' lmonth) RGV 1 VE10O CLASS ❑ORW ❑HQW []Trout❑PNA ❑Zero -flow ❑Water Supply [:]SA JAN 1-2 Z017 ®Other C. CENTRAL FlW ASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION 5�No discharge this period?a outfall No. Hate Sample 1 Collected (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids - pH, Standard units Copper Lead Zinc Non -Polar 0&15/ Total Petroleum Hydrocarbons Total Toxic Qrganics s Benchmarks =_-> - - 100 mg/L or 50 mg/0 6.0 — 9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469,31). Permit Date: 11/l/2012-10/31/2017 SWU-24S, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the 5tormw2ter Pollution Prevention Plan." (,b A t,� cK vp, Name (Prin name) (� a U) ct.I ' 1 t Sa Note: Results roust be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/t", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period:2 Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar o&G/TPH by EPA 1664 (5GT-HEM) total Suspended Solids pH Benchmarks =__? _ - 15 mg/L 100 mg/L or 50 mg/L• 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012.1U%31/2017 SWU-245,'ast:'�vi5etl llfj[S%LUIL Page 2 of 3 Nate: If you report a sample value in excess of the benchmark, you must implement Tier 1, T1er 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER I REQUIREMENTS, SEE PERMIT PART 11 SECTION B, • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR TH E SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within_30 days of receipt of the lob results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Fifes 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are sign ifica nt_pena I ties for �Itting-fafiSe information, including the possibility of fines and imprisonment for knowing violations." of Permittee) Permit Date: 11/1/2012-10/31/2017 (Da e) SWU-245, last revised 10/25/2012 Page 3 of 3 c�� _ _ �n F c$ 0 7 201T Semi-annual Stormwafer Dischar lDc3nleori1l i e or for North Carolina Division of Water Qu hty General Permdl, No. NCGM-000 Date submitted i ro / CERTIFICATE OF CO}V�RA NO NCG03 0 6 Z � SAMPLE COLLECTION YEAR. � of FACILITY NAME k r �- ��iU A rCj c%!1 C:* SAMPLE PERIOD ❑ )an -June NC July -Dec COUNTY L F'�- -- or ❑ Monthly' (month) PERSON COLLECTING SAMPLES d f C L i✓ DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑DIVA LABORATORY y t3 n ^ Lab Cert. # Zero-flow❑water supply ❑SA Comments on sample collection or ana ysis: Other Part A: Stormwater Benchmarks and Monitoring Results sra°� a ER F�RA91rr1h�G PLEASE REMEMBER TO SIGN ON PACES 2 AND/OR 3 -) ❑ No discharge this period? outf all No. Date Sample I Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids PH, Standard units Copper Lead Zinc - Nan -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics $ Denchmorks -__> _ 100 mg/L or 50 mg/L` 6.0-9.0' - 0.007 mg/L 0.033 mg/t . 0A67 mg/L 15 mg/L 1 mg/t 1 V0 0.0351:y •039:14 0'166M <5X0 r ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall- 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. ;The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433-11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-24S, last revised 10/25/2012 Page 2 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for ITO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the Tf0 monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics MO), s certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management pian included in the Stormwater Pollution Prevention Plan." C'a a-e dcf �­4-, Name (Print na ) Title (Pr -tie] (5i a ure) [ ate} Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX m,//L,.;,', where XX is the numerical value of the detection iimit, reporting limit, etc. in mg/L. Note_ if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier z, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new oil per month. N No dischorge this period: OutfaE! No. Date Sample Collected� Imo/dd/yr] 24-hour rainfall amount, Inches3 Non -polar 0&15/TPH by. EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L` 6.0 — 9-0 SU Footnotes from Part A also apply to this Part B See General PCrmit text, Table 5, identifying the especially sensitive recriving waterrlacsificarinns where the mare Protective henchmark applies. Permit Date: 11/1/2012-10131/2Ul/ Swt;-t<45, iastri•visiu iu/r'�itoit Page 2 of 3 Note- I/ you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses_ See General Permit text. FOR PART A AND PART B MONTTORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION 9. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YE5 ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "Na Discher e" re arts within 317 days of receipt of the lob results or at end of monitoring period in the rase of "No Discharge" reports) to: Division of Water Quality Attm DWQCentrai Files 1617 Mail Service Center Raleigh. North Carolina 276S99-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED= "I certify, under penalty of lays, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted_ Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I e am aware that;herignificant penalties for submitting false information, including the passibility of fines and imprisonment for knowing violations." Permittee) Permit Date: 1111/2012-10/31/2017 -1, 1/-/ / b {Dat } SWU-24S, last revised 10/25/2012 Page 3 of 3 Cameron Testing Services, Inc. Laboratory Report NC DENR #654 NC PHHS #37799 US EPA 4NC01918 ClQe�t.r, Y Hallmon Foundry 161359 ,e" ddt r.r Stormwater #2 - 2U11"s gulato.r Yes _'�,R Sample Information Sam C. Cameron , 09102118 Flecerved A. Simmonds Doge 09/02116 Analyses and Results 161359 01 Outlet #1 +V TS5 262 mg+L 25 09r06116 2540 0 - TSS o$G-W <5.00 mVL 5 09/08/16 EPA 1664A pH 6.0 S. U. 0 09/02/16 4500 H B - pH Metals 02 Outlet #2 M cr TSS 346 m5R 37.3 09/06/16 O&G-W 6.70 r,st 6 09/08116 pH 6.0 s. tr a 09102/16 Mewls Metais (Cu, Pb, Zn) analyzed by First Analytical Labs, Durham, NC; report attached. Report Review Lab Director Date 2540 D - TSS EPA 1664A 4500 H 4 - pH 219 S. Steele Su. 919-2084240 Sanford NC 27330 chris©camerorrtcsting.com "= FIRST ANALYTIC, I..ABOR.IATOF iES a Bo. 110372 - PC16.1Lp inra j:e ?sA, NC 17709 iW"c�,: �52�3- ivUary L�,nP, SU�15 c •f�Ur,.�., N:: �->_3 - �.-... I ; ceuuw�saaes�,��.:�;.+au::True:r„�uw�.xrrt:snA:::.:1:a.;���ue:ulr.:a:.uerwsrs;aE.laes:_j:��,st�n•;4;r�::�•::u;»1r::.�;u:n�a.,:r si �.,,;:,,,;:,i:.av��s,se:;:a4; FAL Project # Client Client Project ID Sample Name: Analyte Copper (Cu) Lead (Pb) Zinc (Zn) Approved by: EPA Method 200 Analysis Report 1609027.2 Cameron Testing Services 161359 161359-02 - Outfali #2 Report Date: 9/16/2016 Date REeceived: 9/7/2016 Concentration in original Sarntle Conc. RL (m[,,/L) (�-ng/L) 0.063 0.001 0.063 0.001, 0.195 0.005 Matt Loftis, Laboratory Pw1anagE:s a; '�.' i I -.. k B 0 T V' I E _,'S, tf L97 F I.R ST A NLu_ N Pr, i3o% 20171-..asea:en LIM ;13 'Ili ­d-jstey La", Su.,.e [jU.L. 3:77, 1 J -I - - k:;.- 1. r, 111-1 i EPA Method 200 Analysis Report FAL Project 4: 1609027.1 Client: Cameron Testing Services Client Project ID: 1613S9 Sample Name: 161359-01 - Outfall 411 Report Date-. 9/16/2010' Date Received: 9/7/2016 Concentration in Original Sample Conc. RL Analyte (mg/L) (mg/L) Copper (Cu) 0,001. Lead (Pb) 0-039 0.001 Zinc (Zn) 0,186 0.00S Approved by: Matt Loftis, Laboratory Manager 219 S. Steele Str. Sanford, NC 27330 Phone: 919-208-4240 Cameron Testing Services, Inc. NC VAN/GVd Cent #654 NC Pt1H S Cert # 37799 US EPA NC01918 Chain of Custody Page of r I r n _ V .i' Emailb _t_ 'Y �. S s Ij •�i��yY -_ tia i CT 16 -- -- f •411• f* only p -. -r' �(, � :-R4Co�efpiny Sam?�er�"'p0� cv,•{' - `+.xbi• 3._� �AGosrtact '%F8X I?h na: �' ..... "`•-`�_is`�.`�t+' "Arnie .L^�, FI'x5 '.-,� 11d ress C 3-St�ta� ��Pro�}sct KI lt�(�/ujtut�ajtary �/Ryushr� __ Sa r� (f �i%�b 5�4•M.ti- "j___I x �l :l' y" �:'I 1=..w ?`�:�1!. !'.•}, ,j t✓Gp leGted:°it= Name; C1 Signature: �i,";.y.=' . r- �[-' A;:L= �� _�' .;`G"r= - .2n - ..+^ _ _ �7F�':. Sari "le_Info�maElon DM .:c. .Z yl, _ir - -a �:'Si•.. e .� �•:�.� - Number of bottlr.s '-:s..4 - - -�.: �1'C fir- esC AnBfy i . u eti� ss` '-.s: t-- 7 � tgv<. ,.. A.�...y - �xY ..� _ , = _ ", '� ..t:Req - a Z �+' ! Preservatives:'(l!}npreservedr FI(C}I S�'ab CTrd Sample ID Q: m } ,� -' a H2(S)O4 N(IJ}03, (Nayihcosulfate,'•;Ne(D)H; O i- U a) o � � o Other (X); Indieate I i i �d:�. �1 --�Z4 Rush work will require prior approval. Additional charges will apply . I 1nl Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report :'orl uidonce on filling out this form, please visit: ht or cdcdenr.pzg/wed fwsjsu%npdess_ti.±fttab_-4 I n 7 Permit No.: N/C/�/ i/ 5 /�/ / Q% or Certificate of Coverage No.: Facility Name: Cour ty: tP Phone No. Inspilctor: eL i~ Data'of Jnspection; n Time of Inspection: D Tota3 Event Precipitation (inches): WasIthis a "Representative Storm Fvent" or "Measureable Storm Event" as defined by the permit? (Seelinformation below.) f _Yes ❑ No Ale* verify whether Qualitative Monitoring must be performed during a "representative stolen evenjt" or "measureoble storm event" (requirements vary, depending on the permit). U Qualitative monitoring requirements vary, Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable, A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and Lhat is preceded by at least 72 hour's (3 days)in which no -storm event measuring greater than 0.1 inches has occurred. A single storm event. may contain up to 10 consecutive hours of no preppitation. A "measurable storm event" is a storm event that results in an actual discharge from the perTitted site outfall. The previous measurable storm event must have been at -least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter inte vaI is representative for local storm events during the sampling period, and the permittee obkains approval from the-loca-1 DWQ Regional office. i By this signature, 1 ce that this report is accu (Signature o rmittee or 1)esignee) Page I of 2 SWU-_2a2, r.a51 modified IC/25/2012 mpiete to the best of my knowledge: 1. 1 Outfall Description: 0 Li'll H No. Rece ving Stream: Desckb the industrial � the / (P. ip e, d i ti '.etc.) e- -Yurwi:WPi Oenutfall Ord-jiijage area: T 2. Color. Describe the color ofthe-disc liarge using basic colors (red, brown, blue, etc.) and tint niedi urn, da rk),asdestriVtors: 3. t Odor: Describe any distinct odors thatLthq discharge Y have (i.e., smells strongly of oil, wea) chlorine odor, etc.); J 4. - 1 Clarity. Cho'ose Lhe number which best describes the clarity of -the. discharge, where I is cleanand 5 is very cloudy; 1 2 3 4 GS S. Mating Solid : Choose the number urnber which best describes the amount of floatingsolidsin the stormwater discharige, where.lJs no solids and.5 is the surface-co'vercd with floating—soliAs: 2 3! - 4 5 6- Su-SpendedSofids.- Chaosc.the.numbee.v6ich best describes the aniount of-suspe.nded solid in the st-orni w�a'liii-dis-66i. 'A''e" 'no -""A' a '��6rn cage;. re I is- so i& and S is C err T 2 3 4 7. Is there any foam in the stormwater dischar'ge? Yes B. l Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion oir,deposition"at the ouffall? Other Obvious Ind icatovs-ofiStormwate e Pollution: List arrd describe Note, Low clarity, high solids, and/6.r'the pre� . R1 . n - cc of foam, May be indicative.of P cond itions r_a' viiit:fWt--hcr investigation.. SWU-2,42. Last modified 10/25/2012 f Stormwater 1Discha`;rge.'OutfaII (SDO) Qualitative Monitoring Report For guidance on filling out thisform, please visit: 1. -d rsr• fweb/wa/ws/su/rindessw##tab-4 Pertrit No.: N/.Q/q/_/ _/ Q/ U/ or Certificate of Coverage No.: N/C& Facility Name: FaUA�," �.- Cou nity: Inspectoi Date !Of Jr Time! of Inspection: h YLIK-r- { Total Event Precipitation (inches): Was [his a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) s ErTes 1] No Please verify whether Qualitative Monitoring must he performed during a "representative storm even �"or "measureable torm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be perf rmed during 6 "representative storm event —or during a "measureable storm event." Howev'er, some permits do not have this requirement. Please refer to these definitions, if applicable. i A "ripa"teis sentative storm event"�is a storm event that measures`gr6n'fer than 0A inches of rainfall and preceded by at least 72 hours (3 days) inwhich no storm event measuring greater than OA inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. i A "lr�'easurable storm event" is a storm event that results in an actual discharge from the permitted site outfall- The previous measurable storm event must have been at least 72 hours prior, The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee ' obtains approval from the local bWQ-Regional Office. i By tl�is signat r-tify-tharthis`ri VoTt-is-accu.rate a _=nn ete to the best of my knowledge: _> r~7 (Sig; a of iermittee or Designee) Page 1 of 2 SWU-242, Last modified 10/2S/U12 i I. Outfall Description: Dutfail No. _ Structure ,(pipe,, ditcli, etc.) Recei�ring Stream: _ r +`I � ,{� Describe the industrial activities dia�t (i cur with'.lrn•the out -fall dra�iri�ge.area: U` go 2. I Color: Describe the color of the discharge rising basic colors (red, brown, blue, etr<.) and tint (light medium, dark) as de5criptors:�l i 3. j Odor. Describe any distinct odors that the discharge may hav (i.e., smells strongly of oil; weakIchlorine odor, etc.): : ` F Olrn__ 4. i Clarity: Cheose the number which best describes the clarity of the discharge, where l is clear' nd 5 is very cloudy: i 1 2 3 4 S. Floating Solids: Choose the number which, best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floa,bng•solids: el 2 3 h 5 6. Suspended Solids: Choosethe number wlii.ch best describes the amount of suspended solidi in the stormwater discharge, where 1 is no solids and 5 is eXtremely.muddy: 1 2 3 4 7. i Is there any foam in the stormwater discharge? Yes NNo 8. j Is there are oil s-heen in the stormwater discharge? Yes CNo) 9. f� Is there evidence of erosion or deposition, at the outfall? Yes No 1 10. Other Obvious Indicators of.Stormwater Yoyllution: i List and describe - �CA Notes Low clarity, high. solids, and/or, the -presence of foam, oil. sheen, or erosion/deposition may be indicative of pvllutdiet exposm*6,.-..T`,dse c.h hd. jd bns Wa—r-'arit Iurttter investigation. Pal e••2 of-2 SWU-24 Last modified 10/25/2012 Semi-annual Stormwater_Discharge Monitoring Leyorl for North Carolina Division of Water Q:4 lity _eneiral Permit iVo. NCG030000 �.�C Date submitted CERTIFICATE OF COVER GE NO. NCG03 0 6 FACILITYNAME �{ I �A �0undrLn COUNTY PERSON COLLECTING SAMPLES C C F LABORATORY e- Cp n 7e t_l ICI Lab Cert. 4 6 S Comments on sample collection or a_na sis: Unrt �� o Cc! t-Ctc.U-c Sar�D 16 S Part A: Stormwater Benchmarks and Monitoring Results o � .. r, n 7 SAMPLE COLLECTION YEAR. " 2017 DE"V�?-L n SAMPLE PERIOD Jan-JuneJuly-Dec Sroil"! , (}j�QU DISCHARGING TO LASS Monthly' �HQW Trout td❑PNA ER �/J�n/ J Zero -flaw owatersupply F]SA ®Other C_ PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -) No dischorge This period?z Outfall No. Date Sample Collected ' (mo/dd/yr) 24-hour rainfall amount, Inches3 � Total Suspended Solids pH, Standard units � Copper Lead Zinc Non-Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organics Benchmarks =__> - 100 mg/L or 50 mg/L' 6.0 - 9.0 --0.007 mg/L ' 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L I ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement_ ' See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. S Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date. 11/1/2012-10/31/2017 SWU-245, IasL revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the stormwater Pollution. Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit- For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics MO), i certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the so4vent management plan included in the Starmwater Pollution Prevention Plan." Name (Prin name) �a OLLI i ij Sa F-e � r'k nm, -C_ r Note: Results must be reported in numerical format. Oo not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mp/L where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a somple value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?? outfall No. Date Sample Collected` (mo/dd/yr) 24-hour rainfall amount, Inches Non -polar O&G/TPH by . EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> 15 mg/L 100 mg/L or SO mg/L• 6.0 — 9.0 slf Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, identifying the especially sensitive receiving water classifir-ations where the more protective henchmark applies. Permit Date: 11/1/2012-10/31/201/ SVVU-ca5, ;ait;vViseri it11<5i2 1.i Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION a_ TIER 3: HAS YOUR FACILIT'd HAD 4 OR MORE BENCHMARK EXCEEOENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Moil on original and one copy of this D&IR, including all "No Dischorae" reports, within 30 days ofreceiot of the lab results (or at end of monitoring period in the rase of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central FileS 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and ail attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significantinformation, including the possibility of fines and imprisonment for knowing violations." (Si ure of Permittee) (Dale) Permit Date; 11/1/2012-10/31/2017 SWU-245, last revised IOJ25/2012 Page 3 of 3 01ALLMAN FOUNDRY Storm Water Compliance Report Mr, Cody Heckle Quality & Safety Manager Hallman Foundry Sanford, NC 27330 Dear Sir or Madam, January 30, 2017 Hallman Foundry 105 East Humber Street Sanford, NC 27330 Phone: (919) 775-3628 Fax: (919) 776-8012 Email: cody.heckle@hallmanfoundry.com URL: hall manfoundryusa.com RECEIVED FEB 07 2017 DENRUND QUALITY Following a Storm Water compliance site inspection performed by the United States Environmental Protection Agency conducted by Region 4, Hallman Foundry has taken initiative to correct any obvious noncompliance and implemented a Storm Water Monitoring and Measuring Program. Hallman Foundry submitted, and thusly, obtained General Permit NCG030000 on June 30, 2016, and before the effective date of the Administrative Compliance Order on Consent (AOC). Hallman Foundry completed and implemented the Stormwater Pollution Prevention Plan on June 28, 2016, and before the effective date of the AOC. Based on the Stormwater Pollution Prevention Plan and the General Stormwater Permit, our Stormwater Program has been implemented by Hallman Foundry Top Management including Alan Heckle (General Manager), Cody Heckle (Quality & Safety Manager), Ron Welker (Maintenance Supervisor) and involves Rain fall measurement, documentation, and submittal to the State of North Carolina Division of Water Quality located in Raleigh; along with two water discharge points that are measured twice a year minimum and tested for Suspended Solids, PH results, Petroleum Hydrocarbons, Copper, Lead, and Zinc. Additionally, Hallman Foundry has introduced a Spill Plan including Spill Kits, Clean -Up Procedures, and Annual Environmental Training in house with all employees; Monthly Housekeeping and Storm Water Inspections. Below is a compiled listing of photos documenting Corrective Actions that Hallman Foundry has made. *,ALLMAN FOUNDRY Storm Water Compliance Repo( Corrective Actions January 30, 2017 Rain Gauge located in Courtyard Water Tunnel Cover at Shake -Out qB 07 2017 01ALLmAN FOUNDRY eorm water c.ompiiance januar ju zui �`s� • .fir Spent Sand Shed with Concrete Pad a Transformer Located inside Buildi 7 m *,ALLMAN FoUNDRY 9 Attachments Hallman Foundry Stormwater Record November 7, 2016 Hallman Foundry Stormwater Record January 9, 2017 i r , Central Files' APS _ SWP _ 8/22/2016 j e"it Number NGG030674 Permit Tracking Slip Program Category Status project Type NPDES SW In review New Project Permit Type Version Permit Classification Metal Fabrication Stormwater Discharge COC COC Primary Reviewer RECEIV ,ED Permit Contact Affiliation julie.ventalaro AUG 2 6 2016 Coastal SWRule E=NTRAI, FILES SECTION Permitted Flow DWR Facility Facility Name Major/Minor Reglon Hallman Foundry Minor Raleigh Location Address County 105 E Humber St Lee Facility Contact Affiliation Sanford NC 27330 Alan Heckle 105 E Humber St Owner Sanford NC 27330 Owner Name Owner Type Hallman Foundry LLC Nan -Government Owner Affiliation Alan Heckle 105 E Humber St Dates/Events Sanford NC 27330 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 6130/2016 8-l4,/1,016 Q'��'�pr(o iD'3//U1-7 Regulated Activities Requested /Received Events Metal products manufacture RO staff report received RO staff report requested 7/29116 Outfall 001 Waterbody Name Slreamindex Number Current Class Subbasin Little Buffalo Creek 17.42 C 03-06-11 Energy, Mineral and Land Resources ENVfPONME.NTAI, QUA[ ITY August 23, 2016 Mr. Alan Heckle Hallman Foundry LL.0 105 Vast Humber St. Sanford, NC 27330 PAT MCCRORY i ovemor DONALD R. VAN DER VAAR,r ,1;vc1 C wrl' ,rRACY DAVIS Oireclnr Subject: General Permit No. NCG030000 Hallman Foundry COC No. NCG030674 Lee County Dear Mr. Hccklc: In accordance with your application for a discharge permit received on June 30, 2016, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state — NPDES general permit. This permit is issued p111-suant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certif-icate of coverage is not transferable except upon approval of the Division of Energy, Mineral and Land Resources. The Division of Energy, Mineral and Land Resources may regUrrC modification or revocation and rcissuance of the certificate of coverage, This permit does not affect the legal requirements to obtain other permits which may be required by the Division of lanergy, Mineral and Land RCSOureCS, the Coastal Area Management Act, or any other federal or local government permit that may be required. Ifyou have any questions concerning this permit, please contact Julie Ventaloro at telephone number (919) 807-6370 or by email julie.ventaloro@neder2r.t;ov. Sincerely, for Tracy E, Davis, P.L., CPM, Director Division of Energy, Mineral and Land Resources ce: Raleigh Regional Office, John Holley Raleigh Regional Office, Danny Smith Central Files Stornnvater Permitting Program Flies State oFNorth Carolina I Environmental Quality I Energy, Mineral and Land Resources 1612 Mail Service Cenlcr 1512 North Salisbury Strect j Raleigh, NC 27699-1612 919 707 9200 T STATE OF NORTH CAROLINA DF.PAIZTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOUIZCES GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030674 STORMWATER DISCHARGES NATIONAL POLLUTANTI)ISCI-IARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Hallman Foundry L,LC is hereby authorized to discharge stormwater from a facility located at Hallman Foundry 105 East Humber St Sanford Lee County to receiving waters designated as Little Buffalo Creek, a class C water in the Cape Fear River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, 111, and IV of General Permit No. NCG030000 as attached. This certiiicate of coverage shall become effective August 23, 2016. This Certificate of'Coverage shall remain in effect for the duration of the General Permit. Signed this day August 23, 2016. for Tracy E. Davis, P.E., CPM. Director, Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission IF NCG030674 N W f S Map Scale 1: 24, 000 rl `� • l ��� � �' �4 � VVV • •Q �4 .J� ,- ;ASS 9 . Y" ,i • �� m R ' Y o r•� Hallman Foundry f 4. ' � 1 ��� i ✓' rcca ' f�. 4 �-- r'19Q I lit Hallman Foundry LLC Hallman Foundry Latitude: 35° 27' 30" N Longitude: 7911 09` 03" W County: Lee Receiving Stream: Little Buffalo Creek Index No: 17-42 Stream Class: C Sub -basin: 03-06-11 (Cape Fear River Basin) -wi■.■ErvMY, .i' Facility Location Fir ; 10 .-�.� a C®ENR �� Ca.OUNa pEvxq-x.ExT O. . w ?.Tin Errr u.o Na�,gnu FS50uPCE! NOTICE OF INTENT Division of Energy=, Mineral and Land Resources' Land Quality Section National Pollutant Dischar-e Etimination Svstem NCG030000 • REC mamm �Ma =10R M .SUN 0 2016 DENR-LAND Q LITY. National Pollutant Discharge Elimination System application for coveraSTCR�VrkT€�,r �r�t12,G NCG030000: t IIN STOrRMWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) 335 Rolling, Drawing, and Extruding of Nonferrous Metals SIC 3398 Metal Heat Treating SIC 34 Fabricated Metal Products SIC 35 industrial and Commercial Machinery SIC 36 Electronic and Other Electrical Equipment SIC 37 Transportation Equipment SIC 38 Measuring. Analyzing, and Controlling Instruments r For questions, please contact the DEMLR Regional Office for your area. See page 4. 1L � - - Mailing address of owner/operator (adds „11 Name AL1 ,4yf4w Street Address 0 S F/jS'r City S4WA-0Ato Telephone No. q !9 7 7.!r- ; 2) Location of facility producing discharge: {Please print or type) G1N�/Ly LL State IVC ZIP Code 27330 Fax: q / 9 -774 -,e p 1 L- 06-V Facility Name Half lk•o j-Oy4a, r/ _ Facility Contact 49ah yrc k!c Street Address ! OS fa5f City �Ll Prr- -J-AV, _ State A"[ ZIP Code 2 -733n County L e if Telephone No. ql �f-7 75- 3 �g Fax: Email "'n 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection), r'm US J, Ake' 1+;L/ ,(/y��Jews -/h"n ydkc /two �f ``7h �o' rrjrrnn1 /i!✓r/uMcPr�G���f.N`ur u�w /f le, 7 rna� Y',"yilfalyl J i1GjT(lYiu4 7/ G`+� �✓t-fat ���7 !N l�k.q��'J�. (rG.'r'I iTr If GIy iA copy of a counly mad or USGS quad sheet with the facility clearly located must be submitted with this applicaiion.l 4) Latftu �� Longitude 7c1,/ 5U�S5"� _ (deg, min, sec) C .ya 271 V-2" .-6 7 9`' y 1 311" Page 1 of 4 SW i-218-071408 Lasl revised 712/14 NCG030000 N.O.I. 5) This NPDES Permit Application applies to which of the following: ❑ New or Proposed Facility Date operation is to begin tZ Existing 6) Standard Industrial Classification: Provide the 4-digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility. SIC Code: 3 L 7— 1 7) Provide a brief narrative description of the types of industrial activities and products manufactured at this facility: CrHsl Ljoj ,�a 8) Discharge points 1 Receiving waters: How many discharge points (ditches, pipes, channels, etc_) convey stormwater from the property? What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater discharges end up in? G,fjle Receiving water classification: G Is this a 303(d) listed stream? Has a TMDL been approved for this watershed? tin If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). Z-1 9) Does this facility have any other NPDES permits? ® No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: 10) Does this facility have any Non -Discharge permits (ex: recycle permit)? U) No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility_ 11) Does this facility employ any best management practices for stormwater control? ❑ No R Yes (Show any structural BMPs on the site diagram.) If yes, please briefly describe: Roof Cvvry ¢. 5ej fi,v3r lcerlf'o�, ufuNt ,BMP iOt 1­r/rf 12) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No 'R Yes If yes, when was it implemented? 0 13) Are vehicle maintenance activities occurring at this facility? ❑ No X Yes 14) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? .N No ❑ Yes Page 2 of 4 SWU-218-071408 Last revised 712114 NCC030000 N.O.I. b) Is this facility a Small Quantity Generator (less than 1000 kq. of hazardous waste generated per month) of hazardous waste? 4 No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? g No ❑ Yes d) Is hazardous waste stored in the 100-year flood plain? PF No 0 Yes If yes, include information to demonstrate protection from flooding. e) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored. Where is material stored: How many disposal shipments per year: Name of transport 1 disposal vendor: Vendor address: 15) C) rtification: .-North Carolina General Statute 143-275.6E (i) provides that: Any person who knowingly makes any false statement, representa lion, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or roles of the Commission implementing this Article shag be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars (S 10.000). I hereby request coverage under the referenced General Permit, i understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. i certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: DO Vi d \A/ �' `� yl Title: �� M$L-''T — Aj �V' _ (Signature of Applica (Gate Signed) This Notice of Intent must be accompanied by a check or money order for $100.00, made payable to: NCQENR Page 3 of 4 5WU•218-071408 Lasl revised 7014 NCG030000 N.O.I. Final Checklist This application will be returned as incomplete unless all of the following items have been included: W Check for $100 made payable to NCDENR. 10 This completed application and all supporting documents. A site diagram showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwater management structures, (c) location of stormwater outfalls corresponding to the drainage areas, (d) runoff conveyance features, (e) areas where materials are stored, (f) impervious areas, (g) site property lines. k� Copy of county map or LISGS quad sheet with the location of the facility clearly marked on the map. Mail the entire package to: Stormwater Permitting Unit Program Division of Energy, Mineral and Land Resources 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Note The submission of this document does not guarantee coverage under the General Permit. For questions, please contact the DEMLR Regional Office for your area. DEMLR Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office-..(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office ......... (919) 807-6300 Page 4 of 4 SWU-218-071408 Last revised 712/14 ENGINLERING & ENVIRONMENTAL SCIENCE 4 314 CO., INC. `25. q fbxh iiNq MdEtlllRblYll.`6:S 3008 ANDERSON DRIVE, SUITE 102 _ RALEION, NC 27609 Date .� JLt �� 66-21-530 Pay do the ore J ~fan�'0 Dollars WELLS FARGO BANK, N.A. WELLSFARGO.COM roar 11, .... � .. .. .. i t.. 1, .1.! �1: � .1?. (,4 .� .�I.4 J. .tart. ..1 �. M '',. ..11, �. A{'�l`I'�:: ��'.. •��i.�a�.. t ':i .n r. fr. , . tL .t �Y i r � 1 „' r.�a. ♦��'..l b��Z 1.�� �,y. ��7P. ,� t (" R'. STORM WATER POLLUTION PREVENTION PLAN Hallman Foundry 105 East Humber St. Sanford, NC .tune 28, 2016 Prepared For: Prepared By: Mr. Alan Heckle Engineering & Environmental Hallman Foundry Science Company 105 East Humber St. 3008 Anderson Dr., Suite 102 Sanford, NC 27330 Raleigh, NC 27609 r 7 q, A�-L T. Patrick Shillington, PE I r:� �e... •� S,H;;t33• m TABLE OF CONTENTS Pap,e No. 1.0 Introduction................................................................................... 1 2.0 Facility Information...................................................................... 2 2.1 General.............................................................................. 2 2.2 Industrial Activities ................................................ 2 2.3 Mechanical & Equipment Maintenance ............................2 2.4 Pollution Prevention Team Member Roster......................3 2.5 SWPP Certification................................................3 2.6 Non -Storm Water Discharges ................................. 4 3.0 Potential Pollution Sources..............................................................4 4.0 Pollution Prevention........................................................................5 4.1 Physical Controls.................................................................5 4.1.1 Activities Under roof................................................5 4.1.2 Vegetative Buffers and Other Sediment Controls.......................................5 4.1.3 Above Ground Tanks and Storage Containers....5 4.2 Good Housekeeping Activities ............................................ 5 4.3 Preventative Maintenance and Visual Inspection.............6 4.4 Signs and Labels...................................................................6 4.5 Proper Waste Disposal.........................................................8 4.6 Comprehensive Site Compliance Evaluation And Employee Training.......................................................t0 5.0 Stormwater Monitoring...................................................................IO 6.0 Spill Prevention and Response........................................................10 7.0 Record Keeping................................................................................I I LIST OF ATTACHMENTS Attachment A: Vicinity Map Attachment B: Forms Attachment C: General Permit NCG03000 DRAWINGS (24" X 36") Sheet 1: Facility Layout Page I SWPPP Hallman Foundry 1!0 INTRODUCTION This Storm Water Pollution Prevention Plan (SWPPP) has been prepared for compliance with direction of the United States Environmental Protection Agency (USEPA) under the Federal Water Pollution Control Act, as amended by the Clean Water Act of 1977 (33 U.S.0 1251, et., seg.). This SWPPP shall be maintained by Hallman Foundry on -site at 105 East Humber St., Sanford, North Carolina. The SWPP shall be submitted to the Director of the State NPDES regulatory, entity or the USEPA, within ten (10) working days (post marked) of a request. This plan shall also be modified as required by the Director or the USEPA within sixty (60) days of such notification. This SWPPP shall be revised and updated by the perrnitee at least annually. This SWPP includes two parcels of land (PID Nos. 965241888100 and 965241999200) totaling 4.3 acres and owned by A Stocki Company. ' This permitee shall maintain a record which summarizes the results of all inspections and a certification that the facility is in compliance with this SWPPP (indicating implementation of ' Best Management Practices — BMPs) and identifying any incident(s) of non-compliance. All accompanying reports and changes to this SWPPP shall be retained for at least three (3) ' years after expirations of the pen -nit. This SWPPP has been prepared by a Professional Engineer licensed in the State of North 1 Carolina. It should be clearly noted that there is no legal guarantee associated with the SWPPP, but it is a statement that, to the best of his knowledge, the plan has been prepared in accordance with good engineering practices. No other warranties, expressed or implied, are provided. This statement shall in no way relieve the owner or operator of this facility covered ' by the SWPPP of their duty to prepare or fully implement this plan. 1 This plan is intended to be a "living docutnent." This means that this plan is to be updated as Best Management Practice, state regulations and/or facility conditions change. Statement of Policy for the SWPPP Hallman Foundry, Inc. intends to develop and implement the SWPP for the purpose of ' minimizing the potential for the release of toxic or hazardous substances directly, or indirectly, to the storm drainage system. Page 2 SWPPP Hallman fomidry 2.0 FACILITY INFORMATION 2.1 General The physical address of Hallman Foundry is 105 E. Humber St., Sanford, NC 27330. The facility is located in Lee County. Runoff from this facility primarily drains to a ditch along the west side of the property, and a minor area drains beneath a culvert at the Rail Road Spur. The runoff then runs north and discharges to Little Buffalo Creek, a Class C designated Stream. (See Figure 1, Attachment A, and Sheet 2: Facility Layout). Other pertinent facility information is as follows. Phone Number: (919) :775-3628 Latitude: 35.4584 75' Longitude:-79.150858' SIC Code: 3321 Hallman foundry is located on 4.3 acres of land. The foundry produces and ductile castings. The foundry has been in operation under various ownership since 1935. 2.2 INDUSTRIAL ACTIVITIES Ductile iron is melted in electric induction furnaces. Carbon in the form of ground bituminous coal is added during the melting process. Molds are constructed of silica sand, bentonite (montmorillonite clay) and corn flour. A COZ process is used to harden core molds and Isocure binding process is used to harden the molds. The castings are separated from the mold in the shake out area. Approximately 65% of the sand is ' reclaimed during the shake separation process. The castings are then transported by forklift to the grinding area, where the protrusions are removed by grinding. The castings are air cooled. 2.3 VEHICLE AND EQUIPMENT MAINTENANCE Vehicle and equipment maintenance activities are conducted under a dedicated building. Vehicle fluids, eelectric motor fluids, and lubricants are stored in 55-gallon barrels at a separate dedicated building. Waste fluids are stored in 55-gallon barrels in the maintenance building. No more than 20 gallons of fluid wastes are generated in any given month. The wastes are picked up by Noble Oil Services, a recycling company in Sanford, NC. u I 11 I 1 0 1 Page 3 S1vPPP Hallmin Foundq 2 4 i'ollirtiori Prcventzart learn i4lfetnbcr?Roster In order to implement, maintain and revise the SWPPP; Hallman Foundry, Inc. has assigned the following personnel to be members of the Pollution Prevention Team, The activities and responsibilities of each team member are listed below. Tl�3LE Nt7 }1.'' 1'gllutiosi Pre've�t>un,Te.iri I1leulier,Roster,;: Team llenrber/Title Res )onsibilir Alan 1-leckle/Plant Manager Ultimate responsibility for the implcmentation of the SWPPP. Responsible for allocating funds for matar�ials, supplies, and manpower for im lernentation of the SWPPP. Cody Heckle/Stormwater Responsible for implementation of SWPPP. Review of Plan Coordinator activities for SWPPP. Responsible for compliance and coordination of SWPPP with all parties concerned. Document and parties concerned. Document and test discharges. Provide guidance on improvement of SWFPP. Reports directly to Alan Heckle Name: Alan Heckle Title: Plant Manager 1!aeility Name: Hallman_ foundry Facility Address; 105 East Humber St. Sanford ETC 27330 "1 certify under penalty of law that this document and nll attachinents were prepared wider my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathming the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibilityof fine and imprisonment for knowing violations." Signature: Date: Page 4 SWPPP Hallman Foundry 2.6 Non -Storm Water Discharges ' The Hallman Foundry Facility requires a pen -nit to discharge stone water because materials are potentially in contact with storm water. As a requirement of this permit, the outfalls associated with storm water discharges from areas of industrial activity have been evaluated for the presence of non -storm water discharges. Based on the evaluation one (1) drain is located in the vehicle and equipment maintenance building. This drain has been permanently plugged by filling with concrete. Two (2) foundation drain systems are provided to collect groundwater. The water is pumped and discharged from a sumps -This discharge is not ���Np��hrrry considered process water requiring a pen -lit. goa�,�H f J Signature `� '� r5 to Professional Engineering License 15472 15472 13.0 POTENTIAL POLLUTION SOURCES '''%;', K I The Hallman foundry facility has two (2) discharge points with concentrated flow. Discharge point No. I has the bulk of the plan runoff collection that discharges to a ditch along the west side of the facility. Discharge Point No. 2 collects a small area of runoff and discharges through a 10 inch plastic culvert beneath the railroad tracks. Industrial and maintenance activities at the facility that have been or may potentially be sources of significant amounts of pollutants include the following- 0 Loading and unloading of oils and loss/spillage of material • Outdoor storage of new and used materials or products • Dust or particulate generating processes • Vehicle and equipment operations (incidental contact, drippage or wear, such as tires and brake linings) • Vehicle and equipment maintenance activities • Onsite waste storage • Galvanized metal surfaces on roofs Outdoor manufacturing and processing activities are not conducted at this facility 'I CA .�` 1 Page 5 SWPPP Hallman Foundry 4.0 Polliiiiari Pre'vekion 8 With the issuance of the stormwater permit Best Management will be followed and improved from past activities. These practices include Physical Controls, Good Housekeeping, Preventative Maintenance, Record -Keeping and Internal Reporting. The ultimate solution of pollution runoff is storage of materials and conducting activities under roof to prevent direct contact with precipitation. 4.1 Physical Controis 4.1.1' Activities ,Under Roof, t Much of the plant activities are conducted under the protection of the building. These ' activities included the raw material storage and finished product storage. Also, vehicle maintenance is conducted under roof. The finished product is only exposed outside o I f the buildings during the air cooling process. .4.3.2,1 Vegetative Buffers and Other;Sediment Contirols . y. A Stormwater Basin is proposed at Discharge Point No. I to collect sediment runoff. A storage bin is proposed for temporary collection of spent foundry sand and casting molds. No. 57 stone will be placed on access roads and parking area where no vegetation is established. 4.1. ,''Above Ground Tanks -and Stora a Containers ..' �. One (1) portable 200 gallon diesel above ground storage tank is present at the site. Secondary containment is not required for this tank. The tank should be located at least 100 ft. from any drain or ditch. Several 55 gallon barrels containing petroleum product and radiator fluid is stored in a dedicated building. The barrels are placed on their side with a tap and valve used to remove the fluids from the barrel. A trough is provided beneath the tap to collected loss of fluids. 4.2 'Good. Housekeeping Activities Good housekeeping practices are designed to maintain a clean and orderly work ' environment. An effective first step in preventing stormwater contamination at industrial facilities involves using common sense to improve the facility's basic housekeeping 11 Page 6 SWPPP Hallman Foundry methods. A clean and orderly work area can reduce the possibility of accidental spills cause by mishandling of liquids or chemicals and equipment and should reduce safety hazards to facility personnel. Well -maintained material and chemical storage areas will reduce the possibility of stormwater contact with contaminants. Some simple procedures the facility can use to promote good housekeeping include the involved operation and maintenance of industrial machinery and processes, materials storage practices, materials inventory controls, routine and regular cleanup schedules, maintaining well -organized work areas, and educational programs for employees regarding all of these practices. A Good Housekeeping Checklist is completed monthly by a member of the Pollution Prevention Team. Blank forms are provided in Attachment B. Completed forms are kept with the Plant Engineer, 4.3 Preventive Maintenance and Visual Inspection The following items are inspected routinely for future maintenance activities: 1. Vehicles for leaks. 2. Hydraulic lines of material handling equipment for leaks. 3. 200 gallon Diesel AST for leaks. 4. Outside storm drains for accumulation of sediment. 5. Stormwater basin (to be constructed) for proper functioning. 6. Mold and spent sand storage bin (to be constructed) for material loss by wind and water erosion. 7. Fluid spillage from chemical building, maintenance building and compressor area. 8. Stone coved areas for erosion and stone loss. 4.4 Signs and Labels j Labels should be placed on all containers containing flammable, hazardous, or corrosive materials. The labels should indicate the type of material contained. Signs indicating proper handling and cleanup procedures should be posted where these materials are stored. Materials identified as requiring labels include petroleum products, manganese, and soda ash. Standards for hazardous material labeling are per OSHA/MSHA standards. Page 7 SWPP Hallman Foundry 4.5 Proper Waste Disposal Used Foundry Sand Past analytical testing has been conducted on the used Foundry Sand. The material is! non- hazardous and individual metal content is below the Groundwater Protection and Health Standards. The material is used as beneficial till at a LC[D landfill. Used Molds and Bag House Fines Collection These materials are sent to the Uwharrie Landfill in Montgomery County, NC. Scrap Metal Scrap metal is re -used for production of castings Used Hydraulic Oil, Motor Oil, Lubricants and Anti -Freeze Waste fluids are collected by Noble Oil Services. Page S SWPP Hallman Foundry 4.6 Comprehensive -Site, Compliance Evaluation and Employee Training A Bi-Annual observation by qualified personnel is conducted to perform the following: • Inspect storm water drainage areas for evidence of pollutants entering the site drainage system. • Evaluate the effectiveness of measures to reduce pollutant loadings and whether additional measures are needed. • Observe structural measures, sediment controls, and other storm water BMPs to ensure proper operation. ' + Inspect any equipment needed to implement the plan, such as spill response equipment. • Revise the plan as needed within two weeks of inspection (potential pollutant source ' description of measures and controls). • Implement any necessary changes in a timely manner, but at least within 12 weeks of the inspection. Prepare a report summarizing inspection and follow up actions, the date of inspection and personnel who conducted the inspection; identify any incidents of noncompliance or certify that the facility is in compliance with the plan. Sign the report and keep it with the plan. 11 11 11 11 Page 9 SWPP Hallman Foundry Employee training is essential to effective implementation of the Storm Water Pollution Prevention Plan. Each employee that works in a particular area of the plant is trained for proper material handling and spill prevention and good housekeeping practices. The training program will consist of a formal training session and regular follow-up sessions to update and reinforce the formal training. The facility training sessions will include an overview of the following information included in written documentation. This overview ' will include information on where the documentation is maintained at the facility: Material Safety Data Sheets tWritten instructions for handling hazardous substances. Facility stone water pollution prevention. Facility spill prevention, control, and countermeasures. ' Material management practices. BMP's including spill prevention measures, equipment, and safety procedures. Recent spills or accidents at the facility or at a similar facility with discussion about causes and corrective actions taken. Upcoming new equipment installations at the facility that will impact pollution prevention ' planning or implementation of BMP's. Chemical and physical properties of industrial materials. Inspection procedures. ' Applicable environmental laws, regulations, and guidance documents. Procedures for preventing contact between materials and storm water runoff. Procedures for using, inspecting, repairing, and replacing facilities or equipment used for ' spill response. Key parameters for automatic shutoff systems. Communications equipment and alarm systems. ' Response to spills and actions required to prevent spill from reaching storm water. People to contact in the event of a spill and what to do in the event of a spill. Reporting requirements for chemical leaks and spills. Procedures for tank truck unloading. Operation and maintenance of containment equipment. ' Page 10 SwPP Hallman 5.0 Stormwater Monitoring ` Stonnwater monitoring is in accordance with General Permit NCG030000 issued to this facility. Attachment C contains a copy of this permit . 6.0 Spill Prevention and Res onse Spills and leaks are a significant potential source of Stormwater pollutants, and in;many cases, are avoidable. The standard operating procedures such as spill prevention procedures, along with proper employee training can reduce the potential for accidental releases. The following areas are identified for potential spillage: 1. Above ground 200 gallon diesel tank. 2. Virgin and used motor fluids. 3. Spillage of virgin and used foundry sand near surface drains 4. Petroleum releases from hydraulic equipment, vehicles and stationary motor, operated equipment. Storage of fluids at the maintenance shop and virgin storage area is in areas out of congested pedestrian and vehicle traffic. Should a spill occur, the material is immediately cleaned up using absorbent pads and powder. Should the release saturate the ground, the soil is removed and placed in sealed barrels for off site disposal at a proper facility. At various locations of the plant, a release could result from any of the hydraulic equipment, stationary motors and from moving trucks and construction equipment. The release is immediately adsorbed, and ground contaminated is excavated. All releases are immediately reported to the Stormwater Plan Coordinator or any of the other Pollution Prevention Team Members. Page I 1 SWPP Ilallman 1. 7.0 Record Kee in . Record keeping is important to demonstrate that the facility is operated in a way that minimizes the potential for pollutants to enter the environment. Attachment B contains fon-ris that address the fallowing: Site Compliance Evaluation 2. SWPPP Review and Update a. Personnel Training Record 4. Spill Documentation Report 5. Equipment inspection and Preventative Maintenance Record 6. Material Inventory Record 7. Future BMP implementation schedule Stormwater Pollution Prevention Plan Amendments Facility Name: Hallman Foundry Location: 105 E. Humber St. , Sanford, NC GOOD HOUSEKEEPING CHECKLIST Plant Name: Inspector Name: Inspector Signature: Date: Yes No Are outside areas kept in a neat and orderly condition? Are haul road adequately covered with pavement or stone? �Is there evidence of leaks to the outside of the building containing the chemical storage, vehicle maintenance and compressors? Is there evidence of drips of leaks from equipment or machinery outside? Is there evidence of loss of waste materials from the waste storage bin? Is there evidence of spillage or leakage of the 200 gallon diesel AST? Are walkways and passageways easily accessible, safe and free of protruding objects, materials, or equipment? Is there evidence of dust on the ground from industrial operations or processes? Are cleanup procedures used for spilled solids? Are good housekeeping procedures and reminders posted in appropriate locations around the workplace? Are there regular housekeeping inspections? Is the sediment basin functioning properly, to include no obstruction for the outlet structure, adequate vegetative cover for the embankment, and erosion or scour of the downstream ditch. GOOD HOUSEKEEPING CHECKLIST Corrective Actions Responsible Action Taken Date Required Personnel Date: Instructor: ANNUAL EMPLOYEE TRAINING PROGRAM Time: Location: (Name and Title) EMPLOYEE TRAINING PROGRAM TOPICS COVERED Good Housekeeping _Review and demonstrate basic cleanup (sweeping and vacuuming procedures). _Clearly indicate proper disposal locations. _Post signs in materials handling areas reminding staff on good housekeeping procedures. Verity that employees know where routine cleanup equipment is located. SPILL PREVENTATION AND RESPONSE _Clearly identify potential spill areas and drainage routes. _Familiarize employees with past spill events (why they happened and the environmental impact). _Post warning signs in spill areas with emergency contacts and telephone numbers. _Introduce the Spill Response Coordinator and the spill "team." _Drill on spill cleanup procedures _Post the locations of spill cleanup equipment and the persons responsible for operating the equipment. ANNUAL EMPLOYEE TRAINING PROGRAM MATERIALS HANDLING AND STORAGE _Verify that employees know what materials are hazardous and where those materials are stored. Point out container labels. _Instruct employees to use the oldest materials first. _Explain recycling processes _Demonstrate how valves are tightly closed and how drums should be sealed __ _Demonstrate how to fuel vehicles and avoid "topping off." ANNUAL EMPLOYEE TRAINING PROGRAM Attendance List Annual Employee Stormwater Training Program Instructor: Date: Name Title ATTACHMENT C: General Permit NCG03000 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM for establishments primarily engaged in the following activities: Metal Fabrication In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission and the Federal Water Pollution Control Act, as amended, this permit is hereby issued to all owners or operators, hereinafter permittees, which are covered by this permit as evidenced by receipt of a Certificate of Coverage by the Environmental Management Commission to allow the discharge of stormwater to the surface waters of North Carolina or to a separate storm sewer system conveying discharges to surface waters in accordance with the terms and conditions set forth herein. I Coverage under this General Permit is applicable to: • Al l owners or operators of stormwater point source discharges associated with activities classified as establishments primarily engaged in activities classified as establishments primarily engaged in: • Rolling, Drawing, and Extruding of Nonferrous Metals, standard industrial classification (SIC 335) • Heat Treating of Metal (SIC 3398) • Fabricating of Metal Products (SIC 34) ■ Manufacturing of industrial and Commercial Machinery (SIC 35) ■ Manufacturing of Electronic Equipment (SIC 36) ■ Manufacturing of Transportation Equipment (SIC 37) ■ Manufacturing of Measuring and Analyzing Instruments (SIC 38)) • Stormwater point source discharges from like industrial activities deemed by DWQ to be similar to these operations in the process, or the discharges, or the exposure of raw materials, intermediate products, by-products, products, or waste products. Except upon DWQ determination of similarity as provided immediately above, the following activities and associated discharges are excluded from coverage under this General Permit: Establishments primarily engaged in the ship and boat building and repairing (SIC 373), which is covered by general stormwater permit NCG190000. The General Permit shall become effective on November 1, 2012. The General Permit shall expire at midnight on October 31, 2017 Signed this day October 25, 2012. Original signed by Matt Matthews for Charles Wakild, A.E., Director Division of Water Quality By the Authority of the Environmental Management Commission Permit No. NCG030000 TABLE OF CONTENTS PART I INTRODUCTION Section A: General Permit Coverage Section B: Permitted Activities PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES Section A: Stormwater Pollution Prevention Plan Section B: Analytical Monitoring Requirements Section C: On -Site Vehicle and Equipment Maintenance Monitoring Requirements Section D: Qualitative Monitoring Requirements PART III STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS Section A: Compliance and Liability 1. Compliance Schedule 2. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liability 5. Oil and Hazardous Substance Liability 6. Property Rights 7. Severability B, Duty to Provide Information 9. Penalties for Tampering 10. Penalties for Falsification of Reports 1.1. Onshore or Offshore Construction 12. Duty to Reapply Section B: General Conditions 1. General Permit Expiration 2, Transfers 3. When an Individual Permit May be Required 4. When an Individual Permit May be Requested 5. Signatory Requirements 6. General Permit Modification, Revocation and Reissuance, or Termination U Section C: Section D Section E: Permit No. NCG030000 7. Certificate of Coverage Actions 8. Annual Administering and Compliance Monitoring Fee Requirements Operation and Maintenance of Pollution Controls 1. Proper Operation and Maintenance 2. Need to Halt or Reduce not a Defense 3. Bypassing of Stormwater Control Facilities Monitoring and Records 1. Representative Sampling 2. Recording Results 3. Flow Measurements 4. Test Procedures S. Representative Outfall 6. Records Retention 7. Inspection and Entry Reporting Requirements 1. Discharge Monitoring Reports 2. Submitting Reports 3. Availability of Reports 4. Non-Stormwater Discharges S. Planned Changes 6. Anticipated Noncompliance 7. Spills 8. Bypass 9. Twenty-four Hour Reporting 1.0. Other Noncompliance 11. Other Information PART IV DEFINITIONS Permit No. NCGO30000 PART I — INTRODUCTION SECTION A: GENERAL PERMIT COVERAGE All persons desiring to have facilities covered by this General Permit must register with the Division of Water Quality (DWQ) by the filing of a Notice of Intent (NO1) and applicable fees. The N01 shall be submitted and a certificate of coverage issued prior to any point source discharge of stormwater associated with industrial activity to the surface waters of the state. Any owner or operator not wishing to be covered or limited by this General Permit may make ' application for an individual NPDES permit in accordance with NPDES procedures in 15A NCAC ZH .0100, stating the reasons supporting the request. Any application for an individual permit should be made at least 180 days prior to commencement of discharge. This General Permit does not cover activities or discharges covered by an individual NPDES permit until the individual permit has expired or has been revoked. Any person conducting an activity covered by an individual permit but which could be covered by this General Permit may request that the individual permit be revoked and coverage under this General Permit be provided. If industrial materials and activities are not exposed to precipitation or runoff as described in 40 CFR §122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit requirements. Any owner or operator wishing to obtain a No Exposure Exclusion must submit a No Exposure Certification Notice of Intent (NO I) form to the Division; must receive approval by the Division; must maintain no exposure conditions unless authorized to discharge under a valid NPDES stormwater permit; and must recertify the No Exposure Exclusion annually. Any facility may apply for new or continued coverage under this permit until a Total Maximum Daily Load (TMDL) for pollutants for stormwater is established. A TMDL sets a pollutant -loading limit that affects a watershed, or portion of a watershed, draining to a specific impaired water. For discharges to watersheds affected by a TMDL, coverage under this permit may depend on the facility demonstrating it does not have reasonable potential to violate applicable water quality standards for those pollutants as a result of discharges. if DWQ determines that discharges have reasonable potential to cause water quality standard violations, the facility shall apply for an individual permit 180 days prior to the expiration date of this General Permit. Once that individual permit is effective, the facility will no longer have coverage under this General Permit. Note that the permittee must identify impaired waters (scheduled for TMDL development) and waters already subject to a TMDL in the Site Overview, as outlined in the Stormwater Pollution Prevention Plan, Part 11, Section A. During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater associated with industrial activity. Such discharges shall be controlled, limited and monitored as specified in this permit. Part I Page 1 of 2 n 11 11 11 I n u I Permit No. NCG030000 SECTION B: PERMITTED ACTIVITIES Until coverage under this permit expires or is modified or revoked, the permittee is authorized to discharge stormwater to the surface waters of North Carolina, or to a separate storm sewer system, which has been adequately treated and managed in accordance with the terms and conditions of this General Permit. Any other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization, or approval. The discharges allowed by this General Permit shall not cause or contribute to violations of Water Quality Standards. Discharges authorized by this permit and site operations must meetapplicable wetland standards, as recorded in 15A NCAC 2B .0230 and .0231, and water quality certification requirements as outlined in 15A NCAC 2H .0500. This permit does not relieve the permittee's responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, or decree. Part 1 Page 2 of 2 11 Permit No. NCG030000 PART 11 - MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A: STORMWATER POLLUTION PREVENTION PLAN The permittee shall develop and implement a Stormwater Pollution Prevention Plan (SPPP). The SPPP shall be maintained on site unless exempted from this requirement by the Division. The SPPP is public information in accordance with Part Ill, Standard Conditions, Section E, paragraph 3 of this permit. The SPPP shall include, at a minimum, the following items: I. Site Overview. The Site Overview shall provide a description of the physical facility and the potential pollutant sources that may be expected to contribute to contamination of stormwater discharges. The Site Overview shall contain the following: (a) A general location mall (USGS quadrangle map or appropriately drafted equivalent map), showing the facility's location in relation to transportation routes and surface waters; the name of the receiving waters to which the stormwater outfalls discharge, or if the discharge is to a municipal separate storm sewer system, the name of the municipality and the ultimate receiving waters; and accurate latitude and longitude of the points of stormwater discharge associated with industrial activity. The general location map (or alternatively the site map) shall identify whether any receiving waters are impaired (on the state's 303(d) list of impaired waters) or if the site is located in a watershed for which a TMDL has been established, and what the parameters of concern are. (b) A narrative description of storage practices, loading and unloading activities, outdoor ' process areas, dust or particulate generating or control processes, and waste disposal practices. A narrative description of the potential pollutants that could be expected to be present in the stormwater discharge from each outfall. ' (c) A site map drawn at a scale sufficient to clearly depict: the site property boundary; the stormwater discharge outfalls; all on -site and adjacent surface waters and wetlands; industrial activity areas (including storage of materials, disposal areas, process areas, loading and unloading areas, and haul roads); site topography and finished grade; all drainage features and structures; drainage area boundaries and total contributing area for each outfall; direction of flow in each drainage area; industrial activities occurring in each drainage area; buildings; stormwater Best Management Practices (BMPs); and impervious surfaces. The site map must indicate the percentage of each drainage area that is impervious, and the site map must include a graphic scale indication and north arrow. ' (d) A list of significant spills or leaks of pollutants during the previous three (3) years and any corrective actions taken to mitigate spill impacts. (e) Certification that the stormwater outfalls have been evaluated for the presence of non- stormwater discharges. The permittee shall re -certify annually that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. The certification statement will be signed in accordance with the requirements found in Part III, Standard Conditions, Section B, Paragraph 3. 1 Part 11 Page 1 of 10 0 Permit No. NCG030000 2. Stormwater Management Strategy. The Stormwater Management Strategy shall contain a narrative description of the materials management practices employed which control or minimize the stormwater exposure of significant materials, including structural and nonstructural measures. The Stormwater Management Strategy, at a minimum, shall incorporate the following: (a) Feasibility Study. An annual review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to rainfall and run-on flows. Wherever practical, the permittee shall prevent exposure of all storage areas, material handling operations, and manufacturing or fueling operations. In areas where elimination of exposure is not practical, this review shall document the feasibility of diverting the stormwater run-on away from areas of potential contamination. (b) Secondary Containment Requirements and Records. Secondary containment is required for: bulk store of liquid materials including petroleum products; storage in any amount of Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) water priority_ chemicals; and storage in any amount of hazardous substances, in order to prevent leaks and spills from contaminating stormwater runoff. A table or summary of all such tanks and stored materials and their associated secondary containment areas shall be maintained. If the secondary containment devices are connected to stormwater conveyance systems, the connection shall be controlled by manually activated valves or other similar devices which shall be secured closed with a locking mechanism. Any stormwater that accumulates in the containment area shall be at a minimum visually observed for color, foam, outfah staining, visible sheens, and dry weather flow, prior to release of the accumulated stormwater. Accumulated stormwater shall be released if found to be uncontaminated by any material. Records documenting the individual making the observation, the description of the accumulated stormwater, and the date and time of the release shall be kept for a period of five (S) years. (c) BMP Summary. A listing of site structural and non-structural Best Management Practices (BMPs) shall be provided. The installation and implementation of BMPs shall be based on the assessment of the potential for sources to contribute significant quantities of pollutants to stormwater discharges and on data collected through monitoring of stormwater discharges. The BMP Summary shall include a written record of the specific rationale for installation and implementation of the selected site BMPs. The BMP Summary shall be reviewed and updated annually. 3. Spill Prevention and Response Procedures. The Spill Prevention and Response Procedures (SPRP) shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility. Facility personnel responsible for implementing the SPRP shall be identified in a written list incorporated into the SPRP and signed and dated by each individual acknowledging their responsibilities for the plan. A responsible person shall be on site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. The SPRP must be site stormwater specific. Therefore, an oil Spill Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP, but may not be sufficient to completely address the stormwater aspects of the SPRP. The common elements of the SPCC with the SPRP may be incorporated by reference into the SPRP, Part 11 Page 2 of 10 Permit No. NCC,030000 Preventative Maintenance and Good Housekeeping Program. A preventative maintenance and good housekeeping program shall be developed and implemented. The program shall address all stormwater control systems (if applicable), stormwater discharge outfalls, all on -site and adjacent surface waters and wetlands, industrial activity areas (including material storage areas, material handling areas, disposal areas, process areas, loading and unloading areas, and haul roads), all drainage features and structures„and existing structural BMPs. The program shall establish schedules of inspections, maintenance, and housekeeping activities of stormwater control systems, as well as facility equipment, facility areas, and facility systems that present a potential for stormwater exposure or stormwater pollution where not already addressed under another element of the SPPP. Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program. Timely compliance with the established schedules for inspections, maintenance, and housekeeping shall be recorded and maintained in the SPPP. 5. Facility Inspections. Inspections of the facility and all stormwater systems shall occur as part of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi- annual schedule, once during the first half of the year (January to June), and once during the second half (July to December), with at least 60 days separating inspection dates (unless performed more frequently than semi-annually). These facility inspections are different from, and in addition to, the stormwater discharge characteristic monitoring at the outfalls required in Part li B, C, and D of this permit. 6. Employee Training. Training programs shall be developed and training provided at a minimum on an annual basis for facility personnel with responsibilities for: spill response and cleanup, preventative maintenance activities, and for any of the facility's operations that have the potential to contaminate stormwater runoff. The facility personnel responsible for implementing the training shall be identified, and their annual training shall be documented by the signature of each employee trained. 7, Responsible Party. The SPPP shall identify a specific person(s) or position(s) responsible for the overall coordination, development, implementation, and revision of the SPPP. Responsibilities for all components of the SPPP shall be documented and position assignments provided. 8. SPPP Amendment and Annual Update. The permittee shall amend the SPPP whenever there is a change in design, construction, operation, site drainage, maintenance, or configuration of the physical features which may have a significant effect on the potential for the discharge of pollutants to surface waters. All aspects of the SPPP shall be reviewed and updated on an. annual basis. The annual update shall include: (a) an updated list of significant spills or teaks of pollutants for the previous three (3) years, or the notation that no spills have occurred (element of the Site Overview); (b) a written re -certification that the stormwater outfalls have been evaluated far the presence of non-stormwater discharges (element of the Site Overview), (c) a documented re-evaluation of the effectiveness of the on -site stormwater BM Ps (BMP Summary element of the Stormwater Management Strategy). (d) a sto Cement that annual training requirements were met in the year past: (e) a review and comparison ofsannple analytical data to benchmark values (if applicable) over the past year, including a discussion about Tiered Response status. The permittee shall use the Division's Annual Summary Data Monitoring Report (I)MR) form, available from the Stormwater Permitting Unit's website (See 'Monitoring Forms' here: http://pot-taLncdetir.org/web/wq/wslauLnULe,,isw). Part 11 Page 3 of 10 Permit No. NCG030000 The Director may notify the permittee when the SPPP does not meet one or more of the minimum requirements of the permit. Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the SPPP to meet minimum requirements. The permittee shall provide certification in writing (in accordance with Part 111, Standard Conditions, Section B, Paragraph 3) to the Director that the changes have been made. 9. SPPP implementation. The permittee shall implement the Stormwater Pollution Prevention Plan and all appropriate BMPs to prevent contaminants from entering surface waters via stormwater. Implementation of the SPPP shall include documentation of all monitoring, measurements, inspections, maintenance activities, and training provided to employees, including the log of the sampling data and of actions taken to implement BMPs associated with the industrial activities, including vehicle maintenance activities. Such documentation shall be kept on -site for a period of five (5) years and made available to the Director or the Director's authorized representative immediately upon request, 10. Solvent Management Plan. Facilities that implement a Solvent Management Plan may so certify, and the requirement for Total Toxic Organics (TTO) monitoring in Part 11, Section 8, may be waived. The Solvent Management Plan shall include: (a) an annually updated and quantified inventory of the total toxic organic compounds present on site during the previous three years; (b) a narrative description of the in -plant locations and uses of the toxic organic compounds, the method of disposal including quantities disposed on- and off -site; (c) the management procedures and engineering measures for assuring that toxic organics do not spill or leak into stormwater. DWQ may at its discretion require submittal, review, and approval of the Solvent Management Plan as a condition of continuing the TTO sampling waiver. For those facilities electing to employ the TTO sampling waiver, the permittee shall include the following signed certification statement on each discharge monitoring report: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), ! certify that to the best of my knowledge and belief, no leak, spill, or dumping of concentrated toxic organics into the stormwater or onto areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. 1 further certify that this facility is implementing all the provisions of the Solvent Management Plan included in the Storm water Pollution Prevention Plan." Parti! Page 4 of 10 Permit No. NCG030000 SECTION B: ANALYTICAL MONITORING REQUIREMENTS Analytical monitoring of stormwater discharges shall be performed as specified in Table 1. All analytical monitoring shall be performed during a measureable storm event at a i stormwater discharge outfall (SDO). Only SDOs discharging stormwater associated with industrial activity must be sampled (See Definitions). A measurable storm event is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval From the local DWQ Regional Office. See Definitions. Table 1 Analytical Monitoring Requirements Discharge Characteristics Units Measurement Fre uenc 1 Sample Type2 Sample Location3 H standard semi-annual Grab SDO Total Suspended Solids m L semi-annual Grab SDO Non -Polar Oil & Grease / TPH EPA Method 1664 SDT-HEM mg/L semi-annual Grab SDO Copper, Total Recoverable mg1L semi-annual Grab SDO Lead, Total Recoverable m L semi-annual Grab SDO Zinc, Total Recoverable m L semi-annual Grab SDO Total Toxic Organics (TTO)4 mg/1, semi-annual Grab SDO Total Rainfalls inches semi-annual 1 Rain Gauge - Footnotes: 1 Measurement Frequency: Twice per year during a measureable storm event: 2 Grab samples shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless 'representative outfall status (ROS) has been granted. A copy of the letter granting ROS shall be kept on site. 4 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations. manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal Finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12, for electronic crystal manufacture use the definition as found in 40 CFR 469.22. and for cathode rav tube manufacture use the definition found in 40 CFR 469.31.) S For each sampled measureable storm event, the total precipitation must be recorded. An on -site rain gauge or local rain gauge reading must be recorded. Where isolated sites are unmanned for extended periods of time, a local rain gauge reading may be substituted for an on -site reading. The permittee shall complete the analytical samplings in accordance with the schedule specified below in Table 2, unless adverse weather conditions prevent sample collection (see Adverse Weather in Definitions). A minimum of 60 days must separate Period 1 and Period 2 sample dates, unless monthly monitoring has been instituted as part of other requirements of this permit. Inability to sample because of adverse weather conditions must be documented in the SPPP and recorded on the DMR.. The permittee must report the results from each sample taken within the monitoring period (see Part Ill, Section E). Part 11 Page 5 of 10 Permit No. NCG030000 Table 2 Monitoring Schedule Monitoring period'.2 . Sample Number Start End Year 1 - Period 1 1 January 1, 2013 June 30, 2013 Year 1 - Period 2 2 _ July 1, 2013 December 31, 2013 Year 2 - Period 1 3 'January 1, 2014 June 30, 2014 Year 2 - Period 2 4 July 1, 2014 December 31, 2014 Year 3 - Period 1 5 January 1, 2015 June 30, 2015 Year 3 _ Period 2 6 July 1, 2015 December 31, 2015 Year 4 - Period 1 7 January 1, 2016 June 30, 2016 Year 4 - Period 2 9 July 1, 2016 December 31, 2016 Year 5 - Period 1 9 January 1, 2017 June 30, 2017 Year 5 - Period 2 10 July 1, 2017 October 31, 2017 footnotes: 1 Maintain semi-annual analytical monitoring throughout the permit renewal process (unless other provisions of this permit prompt monthly sampling). 2 If no discharge occurs during the sampling period, the permittee nlustsubmit a monitoring report indicating "No Flow" or "No Discliarge" within 30 days of the end of the sampling period. Failure to monitor semi-annually per permit terms may result in the Division requiring monthly monitoring for all parameters for a specified time period. "No discharge" from an outfall or inability to collect a sample because of adverse weather conditions during a monitoring period, for example does not constitute failure to monitor, as long as it is properly reported. The permittee shall compare monitoring results to the benchmark values in Table 3. The benchmark values in Table 3 are not permit limits but should be used as guidelines for the implementation of the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program. See below the descriptions of Tier One, Tier Two, and Tier Three response actions. In the event that DWQ releases the permittee from continued monthly monitoring under Tier Three, DWQ's release letter remains in effect through the subsequent reissuance of this permit, unless the release letter provides for other conditions or duration. Table 3 Benchmark Values for Analytical Monitoring Discharge Characteristics Benchmark Values PH' 6 - 9 standard units 1 Total Suspended Solids (TSS) 100 mg/L TSS ORW [IWO, Trout & PNA waters 50 mg/L Non -Polar Oil & Grease TPH by EPA Method 1664 SG?' - HEM 15 mg/L Copper, Total Recoverable 0.007 mg/L Lead Total Recoverable 0,030 mg/L Zinc, Total Recoverable 0.067 mg/L Total Toxic Organics (TTO) 1 mg/L Foptnote,s: 1 If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation instead of 6 S. U. Readings from an on -site or local rain gauge must be documented to demonstrate background concentrations were below the benchmark pH range. Part 11 Page 6 of 10 Permit No. NCG030000 Tier One j If: The first valid sampling results are above a benchmark value, or outside of the benchmark range, for any hparameter at any outfall; Then: The permittee shall: 7. Conduct a stormwater management inspection of the facility within two weeks of receiving sampling results, 2. Identify and evaluate possible causes of the benchmark value exceedance. 3. Identify potential and select the specific: source controls, operational controls, or physical improvements to reduce concentrations of the parameters of concern, and/or to bring concentrations within the benchmark range. 4. Implement the selected actions within two months of the inspection, S. Record each instance of a'Fier One response in the 5PPP. Include the date and value of the benchmark exceedence, the inspection date, the personnel conducting the inspection, the selected actions, and the date the selected actions were Tier Two If: During the term of this permit, the first valid sampling results from two consecutive monitoring periods are above the benchmark values, or outside of the benchmark range, for any specific parameter at a specific cuscnarge ouErau; Then: The permittee shall: 1. Repeat all the required actions outlined above in Tier One. 2. Immediately institute monthly monitoring for all parameters. Conduct monthly monitoring at every outfall where a sampling result exceeded the benchmark value for two consecutive samples. Monthly (analytical and qualitative) monitoring shall continue until three consecutive sample results are below the benchmark values or within benchmark range. 3. Submit a monthly monitoring report indicating "No Plow" if no discharge occurs during the sampling period. 4. Benchmark exceedances for a different parameter separately trigger a tiered response. S. Maintain a record of the Tier Two response and monitoring results in the SPPP. Tier Three During the term of this permit, if the first valid sampling results required for the permit monitoring periods exceed the benchmark value, or are outside the benchmark range, for any specific parameter at any specific outfall on four occasions, the permittee shall notify the DWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results. DWQ may but is not limited to: • require that the permittee revise, increase, or decrease monitoring frequency for some or all parameters; • rescind coverage under the General Permit, and require that the permittee apply for an individual stormwater discharge permit, • require the permittee to install structural stormwater controls; • require the permittee to implement other stormwater control measures; • require the permittee to perform upstream and downstream monitoring to characterize impacts on receiving waters; or • require the permittee implement site modifications to qualify for the No Exposure Exclusion. Part 11 Page 7 of 10 u 1 0 Permit No. NCG030000 SECTION C: ON -SITE VEHICLE AND EQUIPMENT MAINTENANCE MONITORING REQUIREMENTS Facilities that have any vehicle maintenance activity occurring on -site which uses more than 55 gallons of new motor oil and/or hydraulic oil per month when averaged over the calendar year shall perform analytical monitoring as specified below in Table 4. All analytical monitoring shall be performed during a measureable storm event at all stormwater discharge outfalls (SDOs) that discharge stormwater runofffrom vehicle and equipment maintenance areas, and in accordance with the schedule presented in Table 2 (Section B). Sampling is not required outside of the facility's normal operating hours. Table 4 Analytical Monitoring Requirements for On -Site Vehicle Maintenance Discharge Characteristics Units Measurement Ere uenc 1 Sample Type7 Sample Location3 H standard semi-annual Grab SDO Non -Polar Oil & Grease / TPH EPA Method 1664 SGT-HEM mg/L semi-annual Grab 5D0 Total Suspended Solids m L semi-annual Grab SDO Total RainfaI14 inches semi-annual Rain gauge New Motor Oil Usage gallons/month 1 semi-annual Estimate - Footnotes; 1 Measurement Frequency: Twice per year during a measureable storm event, until either another permit is issued for this facility or until this permit is revoked or rescinded. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. Z Grab samples shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) that discharges stormwater runoff from area(s) where vehicle maintenance activities occur. 4 For each sampled measureable storm event the total precipitation must be recorded. An on -site or local rain gauge reading must be recorded. Where isolated sites are unmanned for extended periods of time, a local rain gauge reading may be substituted for an on -site reading. Failure to monitor semi-annually per permit terms may result in the Division requiring monthly monitoring for all parameters for a specified time period, as provided in Part If Section B. Monitoring results shall be compared to the benchmark values in Table S. The benchmark values in Table 5 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs), as provided in Part 11 Section B. Table 5 Benchmark Values for On -Site Vehicle and Equipment Maintenance Activities Discharge Characteristics Benchmark Values l-1 6 — 9 standard units Non -Polar Oil & Grease / TPH EPA Method 1664 SGT-HEM 15 mg/L Total suspended solids (MI 100 m L TSS ORW, HQW, Trout, and PNA waters 50 rn L Part 11 Page S of 10 1 I Permit No. NCC030000 SECTION D; QUALITATIVE MONITORING REQUIREMENTS The purpose of qualitative monitoring is to evaluate the effectiveness of the permittee's implementation of the SPPP and to assess new sources of stormwater pollution. Qualitative monitoring of stormwater outfalls must be performed during a measurable storm event. Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status, Qualitative monitoring shall be performed semi-annually as specified in Table 6 and concurrent with the required analytical monitoring events (unless the permittee is required to perform further qualitative sampling per the Qualitative Monitoring Response, below). Inability to sample because of adverse weather conditions must be documented in the SPPP. Only SDOs discharging stormwater associated with industrial activity must be monitored (See Definitions). Table 6 Qualitative Monitoring Requirements Discharge Characteristics Frequency) Monitoring Location2 Color semi-annual SDO Odor semi-annual SDO Clarity semi-annual SDO Floating Solids semi-annual SDO Suspended Solids semi-annual SDO Foam semi-annual SDO Oil Sheen semi-annual SDO Erosion or deposition at the outfall semi-annual SDO Other obvious indicators of stormwater pollution semi-annual SDO Footnotes: 1 Measurement Frequency: Twice per year during a measureable storm event. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. The permittee must continue qualitative monitoring throughout the permit renewal process. Z Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO) regardless of representative outfall status. A minimum of 60 days must separate monitoring dates, unless additional sampling has been instituted as part of other analytical monitoring requirements in this permit In the event an atypical condition is noted at a stormwater discharge outfall, the permittee shall document the suspected cause of the condition and any actions taken in response to the discovery. This documentation shall be maintained with the SPPP. Part 11 Page 9 of 10 it Permit No, NCG030000 If the permittee's qualitative monitoring indicates that existing stormwater BMPs are ineffective, or that significant stormwater contamination is present, the permittee shall investigate potential causes, evaluate the feasibility of corrective actions, and implement those corrective actions within 6.0 days, per the Qualitative Monitoring Response, below. A written record of the permittee's investigation, evaluation, and response actions shall be kept in the SPPP. Qualitative Monitoring Response Qualitative monitoring is for the purposes of evaluating the effectiveness of the perjittee's impienetaion of the SPPP, and for assessing new sources of stormwater pollution, and for prompting the permittee's response to pollution. If the permittee repeatedly fails to respond effectively to correct problems identified by qualitative monitoring, or if the discharge causes or contributes to a water quality standard violation, DWQ may but is not limited to: • require that the permittee revise, increase, or decrease monitoring frequency for some or all parameters (analytical or qualitative); • require the permittee to install structural stormwater controls; • require the permittee to implement other stormwater control measures; • require the permittee to perform upstream and downstream monitoring to characterize impacts on receiving waters; or • require the permittee implement site modifications to qualify for a No Exposure Exclusion. Part 11 Page 10 of 10 Permit No. NCG030000 PART III STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS SECTION A: COMPLIANCE AND LIABILITY CQWpiiance Schedule The permittee shall comply with Limitations and Controls specified for stormwater discharges in accordance with the following schedule: Existing Facilities already operating but applying for permit coverage for the first time: The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the Certificate of Coverage and updated thereafter on an annual basis. Secondary containment, as specified in Part 11, Section A, Paragraph 2(b) of this general permit, shall be accomplished within 12 months of the effective date of the issuance of the Certificate of Coverage, New Facilities applying for coverage for the first time: The Stormwater Pollution Prevention Plan shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity and be updated thereafter on an annual basis. Secondary containment, as specified in Part 11, Section A, Paragraph 2(b) of this general permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity. Existing facilities previously permitted and applying for renewal under this General Permit: All requirements, conditions, limitations, and controls contained in this permit (except new SPPP elements in this permit renewal) shall become effective immediately upon issuance of the Certificate of Coverage. New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and implemented within 6 months of the effective date of this general permit and updated thereafter on an annual basis. Secondary containment, as specified in Part III, Paragraph 2(b) of this general permit shall be accomplished prior to the beginning of discharges from the operation of the industriai activity. ' 2. Duty to Comply The permittee must comply with all conditions of this general permit. Any permit noncompliance constitutes a violation of the Clean Water Act (CWA) and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or denial of a permit upon renewal application [40 CFR 122.41]. ' a. The permittee shall comply with standards or prohibitions established under section 307(a) of the CWA for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions, even if the general permit has not yet been modified to incorporate the requirement. 1 b. The CWA provides that any person who violates sections] 301, 302, 306, 307, 308, 318 or 405 of the Act, or any permit condition or limitation implementing any such sections in a permit issued under section 402, or any requirement imposed in a pretreatment program approved under 1 sections 402(a)(3) or 402(b)(8) of the Act, is subject to a civil penalty not to exceed $37,500 per day for each violation. [33 USC 1319(d) and 40 CFR 122.41(a)(2)] c. The CWA provides that any person who negligently violates sections 301, 302, 306, 307, 308. 318, or 405 of the Act, or any condition or limitation implementing any of such sections in a permit issued under section 402 of the Act, or any requirement imposed in a pretreatment program approved under section 402(a)(3) or 402(b)(8) of the Act, is subject to criminal penalties of $2,500 to $25,000 per day of violation, or imprisonment of not more than 1 year, or both. In the case of a second or subsequent conviction for a negligent violation, a person shali be Part III Page 1 of 10 11 Permit No. NCGO30000 subject to criminal penalties of not more than $50,000 per day of violation, or by imprisonment of not more than 2 years, or both. [33 USC 1319(c)(1) and 40 CFR 122.41(a)(2)] d. Any person who knowingly violates such sections, or such conditions or limitations is subject to criminal penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. In the case of a second or subsequent conviction for a knowing violation, a person shall be subject to criminal penalties of not more than $100,000 per day of violation, or imprisonment of not more than 6 years, or both. [33 USC 1319(c)(2) and 40 CFR 122.41(a)(2)1 e. Any person who knowingly violates section 301, 302, 303, 306, 307, 308, 318 or 40S of the Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of the Act, and who knows at that time that he thereby places another person in imminent danger of death or serious bodily injury, shall, upon conviction, be subject to a Fine of not more than $250,000 or imprisonment of not more than 15 years, or both. In the case of a second or subsequent conviction for a knowing endangerment yiolation, a person shall be subject to a fine of not more than $500,000 or by imprisonment of not more than 30 years, or both. An organization, as defined in section 309(c)(3)(B)(iii) of the CWA, shall, upon conviction of violating the imminent danger provision, be subject to a fine of not more than $1„000,000 and can be fined up to $2,000,000 for second or subsequent convictions, [40 CFR 122.41(a)(2)] f. Under state law, a civil penalty of not more than $25,000 per violation may be assessed against any person who violates or fails to act in accordance with the terms, conditions, or requirements of a permit [North Carolina General Statutes § 143-215.6A] g. Any person may be assessed an administrative penalty by the Administrator for violating section 301, 302, 306, 307, 308, 318 or 405 of this Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of this Act. Administrative penalties for Class I violations are not to exceed $16,000 per violation, with the maximum amount of any Class I penalty assessed not to exceed $37,500. Penalties for Class 11 violations are not to exceed $16,000 per day for each day during which the violation continues, with the maximum amount of any Class If penalty not to exceed $177,500. [33 USC 1319(g)(2) and 40 CFR 122.41(a)(3)] ' 3. Duty to Mitigate The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this general permit which has a reasonable likelihood of adversely affecting human health or the environment [40 CFR 122.41(d)l, 4. Civil and Criminal Liabili Except as provided in Part I II, Section C of this general permit regarding bypassing of $tormwater control facilities, nothing in this permit shall be construed to relieve the permittee from any responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215,3,143-215.6, or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for consequential damages, such as fish kills, even though the responsibility for effective compliance may be temporarily suspended. S. Qil and Hazardouubstance Liability Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject to under NCGS 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321. 6. Property Rights The issuance of this general permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any Part 111 Page 2 of 10 Permit No. NCG030000 invasion of personal rights, nor any infringement of Federal, State or local laws or regulations [40 CFR 122.41(g)l. 7. Severabiiity The provisions of this general permit are severahie, and if any provision of this general permit, or the application of any provision of this general permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainder of this general permit, shall not be affected thereby [NCGS 1SOB-23]. S. Duly to Provide Information The permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any information which the Permit Issuing Authority may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the general permit issued pursuant to this general permit or to determine compliance with this general permit. The permittee shall also furnish to the Permit Issuing Authority upon request, copies of records required to be kept by this general permit [40 CFR 122.41(h)l. 9. Penalties for TamperinY The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this general permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4 years, or both [40 CFR 122.41]. 10. Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement representation, or certification in any record or other document submitted or required to be maintained under this general permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both [40 CFR 122.411, 11. Onshore or Offshore Construction This general permit does not authorize or approve the construction of any onshore or offshore physical structures or facilities or the undertaking of any work in any navigable waters. 12. Duty LQ Mapply Dischargers covered by this general permit need not submit a new Notice of Intent (NO[} or renewal request unless so directed by the Division. If the Division chooses not to renew this general permit, the permittee will be notified to submit an application for an individual permit [15A NCAC 02H .0127(e)]. SECTION B. GENERAL CONDITIONS 1. General Permit Expiration General permits will be effective for a term not to exceed five years, at the end of which the Division may renew them after all public notice requirements have been satisfied. If a general permit is renewed, existing permittees do not need to submit a renewal request or pay a renewal fee unless directed by the Division. New applicants seeking coverage under a renewed general permit must submit a Notice of Intent to be covered and obtain a Certificate of Coverage under the renewed ' general permit [15A NCAC 02H .0127(e)]. 1 Part ill Page 3 of 10 Permit No. NCG030000 2. Transfers This general permit is not transferable to any person without prior written notice to and approval from the Director in accordance with 40 CFR 122.61. The Director may condition approval in accordance with NCGS 1.43-215.1, in particular NCGS 143-215.1(b)(4)b.2., and may require modification or revocation and reissuance of the Certificate of Coverage, ora minor modification, to identify the new permittee and incorporate such other requirements as may be necessary under the CWA [40 CFR 122.41(1)(3), 122.611 or state statute. The Permittee is required to notify the Division in writing in the event the permitted facility is sold or closed. 3. When an IndividualEermit May be Required The Director may require any owner/operator authorized to discharge under a certificate of coverage issued pursuant to this general permit to apply for and obtain an individual permit or an alternative general permit. Any interested person may petition the Director to take action under this paragraph, Cases where an individual permit may be required include, but are not limited to, the foilowing: a. The discharger is a significant contributor of pollutants; b. Conditions at the permitted site change, altering the constituents and/or characteristics cf the discharge such that the discharge no longer qualifies for a general permit; C. The discharge violates the terms or conditions of this general permit; d. A change has occurred in the availability of demonstrated technology or practices for the control or abatement of pollutants applicable to the point source; e. Effluent limitations are promulgated for the point sources covered by this general permit; f. A water quality management plan containing requirements applicable to such point sources is approved after the issuance of this general permit; g. The Director determines at his or her own discretion that an individual permit is required. 4. When an I ndivijUalMay be RequeSted Any permittee operating under this general permit may request to be excluded from the coverage of this general permit by applying for an individual permit. When an individual permit is issued to an owner/operator the applicability of this general permit is automatically terminated on the effective date of the individual permit. 5. $ignato equiremp1,ts All applications, reports, or information submitted to the Permitting Issuing Authority shall be signed and certified [40 CFR 122.41(k)]. a. All Notices of Intent to be covered under this general permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures, Part Ill Page 4 of 10 Permit No. NCG030000 (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, State, Federal, or other public agency. by either a principal executive officer or ranking elected official [40 CFR 122.22]. b. All reports required by the general permit and other information requested by the Permit Issuing Authority shall be signed by a person described in paragraph a. above or by a duly authorized representative of that person. A person is a duly authorized representative only if: (1) The authorization is made in writing by a person described. above; (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or well rleld, superintendent, a position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position,); and (3) The written authorization is submitted to the Permit Issuing Authority [40 CFR 1.22.22] c. Changes to authorization: if an authorization under paragraph (b) of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of paragraph (b) of this section must be submitted to the Director prior to or together with any reports, information, or applications to be signed by an authorized representative [40 CFR 122.221 d. Certification. Any person signing a document under paragraphs a. or b. of this section shall make the following certification 140 CFR 122.22]. NO OTHER STATEMENTS OF CERTIFICATION WILL BE ACCEPTED: "I certify, under penalty of law, that this document and all attachments were prepared tinder my direction orsupervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible forgathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. l ant aware that there are Significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." b. General Permit Modification. Revocation and Reissuance, or Termination The issuance of this general permit does not prohibit the Permit Issuing Authority from reopening and modifying the general permit, revoking and reissuing the general permit, or terminating the general permit as allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123, Title 15A of the North Carolina Administrative Code, Subchapter 2H ,0100, and North Carolina General Statute 143-215.1 et al. After public notice and opportunity for a hearing, the general permit may be terminated for cause. The filing of a request for a general permit modification, revocation and reissuance, or termination ' does not stay any general permit condition. The Certificate of Coverage shall expire when the general permit is terminated. 7. Certificate of Coverage Actions The general permit may be modified, revoked and reissued, or terminated for cause. The notification of planned changes or anticipated noncompliance does not stay any general permit condition [40 CFR 122.41(fj1. 1 PartI ll Page 5 of 1.0 Permit No, NCG030000 8. AnnuaLAdrpinisteringand _Complianf Nlpnitoring Fee ReQuirements The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by the Division. Failure to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(2) may cause this Division to initiate action to revoke coverage under the general permit. SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS 1. Praoer Operation and„Maintenance The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of this permit [40 CFR 122.41(e)]. 2. Need to Hgll or Reduce Not a Defense It shall not he a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this general permit [40 CFR 122.41(c)]. 3. Bypassing of Stormvyater Control Faci]Wgs Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless: a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and b. There were no feasible alternatives to the bypass, such as the use of auxiliary control facilities, retention of stormwater or maintenance during normal periods of equipment downtime or dry weather. This condition is not satisfied if adequate backup controls should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and c. The permittee submitted notices as required under, Part III, Section E of this general permit If the Director determines that it will meet the three conditions listed above, the Director may approve an anticipated bypass after considering its adverse effects. SECTION D: MONITORING AND RECORDS 1.Represenlative ' Samples collected and measurements taken, as required herein, shall be characteristic of the volume and nature of the permitted discharge. Analytical sampling shall be performed during a measureable storm event Samples shall be taken on a day and time that is characteristic of the discharge. All ' samples shall be taken before the discharge joins or is diluted by any other waste stream, body of water, or substance. Monitoring points as specified in this general permit shall not be changed without notification to and approval of the Permit Issuing Authority [40 CFR 122.41(j)]. 2. Recording Results For each measurement or sample taken pursuant to the requirements of this general permit, the permittee shall record the following information [40 CFR 122.411: ' a. The date, exact place, and time of sampling or measurements; b. The individual(s) who performed the sampling or measurements; 1 PartIiI Page 6 of 10 I Permit No. NCG030000 c. The dates) analyses were performed; d. The individual(s) who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. Flow Measurements Where required, appropriate now measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. 4. Tesx-['rocedures Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136. To meet the intent of the monitoring required by this general permit, all test procedures must produce minimum detection and reporting levels and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. if no approved methods are determined capable of achieving minimum detection and reporting levels below general permit discharge requirements, then the most sensitive (method with the lowest possible detection and reporting level) approved method must be used. R_e,QL,Sgntative Outfall If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled, the permittee may petition the Director for representative outfall status. If it is established that the stormwater discharges are substantially identical and the permittee is granted representative outfall status, then sampling requirements may be performed at a reduced number of outfalls. 6. ion Qualitative monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan (SPPP). Copies of analytical monitoring results shall also be maintained on -site. The permittee shall retain records of all monitoring information, including o all calibration and maintenance records, o all original strip chart recordings for continuous monitoring instrumentation, o copies of all reports required by this general permit, a copies of all data used to complete the Notice of Intent to be covered by this general permit. These records or copies shall be maintained for a period of at least 5 years from the date of the sample, measurement, report or Notice of Intent application. This period may be extended by request of the Director at any time [40 CFR 122,41]. if this volume of records cannot be maintained on -site, the documents must be made available to an inspector upon request as immediately as possible. InspgctiQn and Entry The permittee shall allow the Director, or an authorized representative (including an authorized contractor acting as a representative of the Director), or in the case of a facility which discharges through a municipal separate storm sewer system, an authorized representative of a municipal operator or the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to: Part III Page 7 of 10 Permit No. NCG030000 a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions bf this general permit, b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this general permit; c. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this general permit; and d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the Clean Water Act, any substances or parameters at any location [40 CPR 122.41(i)]. SECTION E: REPORTING REQUIREMENTS Samples analyzed in accordance with the terms of this general permit shall be submitted to the Division on Discharge Monitoring Report (DMR) forms provided by the Director. DMR forms are available on the Division's website(ttp;JIgoM[.ncdenr.org/web%wq/ws/sulnpdessw). Submittals shall be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. When no discharge has occurred from the facility during the report period, the permittee is required to submit a discharge monitoring report, within 30 days of the end of the specified sampling period, giving all required information and indicating "NO FLOW" as per NCAC T15A 02H .0506. If the permittee monitors any pollutant more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 and at a sampling location specified in this general permit or other appropriate instrument governing the discharge, the results of such monitoring shall be included in the data submitted on the DMR. The permittee shall record the required qualitative monitoring observations on the SDO Qualitative Monitoring Report form provided by the Division and shall retain the completed forms an site. Qualitative monitoring results should not be submitted to the Division, except upon DWQ's specific requirement to do so. Qualitative Monitoring Report forms are available at the website above. 2. Submitting Reports Two signed copies of Discharge Monitoring Reports (DMRs) shall be submitted to: Central Files Division of Water Quality 1617 Mail Service Center ' Raleigh, North Carolina 27699-1617 3. Availability of Reports Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the Federal Act, 33 llSC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices of the Division. As required by the Act analytical data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143-215.6E or in Section 309 of the Federal Act. 4. Non-Stormwater Disc es If the storm event monitored in accordance with this general permit coincides with a non- stormwater discharge, the permittee shall separately monitor all parameters as required under all Part Ill Page 8 of 10 I Permit No. NCG030000 other applicable discharge permits and provide this information with the stormwater discharge monitoring report S. Planned Changes The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged 140 CFR 122,41(l)]. This notification requirement includes pollutants which are not specifically listed in the general permit or subject to notification requirements under 40 CFR Part 122.42 (a). 6. Anticipated Noncompliance The permittee shall give advance notice to the Director of any planned changes at the permitted facility which may result in noncompliance with the general permit [40 CFR 122.41(l)(2)], 7, Wih The permittee shall report to the local DWQ Regional Office, within 24 hours, all significant spills as defined in Part IV of this general permit. Additionally, the permittee shall report spills including: any oil spill of 25 gallons or more, any spill regardless of amount that causes a sheen on surface waters, any oil spill regardless of amount occurring within 100 feet of surface waters, and any oil spill less than 25 gallons that cannot be cleaned up within 24 hours. 8. Bypass Notice [40 CFR 122.41(m)(3)]: a, Anticipated bypass. If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and affect of the bypass. b. Unanticipated bypass. The permittee shall submit notice within 24 hours of becoming aware of an unanticipated bypass. twenty-four }lour Reporting a. The permittee shall report to the central office or the appropriate regional office any noncompliance which may endanger health or the environment Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance [40 CFR 122.41(I)(6)]. b. The Director may waive the written report on a case -by -case basis for reports under this section if the oral report has been received within 24 hours. c. Occurrences outside normal business hours may also he reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. 10. Other Noncompliance The permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time monitoring reports are submitted [40 CFR 122.41(1)(7)]. Partlit Page 9 of 10 I 11 11 io 11 n io u Permit No. NCG030000 11. OtUr Information Where the Permittee becomes aware that it failed to submit any relevant facts in a Notice of Intent to be covered under this general permit, or submitted incorrect information in that Notice of Intent application or in any report to the Director, it shall promptly submit such facts or information (40 CFR 122,41(1)(8)]. Part Ill Page 14 of 1.0 11 PART IV DEFINITIONS ].. ALI See Clean Water Act. Permit No. NCG030000 2. Adverse Weather Adverse conditions are those that are dangerous or create inaccessibility for personnel, such as local flooding, high winds, or electrical storms, or situations that otherwise make sampling impractical. When adverse weather conditions prevent the collection of samples during the sample period, the permittee must take a substitute sample or perform a visual assessment during the next qualifying storm event. Documentation of an adverse event (with date, time and written narrative) and the rationale must be included with your SPPP records. Adverse weather does not exempt the permittee from having to file a monitoring report in accordance with the sampling schedule. Adverse events and failures to monitor must also be explained and reported on the relevant DMR. Allowable Nont rmwa ar s This general permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the stormwater conveyance system are: a. All other discharges that are authorized by a non-stormwater NPDES permit. b. Uncontaminated groundwater, foundation drains; air -conditioner condensate without added chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant flushings, water from footing drains, irrigation waters, Flows from riparian habitats and wetlands. c. Discharges resulting from fire -fighting or fire -fighting training, or emergency shower or eye wash as a result of use in the event of an emergency. 4. Best Management Practices (BMPs) Measures or practices used to reduce the amount of pollution entering surface waters- BMPs may take the form of a process, activity, or physical structure. More information on BMPs can he found at: bttp.././cfpub.epa.goy/npdes/stgEmwiAter/meftu2fl=p.a/index.cfm, 5. Bypass A bypass is the known diversion of stormwater from any portion of a stormwater control Facility including the collection system, which is not a designed or established operating mode for the facility. 6. Bulk Storage of Liquid Products Liquid raw materials, manufactured products, waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than 1,320 gallons. 7. Certificate of Covera The Certificate of Coverage (COC) is the cover sheet which accompanies a general permit upon issuance and lists the facility name, location, receiving stream, river basin, effective date of coverage under the general permit and is signed by the Director. 8. Clean Water Act The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33 USC 1251, et sect. 9. Division or DWQ The Division of Water Quality, Department of Environment anti Natural Resources. Part IV Page I of 4 Permit No. NCG030000 10. Director The Director of the Division of Water Quality, the permit issuing authority. 11. CMC The North Carolina Environmental Management Commission. l2. Grab,5ample An individual sample collected instantaneously. Grab samples that will be analyzed (quantitatively or qualitatively) must be taken within the first 30 minutes of discharge. 13. LJgzardous Substance Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act. 14. Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land treatment facility, a surface impoundment, an injection well, a hazardous waste long-term storage facility or a surface storage facility. 15. Measli_mWe stormEy-ent A storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval may not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and obtains approval from the local DWQ Regional Office. Two copies of this information and a written request letter shall be sent to the local DWQ Regional Office. After authorization by the DWQ Regional office, a written approval letter must be kept on site in the permittee's SPPP. 16, Municipal Separate Storm Sewer � tem (MS41 A stormwater collection system within an incorporated area of local self-government such as a city or town. 17, No Exposure A condition of no exposure means that all industrial materials and activities are protected by a storm resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or runoff. Industrial materials or activities include, but are not limited to, material handling equipment or activities, industrial machinery, raw materials, intermediate products, by-products, final products, or waste products. DWQ may grant a No Exposure Exclusion from NPDES stormwater permitting requirements only if a facility complies with the terms and conditions described in 40 CFR §122.26(g). 18.Intent The state application form which, when submitted to the Division, officially indicates the facility's notice of intent to seek coverage under a general permit. 1 19. Permit Issming The Director of the Division of Water Quality (see "Director" above). 20. Permittee The owner or operator issued a Certificate of Coverage pursuant to this general permit. I. Point Source Discharge gf Stormw,3ter ' Any discernible, confined and discrete conveyance including, but not specifically limited to, any pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be discharged to waters of the state. Part IV Page 2 of 4 11 Permit No. NC6030000 22. Representative When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple outfalls, the DW(1 may grant representative outfall status. Representative outfall status allows the permittee to perform analytical monitoring at a reduced number of outfalls. 23. Secondaly Containmen Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25-year, 24-hour storm event. ' 24, Section 313 Water Priority Chemical A chemical or chemical category which: b. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right - to -Know Act of 1986; c. Is present at or above threshold levels at a facility subject to SARA title 111, Section 313 reporting requirements; and d. Meets at least one of the following criteria: i. Is listed in appendix D of 40 CFR part 122 on Table II (organic priority pollutants), Table 111 (certain metals, cyanides, and phenols) or Table IV (certain toxic pollutants and hazardous substances); ii. Is listed as a hazardous substance pursuant to section 311(b)(2)(A) of the CWA at 40 CFR 116.4; or iii. Is a pollutant for which EPA has published acute or chronic water quality criteria. 25. Severe Property Damage Substantial physical damage to property, damage to the control facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. 26, Significant Materials includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic pellets; finished materials such as metallic products; ratio materials used in food processing or production; hazardous substances designated under section 101(14) of CERCLA; any chemical the facility is required to report pursuant to section 313 of Title Ill of SARA; fertilizers; pesticides; and waste products such as ashes, slag and sludge that have the potential to be released with stormwater discharges. 27, Significant Spills Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities under section 311 of the Clean Water Act (Ref: 40 CFR 11.0.3and 40 CFR 11.7.3) or section 102 of CERCLA (Ref: 40 CFR 302.4). 28. Stormwater Discharge Outfall (SDO) ' The point of departure of stormwater from a discernible, confined, or discrete conveyance, including but not limited to, storm sewer pipes, drainage ditches, channels, spillways, or channelized collection areas, from which stormwater flows directly or indirectly into waters of the State of North Carolina. 29. Stormwater Runoff The flow of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt. t 1 Part IV Page 3 of 4 1 Permit No. NCGO30000 ' 30. Stormwater Associated with Industrial Activity The discharge from any point source which is used for collecting and conveying stormwater and which is directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities or activities excluded from the NPDES program. 31. Stormwater Pollution Prevention Plan fSPPP) A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution potential of the site. 32. Total MAximum Daily Lod TMDU TMDLs are written plans for attaining and maintaining water quality standards, in all seasons, for a specific water body and pollutant. A list of approved TMDLs for the state of North Carolina can be found at http:Jjportal.ncdenr,orp/web/wq(ps/mtu/tnidl/tmdl. 33. Toxic Pollutant Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act. 34. Vehicle Maintenance Activity Vehicle 'rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning operations, or airport deicing operations. 35. Visible SedimentatiQU Solid particulate matter, both mineral and organic, that has been or is being transported by water, air, gravity, or ice from its site of origin which can be seen with the unaided eye. 36. 25-yeaL24hour Storn)-Event The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25 years. . Part IV Page 4 of 4